Malonga Feasibility Study Draft Appendix Combined.pdf

PDF 18 MB Posted

Attached to
RFP for PROPERTY MANAGEMENT OF MALONGA CASQUELOURD CENTER RESIDENTIAL UNITS
Solicitation number
421533
Issued by
Alameda County, California

About this file

This is a facilities assessment and building documentation package for the Malonga Casquelourd Center for the Arts located at 1428 Alice Street in Oakland, California, prepared for the City of Oakland's Project & Grant Management Division. The document consists of comprehensive architectural drawings, floor plans, and a detailed space inventory for the six-story historic building that contains performance spaces, studios, administrative offices, and 74 residential units. The feasibility study documentation, dated November 16, 2023, includes basement through sixth-floor floor plans, mezzanine levels, roof plans, exterior elevations in four directions, reflected ceiling plans for all levels, and a complete room-by-room inventory specifying square footage and ceiling heights for each space. The project (City Project #1006040) encompasses proposed improvements including new theater seating and rigging, studio upgrades with acoustical treatment and lighting systems, residential unit renovations with new plumbing fixtures and finishes, mechanical and electrical system upgrades, accessibility improvements, roofing and waterproofing repairs, and general paint and lighting enhancements throughout the facility.

The space inventory documents 234 individual rooms organized by floor level and functional category (administration, circulation, public spaces, support, and residential). The basement level contains classrooms, recording studios, mechanical systems, and support spaces totaling approximately 10,000 square feet. The first through third floors include performance venues, studios ranging from 394 to 3,872 square feet, administrative offices, and theatrical control rooms. The fourth through sixth floors contain 74 single-room occupancy residential units averaging 150 to 250 square feet each, with shared facilities including laundry, shower, and toilet facilities on each floor. The architectural documentation was prepared by ELS Architecture and Urban Design and provides the baseline building conditions and proposed scope of work for property management and renovation planning related to the related RFP for property management services issued by Oakland Parks, Recreation, & Youth Development (OPRYD).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

August 19, 2024

Malonga Casquelourd Center for the Arts Facilities Assessment -- Appendix

Malonga Casquelourd Center for the Arts Facilities Assessment – Appendix A

Space Inventory 8/19/2024

Space Inventory Room

Number Room Name Floor Level Space Function Area

Ceiling

Height

BASEMENT

ADMINISTRATION

B102 OFFICE BASEMENT ADMINISTRATION 128 SF 8' ‐ 8"

B103 OFFICE BASEMENT ADMINISTRATION 286 SF 9' ‐ 9"

BOH

132 MECH BASEMENT BOH 42 SF 9' ‐ 4 1/2"

B105 MECH BASEMENT BOH 109 SF 9' ‐ 0"

B108 ELECTRICAL BASEMENT BOH 497 SF 8' ‐ 10 1/4"

B110 MECHANICAL BASEMENT BOH 917 SF 8' ‐ 10 1/2"

B114 ELEVATOR MACH RM BASEMENT BOH 44 SF 10' ‐ 0"

B115 FREIGHT ELEV BASEMENT BOH 40 SF 10' ‐ 0"

B116K LIFT BASEMENT BOH 48 SF 13' ‐ 3"

B117 MECH BASEMENT BOH 160 SF 10' ‐ 0"

CIRCULATION

18 Room BASEMENT CIRCULATION 15 SF 10' ‐ 0"

B111 ANNEX STAIR BASEMENT CIRCULATION 236 SF 10' ‐ 0"

B112 ELEV VESTIBULE BASEMENT CIRCULATION 90 SF 10' ‐ 0"

B113 ANNEX STAIR 2 BASEMENT CIRCULATION 56 SF 10' ‐ 0"

B116L STAIR BASEMENT CIRCULATION 48 SF 10' ‐ 0"

B120 HALL SOUTH BASEMENT CIRCULATION 385 SF 10' ‐ 0"

B121 MAIN HALL BASEMENT CIRCULATION 923 SF 8' ‐ 10 1/4"

B126 HALL NORTH BASEMENT CIRCULATION 311 SF 7' ‐ 3 1/2"

B130 STAIR BASEMENT CIRCULATION 40 SF 10' ‐ 2"

B131 STAIR BASEMENT CIRCULATION 76 SF 10' ‐ 0"

B132 ELEV VEST BASEMENT CIRCULATION 576 SF 9' ‐ 4"

PUBLIC

B101 CLASSROOM BASEMENT PUBLIC 783 SF 10' ‐ 0"

B104 CLASSROOM BASEMENT PUBLIC 827 SF 9' ‐ 0"

B106 CLASSROOM BASEMENT PUBLIC 690 SF 9' ‐ 0"

B107 CLASSROOM BASEMENT PUBLIC 769 SF 9' ‐ 2"

B109 LAUNDRY BASEMENT PUBLIC 182 SF 8' ‐ 9 1/2"

B116 CLASSROOM STUDIO BASEMENT PUBLIC 1773 SF 10' ‐ 2"

B116A STUDIO BASEMENT PUBLIC 130 SF 7' ‐ 4 1/4"

B116B STUDIO BASEMENT PUBLIC 91 SF 8' ‐ 0 1/8"

B116C RECORDING RM 1 BASEMENT PUBLIC 32 SF 7' ‐ 6"

B116D RECORDING RM 2 BASEMENT PUBLIC 32 SF 7' ‐ 6"

B116E RECORDING RM 3 BASEMENT PUBLIC 32 SF 7' ‐ 6"

B116F RECORDING RM 4 BASEMENT PUBLIC 32 SF 7' ‐ 6"

B116G RECORDING RM 5 BASEMENT PUBLIC 42 SF 7' ‐ 6"

SUPPORT

B100 STOR 4 BASEMENT SUPPORT 119 SF 10' ‐ 2"

B104A CLOSET BASEMENT SUPPORT 72 SF 8' ‐ 2"

B107A CLOSET BASEMENT SUPPORT 6 SF 8' ‐ 8"

Malonga Casquelourd Center for the Arts Facilities Assessment ‐‐ Appendix B Page 1 of 8

Room

Number Room Name Floor Level Space Function Area

Ceiling

Height

B116H STOR BASEMENT SUPPORT 93 SF 8' ‐ 5"

B116J STOR BASEMENT SUPPORT 69 SF 7' ‐ 6"

B118 WOMEN BASEMENT SUPPORT 174 SF 8' ‐ 0"

B119 MEN BASEMENT SUPPORT 158 SF 8' ‐ 0"

B122 CHANGING RM 1 BASEMENT SUPPORT 82 SF 7' ‐ 4 1/2"

B123 CHANGING RESTROOM BASEMENT SUPPORT 44 SF 7' ‐ 4 1/2"

B124 CHANGING RM 2 BASEMENT SUPPORT 170 SF 7' ‐ 4 1/2"

B125 CHANGING RM 3 BASEMENT SUPPORT 72 SF 7' ‐ 4 1/2"

B127 STOR 1 BASEMENT SUPPORT 272 SF 10' ‐ 7"

B128 STOR 2 BASEMENT SUPPORT 333 SF 7' ‐ 3 1/2"

B129 STOR 3 BASEMENT SUPPORT 237 SF 10' ‐ 2"

FIRST FLOOR

N.I.C. RETAIL FIRST FLOOR 1201 SF 9' ‐ 3"

ADMINISTRATION

121 CONCESSIONS LOUNGE FIRST FLOOR ADMINISTRATION 403 SF 9' ‐ 7 1/2"

122 SECURITY FIRST FLOOR ADMINISTRATION 145 SF 9' ‐ 1 1/4"

123 BOX OFFICE FIRST FLOOR ADMINISTRATION 205 SF 9' ‐ 1 1/4"

125 OFFICE FIRST FLOOR ADMINISTRATION 179 SF 7' ‐ 11 1/2"

126 OFFICE FIRST FLOOR ADMINISTRATION 149 SF 8' ‐ 11 1/2"

CIRCULATION

113 STAIR FIRST FLOOR CIRCULATION 42 SF 9' ‐ 3"

120 THEATER LOBBY FIRST FLOOR CIRCULATION 1386 SF 17' ‐ 3"

124 RESID & STUDIO ENTRY FIRST FLOOR CIRCULATION 346 SF 9' ‐ 0"

127 LOBBY FIRST FLOOR CIRCULATION 493 SF 15' ‐ 5 1/2"

131 THEATER FOYER FIRST FLOOR CIRCULATION 260 SF 16' ‐ 0"

136 STAIR FIRST FLOOR CIRCULATION 60 SF 8' ‐ 8 1/2"

137 VESTIBULE FIRST FLOOR CIRCULATION 84 SF 7' ‐ 11 1/2"

140 STAIR FIRST FLOOR CIRCULATION 162 SF 7' ‐ 11 1/2"

141 OFF LEFT FIRST FLOOR CIRCULATION 47 SF 10' ‐ 0"

142 VESTIBULE FIRST FLOOR CIRCULATION 84 SF 8' ‐ 2"

143 STAIR FIRST FLOOR CIRCULATION 95 SF 7' ‐ 10"

A102 ANNEX VEST FIRST FLOOR CIRCULATION 89 SF 9' ‐ 9"

A111 ANNEX STAIR FIRST FLOOR CIRCULATION 160 SF 10' ‐ 0"

PUBLIC

128 THEATER FIRST FLOOR PUBLIC 1658 SF 28' ‐ 9"

A100 ANNEX CLASSROOM FIRST FLOOR PUBLIC 1198 SF 12' ‐ 0"

A101 ANNEX HALL FIRST FLOOR PUBLIC 641 SF 15' ‐ 4 1/4"

A103 ANNEX UTILITY FIRST FLOOR PUBLIC 115 SF 9' ‐ 9"

A104 ANNEX CLOSET FIRST FLOOR PUBLIC 112 SF 18' ‐ 3"

SUPPORT

133 GENDER NEUTRAL ACC FIRST FLOOR SUPPORT 51 SF 7' ‐ 4 1/2"

134 GENDER NEUTRAL ACC FIRST FLOOR SUPPORT 51 SF 7' ‐ 4 1/2"

135 MENS RESTROOM FIRST FLOOR SUPPORT 73 SF 7' ‐ 4 1/2"

138 GENDER NEUTRAL FIRST FLOOR SUPPORT 38 SF 7' ‐ 4 1/2"

Malonga Casquelourd Center for the Arts Facilities Assessment ‐‐ Appendix B Page 2 of 8

Number Room Name Floor Level Space Function Area

Ceiling

Height

139 GENDER NEUTRAL FIRST FLOOR SUPPORT 53 SF 7' ‐ 4 1/2"

144 CLOSET FIRST FLOOR SUPPORT 10 SF 10' ‐ 6 1/2"

FIRST FLOOR MEZZ

ADMINISTRATION

M100 OFFICE FIRST FLOOR MEZZ ADMINISTRATION 982 SF 7' ‐ 6"

M101 OFFICE FIRST FLOOR MEZZ ADMINISTRATION 315 SF 7' ‐ 6"

CIRCULATION

M103 VESTIBULE FIRST FLOOR MEZZ CIRCULATION 117 SF 9' ‐ 0"

M136 STAIR FIRST FLOOR MEZZ CIRCULATION 107 SF 9' ‐ 0"

M140 STAIR FIRST FLOOR MEZZ CIRCULATION 140 SF 9' ‐ 0"

PUBLIC

129 CONTROL RM LOWER FIRST FLOOR MEZZ PUBLIC 132 SF 14' ‐ 8 13/16"

130 CONTROL RM UPPER FIRST FLOOR MEZZ PUBLIC 110 SF 11' ‐ 0"

SUPPORT

M102 RESTROOM FIRST FLOOR MEZZ SUPPORT 23 SF 6' ‐ 10 1/4"

M104 STORAGE FIRST FLOOR MEZZ SUPPORT 357 SF 8' ‐ 0"

M105 STORAGE FIRST FLOOR MEZZ SUPPORT 94 SF 6' ‐ 9"

SECOND FLOOR

ADMINISTRATION

201 OFFICE SECOND FLOOR ADMINISTRATION 235 SF 8' ‐ 2"

202 OFFICE SECOND FLOOR ADMINISTRATION 330 SF 8' ‐ 4"

221 OFFICE SECOND FLOOR ADMINISTRATION 329 SF 7' ‐ 9"

CIRCULATION

204 HALL SECOND FLOOR CIRCULATION 610 SF 8' ‐ 0"

210 STAIR SECOND FLOOR CIRCULATION 101 SF 10' ‐ 0"

218 LOBBY SECOND FLOOR CIRCULATION 297 SF 8' ‐ 0"

219 STAIR SECOND FLOOR CIRCULATION 227 SF 9' ‐ 6"

220 HALL SECOND FLOOR CIRCULATION 211 SF 8' ‐ 0"

222 STAIR SECOND FLOOR CIRCULATION 179 SF 8' ‐ 0"

PUBLIC

216 STUDIO A SECOND FLOOR PUBLIC 3872 SF 15' ‐ 7"

217 STUDIO B SECOND FLOOR PUBLIC 854 SF 15' ‐ 11"

SUPPORT

203 CLOSET SECOND FLOOR SUPPORT 47 SF 8' ‐ 5"

205 CLOSET SECOND FLOOR SUPPORT 58 SF 8' ‐ 5"

206 MENS RESTROOM SECOND FLOOR SUPPORT 234 SF 7' ‐ 11"

207 WOMENS RESTROOM SECOND FLOOR SUPPORT 347 SF 7' ‐ 11"

208 CLOSET SECOND FLOOR SUPPORT 33 SF 7' ‐ 11"

209 CLOSET SECOND FLOOR SUPPORT 58 SF 8' ‐ 6"

223 GENDER NEUTRAL ACC SECOND FLOOR SUPPORT 95 SF 8' ‐ 3"

STUDIO X

ADMINISTRATION

Malonga Casquelourd Center for the Arts Facilities Assessment ‐‐ Appendix B Page 3 of 8

Number Room Name Floor Level Space Function Area

Ceiling

Height

212 OFFICE STUDIO X ADMINISTRATION 220 SF 7' ‐ 10"

CIRCULATION

211 HALL STUDIO X CIRCULATION 110 SF 7' ‐ 7"

PUBLIC

214 STUDIO X STUDIO X PUBLIC 394 SF 13' ‐ 8 1/2"

SUPPORT

213 GENDER NEUTRAL STUDIO X SUPPORT 26 SF 7' ‐ 7"

215 STOR STUDIO X SUPPORT 253 SF 13' ‐ 8 1/2"

SECOND FLOOR MEZZ

ADMINISTRATION

202M OFFICE SECOND FLOOR MEZ ADMINISTRATION 439 SF 8' ‐ 3"

203M CONFERENCE RM A SECOND FLOOR MEZ ADMINISTRATION 477 SF 8' ‐ 5 1/2"

207M OFFICE SECOND FLOOR MEZ ADMINISTRATION 431 SF 8' ‐ 4 1/2"

CIRCULATION

201M LOBBY SECOND FLOOR MEZ CIRCULATION 284 SF 8' ‐ 3"

205M HALL SECOND FLOOR MEZ CIRCULATION 587 SF 7' ‐ 7"

210M STAIR SECOND FLOOR MEZ CIRCULATION 99 SF 10' ‐ 0"

219M STAIR SECOND FLOOR MEZ CIRCULATION 227 SF 9' ‐ 6"

PUBLIC

212M LIGHTING BOOTH SECOND FLOOR MEZ PUBLIC 222 SF 8' ‐ 3 1/2"

SUPPORT

204M STOR SECOND FLOOR MEZ SUPPORT 88 SF 8' ‐ 2"

206M CLOSET SECOND FLOOR MEZ SUPPORT 107 SF 7' ‐ 7"

208M STORAGE SECOND FLOOR MEZ SUPPORT 176 SF 8' ‐ 3"

209M STORAGE SECOND FLOOR MEZ SUPPORT 168 SF 7' ‐ 11"

211M STOR SECOND FLOOR MEZ SUPPORT 232 SF 6' ‐ 1"

213M MENS RESTROOM SECOND FLOOR MEZ SUPPORT 275 SF 7' ‐ 9"

THIRD FLOOR

ADMINISTRATION

303 OFFICE THIRD FLOOR ADMINISTRATION 216 SF 12' ‐ 5"

310B OFFICE THIRD FLOOR ADMINISTRATION 169 SF 10' ‐ 0"

310C OFFICE THIRD FLOOR ADMINISTRATION 196 SF 10' ‐ 0"

310D OFFICE THIRD FLOOR ADMINISTRATION 195 SF 10' ‐ 0"

310E OFFICE THIRD FLOOR ADMINISTRATION 140 SF 10' ‐ 0"

310F OFFICE THIRD FLOOR ADMINISTRATION 314 SF 10' ‐ 0"

310G OFFICE THIRD FLOOR ADMINISTRATION 202 SF 10' ‐ 0"

310H OFFICE THIRD FLOOR ADMINISTRATION 102 SF 10' ‐ 0"

310J OFFICE THIRD FLOOR ADMINISTRATION 256 SF 10' ‐ 0"

310K OFFICE THIRD FLOOR ADMINISTRATION 116 SF 10' ‐ 0"

310L OFFICE THIRD FLOOR ADMINISTRATION 115 SF 10' ‐ 0"

310N OFFICE THIRD FLOOR ADMINISTRATION 186 SF 10' ‐ 0"

312 OFFICE THIRD FLOOR ADMINISTRATION 100 SF 10' ‐ 0"

317B OFFICE THIRD FLOOR ADMINISTRATION 121 SF 7' ‐ 5"

Malonga Casquelourd Center for the Arts Facilities Assessment ‐‐ Appendix B Page 4 of 8

Number Room Name Floor Level Space Function Area

Ceiling

Height

317C OFFICE THIRD FLOOR ADMINISTRATION 147 SF 10' ‐ 0"

317D OFFICE THIRD FLOOR ADMINISTRATION 250 SF 8' ‐ 10 1/8"

317E OFFICE THIRD FLOOR ADMINISTRATION 140 SF 8' ‐ 10 1/8"

317F OFFICE THIRD FLOOR ADMINISTRATION 92 SF 8' ‐ 10 1/2"

CIRCULATION

301 LOBBY THIRD FLOOR CIRCULATION 718 SF 13' ‐ 0"

305 LOBBY THIRD FLOOR CIRCULATION 766 SF 17' ‐ 3 1/2"

306 VEST THIRD FLOOR CIRCULATION 161 SF 10' ‐ 0"

308 VEST THIRD FLOOR CIRCULATION 47 SF 12' ‐ 5"

310A HALL THIRD FLOOR CIRCULATION 222 SF 10' ‐ 0"

311 HALL THIRD FLOOR CIRCULATION 594 SF 7' ‐ 8"

313 STAIR THIRD FLOOR CIRCULATION 104 SF 10' ‐ 0"

317A HALL THIRD FLOOR CIRCULATION 192 SF 7' ‐ 3 1/4"

319 STAIR THIRD FLOOR CIRCULATION 223 SF 15' ‐ 7"

PUBLIC

307 STUDIO E THIRD FLOOR PUBLIC 3444 SF 15' ‐ 6 1/2"

315 STUDIO D THIRD FLOOR PUBLIC 929 SF 12' ‐ 2 1/2"

316 STUDIO C THIRD FLOOR PUBLIC 2363 SF 12' ‐ 6 1/4"

SUPPORT

302 WOMENS RESTROOM THIRD FLOOR SUPPORT 408 SF 7' ‐ 9"

304 STOR THIRD FLOOR SUPPORT 104 SF 12' ‐ 5"

309 WOMENS RESTROOM THIRD FLOOR SUPPORT 414 SF 8' ‐ 10"

314 MENS RESTROOM THIRD FLOOR SUPPORT 239 SF 7' ‐ 9 1/2"

THIRD FLOOR MEZZ

BOH

M302 CONTROL ROOM THIRD FLOOR MEZZ BOH 163 SF 7' ‐ 9"

CIRCULATION

M303 HALLWAY THIRD FLOOR MEZZ CIRCULATION 188 SF 7' ‐ 9"

M313 STAIR THIRD FLOOR MEZZ CIRCULATION 93 SF 10' ‐ 0"

M332 STAIR THIRD FLOOR MEZZ CIRCULATION 57 SF 10' ‐ 0"

SUPPORT

M301 KITCHEN THIRD FLOOR MEZZ SUPPORT 529 SF 6' ‐ 5"

M304 CLOSET THIRD FLOOR MEZZ SUPPORT 176 SF 6' ‐ 8"

M305 BATH THIRD FLOOR MEZZ SUPPORT 44 SF 8' ‐ 0"

FOURTH FLOOR

CIRCULATION

424 HALL FOURTH FLOOR CIRCULATION 1046 SF 8' ‐ 9"

430 STAIR FOURTH FLOOR CIRCULATION 39 SF 10' ‐ 0"

431 STAIR FOURTH FLOOR CIRCULATION 58 SF 10' ‐ 0"

432 STAIR FOURTH FLOOR CIRCULATION 50 SF 10' ‐ 0"

RESID

401 UNIT FOURTH FLOOR RESID 252 SF 8' ‐ 10"

402 UNIT FOURTH FLOOR RESID 199 SF 8' ‐ 10"

Malonga Casquelourd Center for the Arts Facilities Assessment ‐‐ Appendix B Page 5 of 8

Number Room Name Floor Level Space Function Area

Ceiling

Height

403 UNIT FOURTH FLOOR RESID 224 SF 8' ‐ 10"

404 UNIT FOURTH FLOOR RESID 231 SF 8' ‐ 10"

405 UNIT FOURTH FLOOR RESID 241 SF 8' ‐ 10"

406 UNIT FOURTH FLOOR RESID 244 SF 8' ‐ 10"

407 UNIT FOURTH FLOOR RESID 228 SF 8' ‐ 10"

408 UNIT FOURTH FLOOR RESID 186 SF 8' ‐ 10"

409 UNIT FOURTH FLOOR RESID 225 SF 7' ‐ 6"

410 UNIT FOURTH FLOOR RESID 248 SF 8' ‐ 10"

411 UNIT FOURTH FLOOR RESID 146 SF 8' ‐ 10"

412 UNIT FOURTH FLOOR RESID 143 SF 8' ‐ 10"

413 UNIT FOURTH FLOOR RESID 160 SF 8' ‐ 10"

414 UNIT FOURTH FLOOR RESID 153 SF 8' ‐ 10"

415 UNIT FOURTH FLOOR RESID 201 SF 8' ‐ 10"

416 UNIT FOURTH FLOOR RESID 159 SF 8' ‐ 10"

416A UNIT FOURTH FLOOR RESID 176 SF 8' ‐ 9"

417 UNIT FOURTH FLOOR RESID 207 SF 8' ‐ 10"

418 UNIT FOURTH FLOOR RESID 238 SF 8' ‐ 10"

419 UNIT FOURTH FLOOR RESID 203 SF 8' ‐ 10"

420 UNIT FOURTH FLOOR RESID 240 SF 8' ‐ 10"

421 UNIT FOURTH FLOOR RESID 235 SF 8' ‐ 10"

422 UNIT FOURTH FLOOR RESID 165 SF 8' ‐ 9"

423 UNIT FOURTH FLOOR RESID 206 SF 8' ‐ 10"

425 SHOWER FOURTH FLOOR RESID 32 SF 7' ‐ 6"

426 TOILET FOURTH FLOOR RESID 19 SF 7' ‐ 6"

SUPPORT

427 TRASH FOURTH FLOOR SUPPORT 21 SF 7' ‐ 6"

428 LAUNDRY FOURTH FLOOR SUPPORT 98 SF 7' ‐ 11"

429 CLOSET FOURTH FLOOR SUPPORT 13 SF 7' ‐ 6"

433 CLOSET FOURTH FLOOR SUPPORT 12 SF 7' ‐ 6"

FIFTH FLOOR

CIRCULATION

526 HALL FIFTH FLOOR CIRCULATION 970 SF 8' ‐ 2"

530 STAIR FIFTH FLOOR CIRCULATION 56 SF 10' ‐ 0"

531 STAIR FIFTH FLOOR CIRCULATION 58 SF 10' ‐ 0"

RESID

151 TOILET FIFTH FLOOR RESID 21 SF 7' ‐ 6"

501 UNIT FIFTH FLOOR RESID 252 SF 8' ‐ 5"

502 UNIT FIFTH FLOOR RESID 199 SF 8' ‐ 9"

503 UNIT FIFTH FLOOR RESID 224 SF 8' ‐ 9"

504 UNIT FIFTH FLOOR RESID 231 SF 8' ‐ 9"

505 UNIT FIFTH FLOOR RESID 241 SF 8' ‐ 9"

506 UNIT FIFTH FLOOR RESID 244 SF 8' ‐ 9"

507 UNIT FIFTH FLOOR RESID 228 SF 8' ‐ 9"

508 UNIT FIFTH FLOOR RESID 186 SF 8' ‐ 9"

Malonga Casquelourd Center for the Arts Facilities Assessment ‐‐ Appendix B Page 6 of 8

Number Room Name Floor Level Space Function Area

Ceiling

Height

509 UNIT FIFTH FLOOR RESID 238 SF 8' ‐ 9"

510 UNIT FIFTH FLOOR RESID 272 SF 8' ‐ 9"

511 UNIT FIFTH FLOOR RESID 168 SF 8' ‐ 9"

512 UNIT FIFTH FLOOR RESID 152 SF 8' ‐ 9"

513 UNIT FIFTH FLOOR RESID 160 SF 8' ‐ 9"

514 UNIT FIFTH FLOOR RESID 155 SF 8' ‐ 9"

515 UNIT FIFTH FLOOR RESID 204 SF 8' ‐ 9"

516 UNIT FIFTH FLOOR RESID 146 SF 8' ‐ 9"

517 UNIT FIFTH FLOOR RESID 198 SF 8' ‐ 9"

518 UNIT FIFTH FLOOR RESID 156 SF 8' ‐ 9"

519 UNIT FIFTH FLOOR RESID 207 SF 8' ‐ 9"

520 UNIT FIFTH FLOOR RESID 238 SF 8' ‐ 9"

521 UNIT FIFTH FLOOR RESID 203 SF 8' ‐ 9"

522 UNIT FIFTH FLOOR RESID 240 SF 8' ‐ 9"

523 UNIT FIFTH FLOOR RESID 235 SF 8' ‐ 10"

524 UNIT FIFTH FLOOR RESID 165 SF 8' ‐ 9"

525 UNIT FIFTH FLOOR RESID 206 SF 8' ‐ 9"

527 SHOWER FIFTH FLOOR RESID 32 SF 7' ‐ 6"

528 TOILET FIFTH FLOOR RESID 19 SF 7' ‐ 6"

SUPPORT

529 UTILITY FIFTH FLOOR SUPPORT 12 SF 7' ‐ 6"

532 TRASH FIFTH FLOOR SUPPORT 20 SF 7' ‐ 6"

533 CLOSET FIFTH FLOOR SUPPORT 4 SF 7' ‐ 6"

SIXTH FLOOR

CIRCULATION

626 HALL SIXTH FLOOR CIRCULATION 970 SF 8' ‐ 2"

630 STAIR SIXTH FLOOR CIRCULATION 56 SF 10' ‐ 0"

631 STAIR SIXTH FLOOR CIRCULATION 58 SF 8' ‐ 2"

RESID

601 UNIT SIXTH FLOOR RESID 253 SF 8' ‐ 9"

602 UNIT SIXTH FLOOR RESID 199 SF 8' ‐ 9"

603 UNIT SIXTH FLOOR RESID 225 SF 8' ‐ 9"

604 UNIT SIXTH FLOOR RESID 232 SF 8' ‐ 9"

605 UNIT SIXTH FLOOR RESID 242 SF 8' ‐ 9"

606 UNIT SIXTH FLOOR RESID 244 SF 8' ‐ 9"

607 UNIT SIXTH FLOOR RESID 229 SF 8' ‐ 9"

608 UNIT SIXTH FLOOR RESID 187 SF 8' ‐ 10"

609 UNIT SIXTH FLOOR RESID 238 SF 8' ‐ 9"

610 UNIT SIXTH FLOOR RESID 272 SF 8' ‐ 10"

611 UNIT SIXTH FLOOR RESID 168 SF 8' ‐ 9"

612 UNIT SIXTH FLOOR RESID 152 SF 8' ‐ 9"

613 UNIT SIXTH FLOOR RESID 156 SF 8' ‐ 9"

614 UNIT SIXTH FLOOR RESID 155 SF 8' ‐ 10"

615 UNIT SIXTH FLOOR RESID 204 SF 8' ‐ 10"

Malonga Casquelourd Center for the Arts Facilities Assessment ‐‐ Appendix B Page 7 of 8

Number Room Name Floor Level Space Function Area

Ceiling

Height

616 UNIT SIXTH FLOOR RESID 146 SF 8' ‐ 11"

617 UNIT SIXTH FLOOR RESID 198 SF 8' ‐ 9"

618 UNIT SIXTH FLOOR RESID 156 SF 8' ‐ 9"

619 UNIT SIXTH FLOOR RESID 207 SF 8' ‐ 9"

620 UNIT SIXTH FLOOR RESID 238 SF 8' ‐ 9"

621 UNIT SIXTH FLOOR RESID 203 SF 8' ‐ 9"

622 UNIT SIXTH FLOOR RESID 240 SF 8' ‐ 9"

623 UNIT SIXTH FLOOR RESID 235 SF 8' ‐ 9"

624 UNIT SIXTH FLOOR RESID 165 SF 8' ‐ 9"

625 UNIT SIXTH FLOOR RESID 206 SF 8' ‐ 9"

SUPPORT

627 TRASH SIXTH FLOOR SUPPORT 20 SF 8' ‐ 9"

628 SHOWER SIXTH FLOOR SUPPORT 32 SF 8' ‐ 9"

629 TOILET SIXTH FLOOR SUPPORT 19 SF 7' ‐ 6"

632 TOILET SIXTH FLOOR SUPPORT 21 SF 7' ‐ 6"

633 CLOSET SIXTH FLOOR SUPPORT 4 SF 7' ‐ 6"

Malonga Casquelourd Center for the Arts Facilities Assessment ‐‐ Appendix B Page 8 of 8

PROJECT SITE

H A

R R

IS

O

N S

T

A L

IC

E S

T

14TH ST

CITY OF OAKLAND MAPLOCATION MAP

PROJECT & GRANT

MANAGEMENT DIVISION

CIP COORDINATOR

PROJECT & GRANT

MANAGEMENT DIVISION

SUPERVISOR

CONSTRUCTION MANAGEMENT

DIVISION

PRINCIPAL CIVIL ENGINEER

CITY ADMINISTRATOR OFFICE

ADA PROGRAMS DIVISION MANAGER

HUMAN SERVICES DEPARTMENT

MANAGER

FACILITIES SERVICES DIVISION

MANAGER

BUREAU OF MAINTENANCE &

INTERNAL SYSTEMS

ASSISTANT DIRECTOR

CHECKED BY

DESIGNED BY

DRAWN BY

PROJECT NO.

SHEET NO.

OF

SCALE:

DATE:

1006040

MALONGA CASQUELOURD CENTER FOR THE ARTS

1428 ALICE STREET

CITY PROJECT #: 1006040

NJ

Designer

ISSUE

DATE

A000

No. BY DATE REFERENCE

SHEET INDEX

ADMINISTRATIVE

A000 COVER SHEET

ARCHITECTURE

A200 BASEMENT FLOOR PLAN

A201 FIRST FLOOR PLAN

A201M FIRST FLOOR MEZZANINE

A202 SECOND FLOOR

A202M SECOND FLOOR MEZZANINE

A203 THIRD FLOOR

A203M THIRD FLOOR MEZZANINE

A204 FOURTH FLOOR

A205 FIFTH FLOOR

A206 SIXTH FLOOR

A207 ROOF PLAN

A300 EXTERIOR EAST ELEVATION

A301 EXTERIOR NORTH ELEVATION

A302 EXTERIOR SOUTH ELEVATION

A303 EXTERIOR WEST ELEVATION

A600 BASEMENT REFLECTED CEILING PLAN

A601 FIRST FLOOR REFLECTED CEILING PLAN

A602 FIRST FLOOR MEZZ REFLECTED CEILING PLAN

A603 SECOND FLOOR REFLECTED CEILING PLAN

A604 SECOND FLOOR MEZZ REFLECTED CEILING PLAN

A605 THIRD FLOOR REFLECTED CEILING PLAN

A606 THIRD FLOOR MEZZ REFLECTED CEILING PLAN

A607 FOURTH FLOOR REFLECTED CEILING PLAN

A608 FIFTH FLOOR REFLECTED CEILING PLAN

A609 SIXTH FLOOR REFLECTED CEILING PLAN

ASSISTANT DIRECTOR, OPW

BUREAU OF DESIGN AND CONSTRUCTION

SIEW-CHIN YEONG, P.E.

FEASIBILITY STUDY BUILDING DOCUMENTATION

26111/16/23

COST ESTIMATE

SCOPING NOTES

JULY 15, 2024

ELS ARCHIECTURE AND

URBAN DESIGN

DN

UP

UP

UP

UP

UP

UP

DN

UP

UP

MECH

783 SF

CLASSROOM

B101

WOMEN

B118

MEN

B119

STOR

B116H

RECORDING

RM 1

B116C

RECORDING

RM 2

B116D

RECORDING

RM 3

B116E

RECORDING

RM 4

B116F

91 SF

STUDIO

B116B

130 SF

STUDIO

B116A

ELEVATOR

MACH RM

B114

ELEV

VESTIBULE

B112

MECH

B117

CHANGING

RESTROOM

B123

CHANGING

RM 2

B124

CHANGING

RM 3

B125

128 SF

OFFICE

B102

STOR 1

B127

CLOSET

B104A286 SF

OFFICE

B103

STOR 4

B100

HALL NORTH

B126

RECORDING

RM 5

B116G

STOR

B116J

1773 SF

CLASSROOM

STUDIO

B116

MECHANICAL

B110

ELEV VEST

B132

MECH

B105

827 SF

CLASSROOM

B104

690 SF

CLASSROOM

B106

ELECTRICAL

B108

769 SF

CLASSROOM

B107

ANNEX

STAIR 2

B113

CHANGING

RM 1

B122

STOR 3

B129

LAUNDRY

B109

A B C D E F G H

K NL MI J

3/4" / 1'-0"

LIFT

B116K

A300 1

A302

A3031

A301

CLOSET

B107A

UNCOCCUPIED SPACE

BELOW STAGE FLOOR

MAIN HALL

B121

HALL SOUTH

B120

ANNEX STAIR

B111

STOR 2

B128

STAIR

B116L

STAIR

B130

STAIR

B131

ELEV 2 ELEV 1

FREIGHT

ELEV 3

ANNEX

STAIR 2

B113

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A200MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

BASEMENT FLOOR PLAN

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - BASEMENT

No. DATE BY REFERENCE

PROJECT

NORTH

26211/16/23

BASEMENT IMPROVEMENTS:

- NEW PAINT AND FLOOR FINISHES IN

CLASSROOMS AND HALLWAYS

- NEW LED LIGHTING THROUGHOUT

- OPTION TO UPGRADE ELECTRICAL SERVICE BY

BUILDING A NEW VAULT IN AN NEW LOCATION

UNDER THE SIDEWALK (EXISTING SERVICE TO

REMAIN OPERATIONAL DURING CONSTRUCTION

NEW PLUMBING

FIXTURES. SEE

NOTE ON A201

NEW RECORDING

EQUIPMENT

SEE WATERPROORING

ASSESSMENT FOR

REPAIRS IN THIS AREA

VAULT

UNDER

SIDEWALK

LINE OF THEATER

ABOVE

NEW RECESSED AREA

ABOVE FOR SLOPED

SEATING --SEE

THEATER SKETCH

UP

UP

UP

UP

DN

DN

DN

DN

DN

DN

UP

SECURITY

CONCESSIONS

LOUNGE

179 SF

OFFICE

149 SF

OFFICE

LOBBY

RESID &

STUDIO

ENTRY

MENS

RESTROOM

GENDER

NEUTRAL

VESTIBULE

GENDER

NEUTRAL

1386 SF

THEATER

LOBBY

THEATER

FOYER

A B C D E F G H

7' - 8" 10' - 8 1/2" 10' - 8 1/2" 10' - 8 1/2" 10' - 8 1/2" 10' - 8 1/2" 10' - 8 1/2"

K N

16' - 4 29/32" 16' - 4 3/4" 16' - 4 5/32"

L MI J

1198 SF

ANNEX

CLASSROOM

A100

ANNEX

UTILITY

A103

ANNEX

VEST

A102

ANNEX

CLOSET

A104

/8

BOX OFFICE

ELEV 2 ELEV 1

641 SF

ANNEX HALL

A101

CONTROL RM

LOWER

A300 1

A302

A3031

A301

ANNEX STAIR

A111

RETAIL

N.I.C.

STAIR

STAIR

FREIGHT

ELEV 3

STAIR

THEATER

VESTIBULE

OFF LEFT

STAIR

CLOSET

A L

IC

E

S T

R E

E T

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A201MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

FIRST FLOOR PLAN

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - FIRST FLOOR

No. DATE BY REFERENCE

PROJECT

NORTH

26311/16/23

UPGRADE TO

FLY LOFT. PROVIDE NEW

THEATRICAL RIGGING

AND LIGHTING

NEW MOVABLE

SEATING IN THIS

AREA

NEW THEATER SEATS,

AND CARPET OVER

EXISTING RISERS - SEE

SKETCH FOR

CONFIGURATION

NEW ACOUSTICAL

WALL AND CEILING

TREATMENT

PROVIDE NEW

HOUSE LIGHTING

THROUGHOUT

THEATER

'-1

3/

4"

PROVIDE NEW ACCESSIBLE

DRESSING ROOMS IN THIS

AREA, INCLUDING

ACCESSIBLE TOILET AND

SHOWER

REPAINT LOBBY AND

PROVIDE NEW LIGHTING.

REFURBISH TILE, STAINED

GLASS AND (E)

SUSPENDED LIGHT

FIXTURES

GENERAL NOTES:

- PROVIDE NEW PAINT AND LIGHTING THROUGHOUT

- SEE MECHANICAL/PLUMBING NARRATIVE FOR

MECHANICAL AND PLUMBING WORK

- SEE ELECTRICAL NARRATIVE FOR ELECTRICAL WORK

- PROVIDE NEW BUILDING-WIDE INTERCOM SYSTEM

- EXTERIOR WORK INCLUDES PAINTING AND

WATERPROOFING REPAIRS AS REQUIRED. SEE ROOFING

AND WATERPROOFING REPORT FOR ADDITIONAL

INFORMATION

- PHASING: WORK IS TO BE PHASED SUCH THAT THE

BUILDIN MAY BE OCCUPIED DURING CONSTRUCTION.

SEE ADDITIONAL MECHANICAL AND ELECTRICAL

PHASING NOTES. RESIDENTIAL WORK IS TO BE PHASED

BY FLOOR. WORD ON STUDIOS IS TO BE PHASED SUCH

THAT WHEN ONE STUDIO OF OFF LINE, OTHERS ARE

AVAILABLE FOR USE.

- RESIDENTIAL UNITS: PROVIDE NEW PLUMBING

FIXTURES, AND LIGHTING, FLOOR FINISHES AND PAINT

NEW FLOOR

FINISH, PAINT,

CEILING AND

LIGHTING

NEW WINDOW

COVERINGS

NEW FLOOR

FINISH,

LIGHTING, AND

PAINT

NEW CABINETS

AND PLUMBING

FIXTURES

NEW SLOPED

SEATING AREA-

SEE ATTACHED

SKETCH

NEW CONTROL ROOM

NEW THEATER

SEAT RISERS -

SEE SKETCH

RESTORE

PROSCENIUM

ARCH

REMOVE

CENTER EXIT

UPPER SEATING

AREA

NEW RISERS

LOWER

SEATING AREA

FLAT FLOOR/ STAGE

EXTENSION

STAGE WITH

FLY LOFT

EXISTING RESTROOMS TO RECEIVE NEW

LIGHTING, FINISHES AND FIXTURES WITH

ACCESS UPGRADES AS REQUIRED,

TYPICAL ALL FLOORS

NEW ACCESSIBLE

PATH OF TRAVEL

TO ELEVATOR

NEW STEEL FRAMING

AND CONCRETE FLOOR

AT WOOD FRAME INFILL

FLOOR AREA

STRUCTURAL UPGRADE TO

PERFORMANCE

AREA

WINGS WINGS

ADD OR SUBTRACT ROWS

OF SEATS DEPENDING ON

HOW MUCH

PERFORMANCE AREA IS

NEEDED

SLOPED FLOOR

REMOVE LAST

ROWS OF SEATING

NEW RISERS

MODIFY

EXISTING RISERS

NEW SEATS AND

FLOOR FINISHES

CONCEPTUAL THEATER SEATING LAYOUT

7/5/2024

FLAT FLOOR

A201A

DN

DN

DN

STORAGE

M105

STORAGE

M104

982 SF

OFFICE

M100

315 SF

OFFICE

M101

RESTROOM

M102

A B C D E F G H

K NL MI J

OPEN TO BELOW

A300 1

A302

A3031

A301

VESTIBULE

M103

ELEV 2 ELEV 1

FREIGHT

ELEV 3

STAIR

M136

OPEN TO BELOW

STAIR

M140

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A201MMALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

FIRST FLOOR MEZZANINE

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - FIRST FLOOR MEZZANINE

No. DATE BY REFERENCE

PROJECT

NORTH

26411/16/23

NEW PAINT, LIGHTING,

CEILING AND FLOOR

CARPET, TYPICAL

CONTROL

ROOM

ACCESSIBLE

PATH OF TRAVEL

FROM FREIGHT

ELEVATOR

SEE SKETCH

FOR REMAINDER

OF PLAN

NEW WALLS

NEW

ACCESSIBLE

SEATING AND

COMPANION

SEATING

NEW WALL

DN

DN

UP

329 SF

OFFICE

GENDER

NEUTRAL ACC

854 SF

STUDIO B

3872 SF

STUDIO A

235 SF

OFFICE

CLOSET

330 SF

OFFICE

CLOSET

MENS

RESTROOM

WOMENS

RESTROOM

CLOSET

CLOSET

A B C D E F G H

K NL MI J

OPEN TO BELOW

A300 1

A302

A3031

A301

ELEV 2 ELEV 1

FREIGHT

ELEV 3

LOBBY

HALL

STAIR

STAIR

HALL

STAIR

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A202MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

SECOND FLOOR

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - SECOND FLOOR

No. DATE BY REFERENCE

PROJECT

NORTH

26511/16/23

REMOVE EXISTING PIPE

GRID AND CEILING.

PROVIDE NEW LINEAR

WOOD CEILING WITH

ACOUSTICAL BACKING,

LIGHTING, CEILING FANS.

PROVIDE DUCTING FOR

NEW MECHANICAL SYSTEM

PROVIDE NEW WINDOW

SHADES WITH SUNSHADE

AND BLACKOUT SHADE

REFURBISH EXISTING

WINDOWS AND SEAL FOR

SOUND AND AIR/WATER

INFILTRATION

PROTECT

EXISTING FLOOR

TO REMAIN

NEW CEILING WITH

ACOUSTICAL

TREATMENT AND

LIGHTING, NEW PAINT.

PROTECT EXISTING

FLOOR

NEW LIGHTING,

QCARPET AND

PAINT, TYPICALNEW CEILINGS, LIGHTING,

FLOORING AND PAINT TYPICAL

FOR OFFICE SPACES AND

HALLWAYS

REMOVE

RADIATORS

NEW PLUMBING

FIXTURES,

LIGHTING, AND

FINSIHES

LIGHTING

BOOTH

212M

MENS

RESTROOM

213M

439 SF

OFFICE

202M

STOR

204M

477 SF

CONFERENCE

RM A

203M

CLOSET

206M

431 SF

OFFICE

207M

STORAGE

208M

STORAGE

209M

STAIR

210M

STOR

211M

A B C D E F G H

K NL MI J

OPEN TO BELOW

OPEN TO BELOW

OPEN TO BELOW

OPEN TO BELOW

A300 1

A302

A3031

A301

ELEV 2 ELEV 1

FREIGHT

ELEV 3

STAIR

219M

LOBBY

201M

HALL

205M

220 SF

OFFICE

394 SF

STUDIO X

253 SF

STOR

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A202MMALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

SECOND FLOOR MEZZANINE

ISSUE

DATE

1/8" = 1'-0"

FLOOR PLAN - SECOND FLOOR MEZZANINE

No. DATE BY REFERENCE

PROJECT

NORTH

26611/16/23

BLACK BOX STUDIO - PROVIDE

NEW THEATRICAL LIGHTING

AND AV SYSTEMS, NEW

LIGHTING GRID, PAINT, FLOOR

FINISHES, ACOUSTICAL

TREATMENT

NEW CEILINGS, LIGHTING,

FLOORING AND PAINT TYPICAL

FOR OFFICE SPACES AND

HALLWAYS

NEW PLUMBING

FIXTURES,

LIGHTING, AND

FINSIHES

WOMENS

RESTROOM

2363 SF

STUDIO C

929 SF

STUDIO D

314 SF

OFFICE

310F

140 SF

OFFICE

310E

195 SF

OFFICE

310D

196 SF

OFFICE

310C

202 SF

OFFICE

310G

102 SF

OFFICE

310H

169 SF

OFFICE

310B

STOR

216 SF

OFFICE

121 SF

OFFICE

317B

HALL

317A

147 SF

OFFICE

317C

250 SF

OFFICE

317D

92 SF

OFFICE

317F

3444 SF

STUDIO E

VEST

MENS

RESTROOM

256 SF

OFFICE

310J

116 SF

OFFICE

310K

115 SF

OFFICE

310L

186 SF

OFFICE

310N

HALL

310A

VEST

100 SF

OFFICE

A B C D E F G H

K NL MI J

WOMENS

RESTROOM

140 SF

OFFICE

317E

OPEN TO BELOW

A300 1

A302

A3031

A301

ELEV 2 ELEV 1

FREIGHT

ELEV 3

STAIR

LOBBY

STAIR

766 SF

LOBBY

HALL

DN

UP

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A203MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

THIRD FLOOR

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - THIRD FLOOR

No. DATE BY REFERENCE

PROJECT

NORTH

26711/16/23

PROVIDE NEW

RAMPED

ACCESS AT MAIN

ENTRACNE

REMOVE LIGHTING GRID.

PROVIDE NEW CEILING,

ACOUSTICAL

TREATMENT, AND

LIGHTING

NEW WINDOW

TREATEMENT

WITH BLACK OUT

SHADES AND

SOLAR SHADES

REFURBISH AND

RESEAL ALL

WINDOWS

NEW WALL FINISH WITH

ACOUSTICAL TREATMENT

COVERING 50%

PROTECT

EXISTING WOOD

FLOOR

NEW CEILINGS,

LIGHTING, PAINT

AND FLOOR

FINISHES AT

OFFICES, TYP.

REFURBISH

ELEVATOR

CABS, TYPICAL

REFINISH WOOD

PANELING AND

BOOKCASES

PROVIDE NEW

CEILING AND

LIGHTING

PROVIDE NEW

CEILING WITH

ACOUSTICAL

TREATMENT, NEW

LIGHTING AND

CEILING FANS

NEW ACOUTICAL

TREATMENT ON

WALLS - MIN.

50% OF WALL

SURFACE

FLOOR TREATMENT TO

PROVIDE ENHANCED

ACOUSTICAL

SEPARATION FROM

THEATER BELOW

A B C D E F G H

K NL MI J

A300 1

A302

A3031

A301

529 SF

KITCHEN

M301

CLOSET

M304

HALLWAY

M303

BATH

M305

CONTROL

ROOM

M302

REF

STAIR

M313

STAIR

M332

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A203MMALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

THIRD FLOOR MEZZANINE

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - THIRD FLOOR MEZZANINE

No. DATE BY REFERENCE

PROJECT

NORTH

26811/16/23

KITCHEN TO BE

RELOCATED TO

FOURTH FLOOR

PROVIDE NEW AV

SYSTEMS FOR

STUDIO C BELOW

UP

DN

UNIT

UNIT

UNIT

416A

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

407UNIT

UNIT

LAUNDRY

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

TRASH

TOILET

SHOWER

G H

K NL MI J

/2 A207SEE

FOR LOWER ROOF PLAN

A3031

ELEV 2 ELEV 1

CLOSET

STAIR

STAIR

HALL

CLOSET

STAIR

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A204MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

FOURTH FLOOR

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - FOURTH FLOOR

No. DATE BY REFERENCE

PROJECT

NORTH

26911/16/23

REMOVE WALLS TO

PROVIDE NEW RESIDENT'S

KITCHEN IN THIS AREA.

PROVIDE PLUMBING,

LIGHTING AND ELECTRICAL.

REMOVE WALLS TO

PROVIDE NEW

COMMUNITY ROOM IN

THIS AREA

SCOPE AT

RESIDENTIAL UNITS?

NEED TO REVIEW

NEW CEILINGS,

LIGHTING, AND PAINT

IN HALLWAYS.

PROVIDE NEW

PLUMBING FIXTURES,

LIGHTING, FLOOR

FINISHES AND PAINT.

UPUP

UP

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

TOILET

TOILET

SHOWER

TRASH

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

520 CLOSET

G H

K NL MI J

A3031

A301

ELEV 2 ELEV 1

UTILITY

HALL

STAIR

STAIR

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A205MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

FIFTH FLOOR

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - FIFTH FLOOR

No. DATE BY REFERENCE

PROJECT

NORTH

261011/16/23

SCOPE AT

RESIDENTIAL UNITS?

NEED TO REVIEW

NEW CEILINGS,

LIGHTING, AND PAINT

IN HALLWAYS.

PROVIDE NEW

PLUMBING FIXTURES,

UNIT

UNIT

UNIT

UNIT

UNIT

TRASH

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

620 CLOSET

SHOWER

TOILET

TOILET

UNIT

UNIT

UNIT

G H

K NL MI J

A301

ELEV 2 ELEV 1

STAIR

HALL

STAIR

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A206MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

SIXTH FLOOR

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - SIXTH FLOOR

No. DATE BY REFERENCE

PROJECT

NORTH

261111/16/23

SCOPE AT

RESIDENTIAL UNITS?

NEED TO REVIEW

NEW CEILINGS,

LIGHTING, AND PAINT

IN HALLWAYS.

PROVIDE NEW

PLUMBING FIXTURES,

G H

K NL MI J

A301

A B C D E F G H

KI J

ROOF BELOW

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A207MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

ROOF PLAN

ISSUE

DATE

1/8" = 1'-0"1

HIGH ROOF PLAN

No. DATE BY REFERENCE

1/8" = 1'-0"2

LOW ROOF PLAN

PROJECT

NORTH

PROJECT

NORTH

261211/16/23

PROVIDE NEW COATING ON

EXISTING SINGLE-PLY

ROOFING. SEE ROOFING/

WATERPROOFING REPORT

NEW CEILINGS,

LIGHTING, AND PAINT

IN HALLWAYS.

REPLACE SHINGLES ON

SLOPED ROOF WITH

STANDING SEAM METAL

ROOFING, TYPICAL - SEE

ROOFING AND

WATERPROOFING REPORT

NOTE:

SEE ROOFING AND WATERPROOFING

REPORT FOR ADDITIONAL INFORMATION

AND REPAIR WORK

PROJECT SITE

H A

R R

IS

O

N S

T

A L

IC

E S

T

14TH ST

CITY OF OAKLAND MAPLOCATION MAP

PROJECT & GRANT

MANAGEMENT DIVISION

CIP COORDINATOR

PROJECT & GRANT

MANAGEMENT DIVISION

SUPERVISOR

CONSTRUCTION MANAGEMENT

DIVISION

PRINCIPAL CIVIL ENGINEER

CITY ADMINISTRATOR OFFICE

ADA PROGRAMS DIVISION MANAGER

HUMAN SERVICES DEPARTMENT

MANAGER

FACILITIES SERVICES DIVISION

MANAGER

BUREAU OF MAINTENANCE &

INTERNAL SYSTEMS

ASSISTANT DIRECTOR

CHECKED BY

DESIGNED BY

DRAWN BY

PROJECT NO.

SHEET NO.

OF

SCALE:

DATE:

1006040

MALONGA CASQUELOURD CENTER FOR THE ARTS

1428 ALICE STREET

CITY PROJECT #: 1006040

NJ

Designer

ISSUE

DATE

A000

No. BY DATE REFERENCE

SHEET INDEX

ADMINISTRATIVE

A000 COVER SHEET

ARCHITECTURE

A200 BASEMENT FLOOR PLAN

A201 FIRST FLOOR PLAN

A201M FIRST FLOOR MEZZANINE

A202 SECOND FLOOR

A202M SECOND FLOOR MEZZANINE

A203 THIRD FLOOR

A203M THIRD FLOOR MEZZANINE

A204 FOURTH FLOOR

A205 FIFTH FLOOR

A206 SIXTH FLOOR

A207 ROOF PLAN

A300 EXTERIOR EAST ELEVATION

A301 EXTERIOR NORTH ELEVATION

A302 EXTERIOR SOUTH ELEVATION

A303 EXTERIOR WEST ELEVATION

A600 BASEMENT REFLECTED CEILING PLAN

A601 FIRST FLOOR REFLECTED CEILING PLAN

A602 FIRST FLOOR MEZZ REFLECTED CEILING PLAN

A603 SECOND FLOOR REFLECTED CEILING PLAN

A604 SECOND FLOOR MEZZ REFLECTED CEILING PLAN

A605 THIRD FLOOR REFLECTED CEILING PLAN

A606 THIRD FLOOR MEZZ REFLECTED CEILING PLAN

A607 FOURTH FLOOR REFLECTED CEILING PLAN

A608 FIFTH FLOOR REFLECTED CEILING PLAN

A609 SIXTH FLOOR REFLECTED CEILING PLAN

ASSISTANT DIRECTOR, OPW

BUREAU OF DESIGN AND CONSTRUCTION

SIEW-CHIN YEONG, P.E.

FEASIBILITY STUDY BUILDING DOCUMENTATION

26111/16/23

UP

UP

UP

UP

UP

DN

UP

UP

MECH

783 SF

CLASSROOM

B101

WOMEN

B118

MEN

B119

STOR

B116H

RECORDING

RM 1

B116C

RECORDING

RM 2

B116D

RECORDING

RM 3

B116E

RECORDING

RM 4

B116F

91 SF

STUDIO

B116B

130 SF

STUDIO

B116A

ELEVATOR

MACH RM

B114

ELEV

VESTIBULE

B112

MECH

B117

CHANGING

RESTROOM

B123

CHANGING

RM 2

B124

CHANGING

RM 3

B125

128 SF

OFFICE

B102

STOR 1

B127

CLOSET

B104A286 SF

OFFICE

B103

STOR 4

B100

HALL NORTH

B126

RECORDING

RM 5

B116G

STOR

B116J

1773 SF

CLASSROOM

STUDIO

B116

MECHANICAL

B110

ELEV VEST

B132

MECH

B105

827 SF

CLASSROOM

B104

690 SF

CLASSROOM

B106

ELECTRICAL

B108

769 SF

CLASSROOM

B107

ANNEX

STAIR 2

B113

CHANGING

RM 1

B122

STOR 3

B129

LAUNDRY

B109

A B C D E F G H

K NL MI J

3/4" / 1'-0"

LIFT

B116K

A300 1

A302

A3031

A301

CLOSET

B107A

UNCOCCUPIED SPACE

BELOW STAGE FLOOR

MAIN HALL

B121

HALL SOUTH

B120

ANNEX STAIR

B111

STOR 2

B128

STAIR

B116L

STAIR

B130

STAIR

B131

ELEV 2 ELEV 1

FREIGHT

ELEV 3

ANNEX

STAIR 2

B113

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A200MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

BASEMENT FLOOR PLAN

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - BASEMENT

No. DATE BY REFERENCE

PROJECT

NORTH

26211/16/23

UP

UP

UP

UP

DN

DN

DN

DN

DN

DN

UP

SECURITY

CONCESSIONS

LOUNGE

179 SF

OFFICE

149 SF

OFFICE

LOBBY

RESID &

STUDIO

ENTRY

GENDER

NEUTRAL ACC

GENDER

NEUTRAL ACC

MENS

RESTROOM

GENDER

NEUTRAL

VESTIBULE

GENDER

NEUTRAL

1386 SF

THEATER

LOBBY

THEATER

FOYER

A B C D E F G H

7' - 8" 10' - 8 1/2" 10' - 8 1/2" 10' - 8 1/2" 10' - 8 1/2" 10' - 8 1/2" 10' - 8 1/2"

K N

16' - 4 29/32" 16' - 4 3/4" 16' - 4 5/32"

L MI J

1198 SF

ANNEX

CLASSROOM

A100

ANNEX

UTILITY

A103

ANNEX

VEST

A102

ANNEX

CLOSET

A104

/8

BOX OFFICE

ELEV 2 ELEV 1

641 SF

ANNEX HALL

A101

CONTROL RM

LOWER

A300 1

A302

A3031

A301

ANNEX STAIR

A111

RETAIL

N.I.C.

STAIR

STAIR

FREIGHT

ELEV 3

STAIR

THEATER

VESTIBULE

OFF LEFT

STAIR

CLOSET

A L

IC

E

S T

R E

E T

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A201MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

FIRST FLOOR PLAN

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - FIRST FLOOR

No. DATE BY REFERENCE

PROJECT

26311/16/23

DN

DN

DN

STORAGE

M105

STORAGE

M104

982 SF

OFFICE

M100

315 SF

OFFICE

M101

RESTROOM

M102

A B C D E F G H

K NL MI J

OPEN TO BELOW

A300 1

A302

A3031

A301

VESTIBULE

M103

ELEV 2 ELEV 1

FREIGHT

ELEV 3

STAIR

M136

OPEN TO BELOW

STAIR

M140

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A201MMALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

FIRST FLOOR MEZZANINE

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - FIRST FLOOR MEZZANINE

No. DATE BY REFERENCE

PROJECT

26411/16/23

DN

DN

UP

329 SF

OFFICE

GENDER

NEUTRAL ACC

854 SF

STUDIO B

3872 SF

STUDIO A

235 SF

OFFICE

CLOSET

330 SF

OFFICE

CLOSET

MENS

RESTROOM

WOMENS

RESTROOM

CLOSET

CLOSET

A B C D E F G H

K NL MI J

OPEN TO BELOW

A300 1

A302

A3031

A301

ELEV 2 ELEV 1

FREIGHT

ELEV 3

LOBBY

HALL

STAIR

STAIR

HALL

STAIR

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A202MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

SECOND FLOOR

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - SECOND FLOOR

No. DATE BY REFERENCE

PROJECT

26511/16/23

LIGHTING

BOOTH

212M

MENS

RESTROOM

213M

439 SF

OFFICE

202M

STOR

204M

477 SF

CONFERENCE

RM A

203M

CLOSET

206M

431 SF

OFFICE

207M

STORAGE

208M

STORAGE

209M

STAIR

210M

STOR

211M

A B C D E F G H

K NL MI J

OPEN TO BELOW

OPEN TO BELOW

OPEN TO BELOW

OPEN TO BELOW

A300 1

A302

A3031

A301

ELEV 2 ELEV 1

FREIGHT

ELEV 3

STAIR

219M

LOBBY

201M

HALL

205M

220 SF

OFFICE

394 SF

STUDIO X

253 SF

STOR

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A202MMALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

SECOND FLOOR MEZZANINE

ISSUE

DATE

1/8" = 1'-0"

FLOOR PLAN - SECOND FLOOR MEZZANINE

No. DATE BY REFERENCE

PROJECT

26611/16/23

WOMENS

RESTROOM

2363 SF

STUDIO C

929 SF

STUDIO D

314 SF

OFFICE

310F

140 SF

OFFICE

310E

195 SF

OFFICE

310D

196 SF

OFFICE

310C

202 SF

OFFICE

310G

102 SF

OFFICE

310H

169 SF

OFFICE

310B

STOR

216 SF

OFFICE

121 SF

OFFICE

317B

HALL

317A

147 SF

OFFICE

317C

250 SF

OFFICE

317D

92 SF

OFFICE

317F

3444 SF

STUDIO E

VEST

MENS

RESTROOM

256 SF

OFFICE

310J

116 SF

OFFICE

310K

115 SF

OFFICE

310L

186 SF

OFFICE

310N

HALL

310A

VEST

100 SF

OFFICE

A B C D E F G H

K NL MI J

WOMENS

RESTROOM

140 SF

OFFICE

317E

OPEN TO BELOW

A300 1

A302

A3031

A301

ELEV 2 ELEV 1

FREIGHT

ELEV 3

STAIR

LOBBY

STAIR

766 SF

LOBBY

HALL

DN

UP

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A203MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

THIRD FLOOR

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - THIRD FLOOR

No. DATE BY REFERENCE

PROJECT

26711/16/23

A B C D E F G H

K NL MI J

A300 1

A302

A3031

A301

529 SF

KITCHEN

M301

CLOSET

M304

HALLWAY

M303

BATH

M305

CONTROL

ROOM

M302

REF

STAIR

M313

STAIR

M332

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A203MMALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

THIRD FLOOR MEZZANINE

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - THIRD FLOOR MEZZANINE

No. DATE BY REFERENCE

PROJECT

26811/16/23

UP

DN

UNIT

UNIT

UNIT

416A

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

407UNIT

UNIT

LAUNDRY

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

TRASH

TOILET

SHOWER

G H

K NL MI J

/2 A207SEE

FOR LOWER ROOF PLAN

A3031

ELEV 2 ELEV 1

CLOSET

STAIR

STAIR

HALL

CLOSET

STAIR

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A204MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

FOURTH FLOOR

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - FOURTH FLOOR

No. DATE BY REFERENCE

PROJECT

26911/16/23

UP

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

TOILET

TOILET

SHOWER

TRASH

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

520 CLOSET

G H

K NL MI J

A3031

A301

ELEV 2 ELEV 1

UTILITY

HALL

STAIR

STAIR

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A205MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

FIFTH FLOOR

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - FIFTH FLOOR

No. DATE BY REFERENCE

PROJECT

261011/16/23

UNIT

UNIT

UNIT

UNIT

UNIT

TRASH

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

620 CLOSET

SHOWER

TOILET

TOILET

UNIT

UNIT

UNIT

G H

K NL MI J

A301

ELEV 2 ELEV 1

STAIR

HALL

STAIR

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A206MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

SIXTH FLOOR

ISSUE

DATE

1/8" = 1'-0"1

FLOOR PLAN - SIXTH FLOOR

No. DATE BY REFERENCE

PROJECT

261111/16/23

K NL MI J

A301

A B C D E F G H

KI J

ROOF BELOW

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A207MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

ROOF PLAN

ISSUE

DATE

1/8" = 1'-0"1

HIGH ROOF PLAN

No. DATE BY REFERENCE

1/8" = 1'-0"2

LOW ROOF PLAN

PROJECT

NORTH

PROJECT

261211/16/23

FIRST FLOOR

+0' - 9"

SECOND FLOOR

+20' - 0"

FOURTH FLOOR

+57' - 0"

FIFTH FLOOR

+67' - 0"

SIXTH FLOOR

+77' - 0"

THIRD FLOOR

+39' - 0"

HIGH ROOF

+87' - 9"

SECOND FLOOR MEZZ

+29' - 6"

FIRST FLOOR MEZZ

+11' - 0"

THIRD FLOOR MEZZ

+48' - 0"

12345678910

FLY ROOF

+55' - 0"

LOW ROOF

+60' - 2 3/4"

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A300MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

EXTERIOR EAST ELEVATION

ISSUE

DATE

No. DATE BY REFERENCE

1/8" = 1'-0"

EXTERIOR EAST ELEVATION

261311/16/23

SECOND FLOOR

+20' - 0"

FOURTH FLOOR

+57' - 0"

FIFTH FLOOR

+67' - 0"

SIXTH FLOOR

+77' - 0"

THIRD FLOOR

+39' - 0"

HIGH ROOF

+87' - 9"

SECOND FLOOR MEZZ

+29' - 6"

FIRST FLOOR MEZZ

+11' - 0"

THIRD FLOOR MEZZ

+48' - 0"

A B C D E F G H K NL MI J

FLY ROOF

+55' - 0"

LOW ROOF

+60' - 2 3/4"

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A301MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

EXTERIOR NORTH

ELEVATION

ISSUE

DATE

No. DATE BY REFERENCE

1/8" = 1'-0"

EXTERIOR NORTH ELEVATION

261411/16/23

SECOND FLOOR

+20' - 0"

FOURTH FLOOR

+57' - 0"

FIFTH FLOOR

+67' - 0"

SIXTH FLOOR

+77' - 0"

THIRD FLOOR

+39' - 0"

HIGH ROOF

+87' - 9"

SECOND FLOOR MEZZ

+29' - 6"

FIRST FLOOR MEZZ

+11' - 0"

THIRD FLOOR MEZZ

+48' - 0"

ABCDEFGHKN LM IJ

FLY ROOF

+55' - 0"

LOW ROOF

+60' - 2 3/4"

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A302MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

EXTERIOR SOUTH

ELEVATION

ISSUE

DATE

No. DATE BY REFERENCE

1/8" = 1'-0"

EXTERIOR SOUTH ELEVATION

261511/16/23

SECOND FLOOR

+20' - 0"

FOURTH FLOOR

+57' - 0"

FIFTH FLOOR

+67' - 0"

SIXTH FLOOR

+77' - 0"

THIRD FLOOR

+39' - 0"

HIGH ROOF

+87' - 9"

SECOND FLOOR MEZZ

+29' - 6"

FIRST FLOOR MEZZ

+11' - 0"

THIRD FLOOR MEZZ

+48' - 0"

1 2 3 4 5 6 7 8 9 10

FLY ROOF

+55' - 0"

LOW ROOF

+60' - 2 3/4"

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A303MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

EXTERIOR WEST

ELEVATION

ISSUE

DATE

No. DATE BY REFERENCE

1/8" = 1'-0"

EXTERIOR WEST ELEVATION

261611/16/23

A B C D E F G H

K NL MI J

MECH

CLASSROOM

B101

WOMEN

B118

MEN

B119

STOR

B116H

RECORDING

RM 1

B116C

RECORDING

RM 2

B116D

RECORDING

RM 3

B116E

RECORDING

RM 4

B116F

STUDIO

B116B

STUDIO

B116A

ELEVATOR

MACH RM

B114

ELEV

VESTIBULE

B112

MECH

B117

CHANGING

RESTROOM

B123

CHANGING

RM 2

B124

CHANGING

RM 3

B125

OFFICE

B102

STOR 1

B127

CLOSET

B104A

OFFICE

B103

STOR 4

B100

HALL NORTH

B126

RECORDING

RM 5

B116G

STOR

B116J

CLASSROOM

STUDIO

B116

MECHANICAL

B110

ELEV VEST

B132

MECH

B105

CLASSROOM

B104

CLASSROOM

B106

ELECTRICAL

B108

CLASSROOM

B107

ANNEX

STAIR 2

B113

CHANGING

RM 1

B122

STOR 3

B129

LAUNDRY

B109

CLOSET

B107A

MAIN HALL

B121

HALL SOUTH

B120

ANNEX STAIR

B111

STOR 2

B128

STAIR

B116L

STAIR

B130

STAIR

B131

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTU

RE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTU

RE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

ELEV 2 ELEV 1

FREIGHT

ELEV 3

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A600MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

BASEMENT REFLECTED

CEILING PLAN

ISSUE

DATE

No. DATE BY REFERENCE

1/8" = 1'-0"1

REFLECTED CEILING PLAN BASEMENT

PROJECT

261711/16/23

K NL MI J

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

SECURITY

CONCESSIONS

LOUNGE

OFFICE

OFFICE

LOBBY

RESID &

STUDIO

ENTRY

GENDER

NEUTRAL ACC

GENDER

NEUTRAL ACC

MENS

RESTROOM

GENDER

NEUTRAL

VESTIBULE

GENDER

NEUTRAL

THEATER

LOBBY

THEATER

FOYER

ANNEX

CLASSROOM

A100

ANNEX

UTILITY

A103

ANNEX

VEST

A102

ANNEX

CLOSET

A104

BOX OFFICE

ANNEX HALL

A101

ANNEX STAIR

A111

RETAIL

N.I.C.

STAIR

STAIR

STAIR

THEATER

VESTIBULE

OFF LEFT

STAIR

CLOSET

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

FREIGHT

ELEV 3

ELEV 2 ELEV 1

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A601MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

FIRST FLOOR REFLECTED

CEILING PLAN

ISSUE

DATE

No. DATE BY REFERENCE

1/8" = 1'-0"1

REFLECTED CEILING PLAN FIRST FLOOR

PROJECT

261811/16/23

K NL MI J

STORAGE

M104

STORAGE

M105

THEATER

STAIR

M140

VESTIBULE

M103

RESTROOM

M102

OFFICE

M100

OFFICE

M101

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

BELOW

FREIGHT

ELEV 3

ELEV 2 ELEV 1

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A602MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

FIRST FLOOR MEZZ

REFLECTED CEILING PLAN

ISSUE

DATE

No. DATE BY REFERENCE

1/8" = 1'-0"1

REFLECTED CEILING PLAN FIRST FLOOR MEZZ

PROJECT

261911/16/23

K NL MI J

OFFICE

GENDER

NEUTRAL ACC

STUDIO B

STUDIO A

OFFICE

CLOSET

OFFICE

CLOSET

MENS

RESTROOM

WOMENS

RESTROOM

CLOSET

CLOSET

OFFICE

LOBBY

HALL

STAIR

STAIR

HALL

STAIR

THEATER

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

OPEN TO

STRUCTURE

FREIGHT

ELEV 3

ELEV 2 ELEV 1

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A603MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

SECOND FLOOR

REFLECTED CEILING PLAN

ISSUE

DATE

No. DATE BY REFERENCE

1/8" = 1'-0"1

REFLECTED CEILING PLAN SECOND FLOOR

PROJECT

262011/16/23

K NL MI J

STOR

211M

STAIR

210M

STORAGE

209M

STORAGE

208M

OFFICE

207M

CLOSET

206M

CONFERENCE

RM A

203M

HALL

205M

OFFICE

202M

LOBBY

201M

LIGHTING

BOOTH

212M

STAIR

219M

MENS

RESTROOM

213M

FREIGHT

ELEV 3

ELEV 2 ELEV 1

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A604MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

SECOND FLOOR MEZZ

REFLECTED CEILING PLAN

ISSUE

DATE

No. DATE BY REFERENCE

1/8" = 1'-0"1

REFLECTED CEILING PLAN SECOND FLOOR MEZZ

PROJECT

262111/16/23

K NL MI J

WOMENS

RESTROOM

STUDIO C

STUDIO D

OFFICE

310F

OFFICE

310E

OFFICE

310D

OFFICE

310C

OFFICE

310G

OFFICE

310H

OFFICE

310B

STOR

OFFICE

OFFICE

317B

HALL

317A

OFFICE

317C

OFFICE

317D

OFFICE

317F

STUDIO E

VEST

MENS

RESTROOM

OFFICE

310J

OFFICE

310K

OFFICE

310L

OFFICE

310N

HALL

310A

VEST

OFFICE

WOMENS

RESTROOM

OFFICE

317E

STAIR

LOBBY

STAIR

LOBBY

HALL

12' - 2 1/2"

OPEN TO

STRUCTURE

FREIGHT

ELEV 3

ELEV 2 ELEV 1

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A605MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

THIRD FLOOR REFLECTED

CEILING PLAN

ISSUE

DATE

No. DATE BY REFERENCE

1/8" = 1'-0"1

REFLECTED CEILING PLAN THIRD FLOOR

PROJECT

262211/16/23

K NL MI J

STAIR

M313

BATH

M305

HALLWAY

M303

CLOSET

M304

STAIR

M332

KITCHEN

M301

OPEN TO

STRUCTURE

CONTROL

ROOM

M302

FREIGHT

ELEV 3

ELEV 2 ELEV 1

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A606MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

THIRD FLOOR MEZZ

REFLECTED CEILING PLAN

ISSUE

DATE

No. DATE BY REFERENCE

1/8" = 1'-0"1

REFLECTED CEILING PLAN THIRD FLOOR MEZZ

PROJECT

262311/16/23

K NL MI J

UNIT

UNIT

UNIT

UNIT

416A

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

LAUNDRY

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

STAIR

STAIR

HALL

STAIR

8' - 10"

7' - 6"

ELEV 2 ELEV 1

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A607MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

FOURTH FLOOR REFLECTED

CEILING PLAN

ISSUE

DATE

No. DATE BY REFERENCE

1/8" = 1'-0"1

REFLECTED CEILING PLAN FOURTH FLOOR

PROJECT

262411/16/23

K NL MI J

UNIT

STAIR

HALL

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

STAIR

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

ELEV 2 ELEV 1

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A608MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

FIFTH FLOOR REFLECTED

CEILING PLAN

ISSUE

DATE

No. DATE BY REFERENCE

1/8" = 1'-0"1

REFLECTED CEILING PLAN FIFTH FLOOR

PROJECT

262511/16/23

K NL MI J

UNIT

601UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

STAIR

UNIT

UNIT

HALL

UNIT

UNIT

TRASH

SHOWER

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

ELEV 2 ELEV 1

PROJECT NO.

SCALE:

HOR.

VERT.

DATE:

SHEET NO.

ARCHITECT

RCE NO. EXP.

DRAWN BY

DESIGNED BY

CHECKED BY

CITY PROJECT NO.

CL

NJ OF

1006040A609MALONGA CASQUELOURD CENTER FOR THE ARTS

1006040

SIXTH FLOOR REFLECTED

CEILING PLAN

ISSUE

DATE

No. DATE BY REFERENCE

1/8" = 1'-0"1

REFLECTED CEILING PLAN SIXTH FLOOR

PROJECT

262611/16/23

Appendix Cover
Appendix A List of References
List of Reference Drawings and Documents
Appendix B Space Inventory
Appendix C Drawing Markups for Cost Estimating
Cover Sheet
A200 - BASEMENT FLOOR PLAN
A201 - FIRST FLOOR PLAN
Theater Seating Preferred Option
A201M - FIRST FLOOR MEZZANINE
A202 - SECOND FLOOR
A203 - THIRD FLOOR
A203M - THIRD FLOOR MEZZANINE
A204 - FOURTH FLOOR
A205 - FIFTH FLOOR
A206 - SIXTH FLOOR
A207 - ROOF PLAN
Appendix D Floor Plans from 3-D Point Cloud Scan
Cover Sheet
A200 - BASEMENT FLOOR PLAN
A201 - FIRST FLOOR PLAN
A201M - FIRST FLOOR MEZZANINE
A202 - SECOND FLOOR
A203 - THIRD FLOOR
A203M - THIRD FLOOR MEZZANINE
A204 - FOURTH FLOOR
A205 - FIFTH FLOOR
A206 - SIXTH FLOOR
A207 - ROOF PLAN
A300 - EXTERIOR EAST ELEVATION
A301 - EXTERIOR NORTH ELEVATION
A302 - EXTERIOR SOUTH ELEVATION
A303 - EXTERIOR WEST ELEVATION
A600 - BASEMENT REFLECTED CEILING PLAN
A601 - FIRST FLOOR REFLECTED CEILING PLAN
A602 - FIRST FLOOR MEZZ REFLECTED CEILING PLAN
A603 - SECOND FLOOR REFLECTED CEILING PLAN
A604 - SECOND FLOOR MEZZ REFLECTED CEILING PLAN
A605 - THIRD FLOOR REFLECTED CEILING PLAN
A606 - THIRD FLOOR MEZZ REFLECTED CEILING PLAN
A607 - FOURTH FLOOR REFLECTED CEILING PLAN
A608 - FIFTH FLOOR REFLECTED CEILING PLAN
A609 - SIXTH FLOOR REFLECTED CEILING PLAN

File details come from the government source that posted it. Updated .