This document is a Standard Operating Procedures (SOP) manual issued by the Department of Health and Environmental Control (DHEC), Bureau of Water, Dams Safety Program, for the state of South Carolina. The manual provides guidance to dam owners and engineers on defining maintenance versus repair activities and establishing phased approaches for tree removal from earthen dams. The document covers three primary components: maintenance activities including removal of small vegetation and saplings four inches or smaller; tree removal procedures requiring dam repair permits and professional engineer oversight; and long-term tree management plans designed as five-to-ten-year phased removal programs for established tree growth. Tree removal procedures are organized by five dam repair zones, with specific requirements for each zone regarding backfill materials, compaction specifications, and vegetative cover restoration. The SOP emphasizes that tree growth is detrimental to dam safety and stability, citing federal regulatory agencies including FEMA, the U.S. Army Corps of Engineers, and the Federal Energy Regulatory Commission as sources for this determination. All procedures must comply with South Carolina's Dam and Reservoirs Safety Act Regulations (Regulation 72-1 and 72-9) and involve coordination with DHEC for permit approval prior to implementation.

The document does not establish pricing terms, set-asides, or funding requirements, as it functions as regulatory guidance rather than a procurement solicitation. However, it identifies specific technical requirements contractors must follow when performing tree removal work on regulated dams, including soil compatibility specifications, compaction standards (95 percent of maximum dry density), minimum topsoil placement of four inches, establishment of vegetative cover using reference standards from the South Carolina Department of Transportation, and annual inspection and monitoring by certified arborists for trees twelve inches in diameter or greater. The manual also prescribes emergency action plan modifications for dam owners with trees present on their dams and identifies conditions requiring immediate tree removal regardless of size or phase schedule, such as trees presenting imminent failure threats or exhibiting disease or insect infestations discovered during annual arborist assessments.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTENANCE, REPAIR, and TREE MANAGEMENT

STANDARD OPERATING PROCEDURES

DAMS SAFETY

PROGRAM

DHEC Maintenance, Repair, and Tree Management SOP Bureau Of Water Revision 1 i

INTRODUCTION

The Department of Health and Environmental Control (DHEC or the Department) is providing these Standard Operating Procedures (SOP) document to assist dam owners and their engineers in defining what are considered maintenance activities, what are considered repair activities, and outlining the steps for developing a phased approach to remove existing tree growth from earthen dams within a reasonable time.

This approach to tree removal is based on the Federal Emergency Management Agency

(FEMA) Document No. 534 (Technical Manual for Dam Owners: Impacts of Plants on Earthen

Dams, September 2005), which states, “Many individual dam owners and small dam owner organizations are not financially capable of undertaking comprehensive dam remediation projects in one major construction contract. Therefore, they must undertake dam remediation programs in a sequential manner.” Ultimately, the Department aims to achieve the removal of established tree growth from regulated dams in the state.

Although there are varying schools of thought and research as to the viability of tree growth on dams, trees and brush, research by federal regulatory agencies such FEMA, the US Army

Corps of Engineers, the Federal Energy Regulatory Commission, and US Department of Interior

Bureau of Reclamation have determined that especially in an uncontrolled growth state, trees are detrimental to dams. DHEC has adopted this position as well.

ii

TABLE OF CONTENTS

Section 1 Purpose 1

Section 2 Helpful Information

Section 2.1 Definitions 2

Section 2.2 Dam Repair Zones 4

Section 3 Maintenance and Repair of Regulated Dams

Section 3.1 Maintenance 5

Section 3.2 Repair 5

Section 4 Tree Management

Section 4.1 General 6

Section 4.2 Impact of Tree Growth on Earth Dams 7

Section 4.3 Tree Removal Requirements 8

Section 4.4 Prioritization of Tree Removal 9

Section 4.5 Tree Removal Plan Development 9

Section 4.5.A Repair Zones 1 and 2 10

Section 4.5.B Repair Zones 3, 4, and 5 10

Section 4.5.C Long-Term Management 11

Section 5 Vegetative Cover Development 12

Section 6 Emergency Action Plans (EAP’s) 12

SECTION 1

PURPOSE

This document has three intended goals. First, it defines what the Department considers maintenance activities. Next it defines what the Department considers repair activities. Lastly, it aims to present the requirements for establishing a phased, yet safe and systematic approach to removing existing tree growth from earthen dams within a reasonable time.

Figure 1: Poorly Maintained Dam with Extensive Tree Growth

SECTION 2: INFORMATION

2.1 Definitions

Appurtenant Structures (also Appurtenances): Structures such as spillways, inlet/outlet structures, auxiliary spillways, ramps, docks, etc., that are necessary for the safe operation of a dam.

Certified Arborist: A person certified by the International Society of Arboriculture (ISA) as qualified in the study and management of trees and woody vegetation.

Clay: Fine-grained, plastic soils that, when properly compacted, form dense, relatively impermeable soil layers.

Clearing: The process of cutting or felling trees close to ground level.

Conifer: Trees that do not shed their leaves and produce seeds as cones, typically pines, spruces, yews, etc.

DBH: Diameter at Breast Height refers to the diameter of the tree trunk at the approximate height of an average person’s chest.

Deciduous: Trees which naturally shed their leaves, typically during colder months of the year.

Deadfall: Trunks, limbs, boughs, and/or branches that drop or fall to the ground when dead trees fall over or parts break and fall off of the tree.

Grubbing: The process of removing the stump and root ball below ground surface elevation.

Internal Erosion: The erosion of the interior soils of an earthen dam or its foundation that results as soils are dissolved or are carried away by seepage. Internal erosion can progressively worsen and lead to the failure of the dam. See Piping.

Old Growth: For the purposes of this document only, typically refers to older trees that are 12 inches DBH or larger.

Professional Engineer: A professional engineer actively licensed to practice engineering in the state of South Carolina, as stipulated in the Dam and Reservoirs Safety Act and Dam and

Reservoirs Safety Act Regulations, Regulation 72-1 and 72-9. It is strongly encouraged that this engineer has relevant experience in evaluating, assessing, designing, and/or constructing dams.

Rip Rap: Common name for large diameter stone, with sizes and weights defined in Section

804.2.1 of the most recent edition of the South Carolina Department of Transportation Standard

Specifications for Highway Construction. Rip rap is commonly used on the upstream slopes of dams for slope and wave protection.

Root Ball: The ball or bundle of dense root growth immediately beneath the trunk of the tree that, with the extended root system, anchors, feeds, and supports a tree or other woody vegetation.

Piping: A form of internal erosion which initiates by backward erosion, or erosion in a crack or high permeability zone, and results in the formation of a continuous tunnel called a “pipe’ between the upstream and downstream side of the embankment or its foundation. For the purposes of this document only, piping is of particular concern along decaying root paths penetrating the embankment resulting in the creation of a preferential pathway for internal seepage flow.

Sapling: For the purposes of this document only, typically refers to a young tree 4 inches DBH or smaller.

Shrub: A woody plant without a defined central stem or trunk. Shrubs may naturally grow on their own, or may develop as new growth on the stumps of hardwood trees that have had the trunks cut.

Stump: The remainder of tree trunk left behind at or near the ground surface after the tree has been cut down.

Surface Erosion: The natural washing away or dissolution of soils at the surface of the ground caused by rainfall running over the ground surface. Manmade activities and traffic can exacerbate this.

Tap Root: The main and consequently the largest root typically extending vertically down below the tree trunk that anchors, supports, feeds, and assists with nutrient uptake for a tree or other woody vegetation.

Topsoil: Rich, organic soil that contains the nutrients to support healthy vegetation growth.

Trunk: The main stem of a tree or other woody plant.

Void: The hole or opening in the embankment or foundation soil created when the root ball of a tree is removed or blows over.

57 Stone: Commercially available aggregate or stone with a nominal 3/8-inch diameter.

2.2 Dam Repair Zones

The diagram below is reprinted from Chapter 6 of FEMA 534 and represents remedial repair zones on a typical dam. It is presented to familiarize the reader with some of the dam specific terminology presented in this SOP.

NOTE: Part of Zone 5 lies beyond the downstream toe of the dam, and according to the diagram, equates to a distance of half of the height of the dam. This SOP document defines

Zone 5 as extending beyond the downstream toe of the dam, a distance, equating to half of the height of the dam or 15 feet, whichever distance is smaller. This is especially important for

Tree Management Plans.

SECTION 3: MAINTENANCE AND REPAIR

DHEC Dam and Reservoirs Safety Act Regulations, Regulation 72-1 and 72-9 (the Regulations), require regular maintenance of dams to ensure they continue to operate in a safe manner, protecting downstream life and property. Maintenance activities are continuously performed to help ensure the long-term stability and performance of earthen dams and may be undertaken without receiving a permit from the Department. Dam repairs, under the Regulations, require a permit, must be performed under the direction of a Professional Engineer

– as defined above, and must have Department approval through the permitting process, prior to starting.

3.1 Maintenance Activities

Maintenance activities:

Generally take little time to complete but may be performed frequently over the life of the dam, typically by 1 to 2 people in 3 days or less;

Considered good housekeeping and/or routine activities to keep the dam in good working order;

Do not require specialized training or skill to complete;

Are generally carried out using only hand tools (shovels, rakes, etc.)

May use gasoline powered equipment (lawn mowers, weed eaters, chainsaws, portable generators, etc.), but typically do not utilize diesel powered machinery to perform

Needed materials, supplies, and tools normally do not require commercial delivery; and, It is not necessary to lower the reservoir to complete

Maintenance activities typically include:

Repairing animal burrows;

Removing vegetation and debris from inlets, spillway structures, outlets, and auxiliary spillways;

Mowing, removal of trees and brush 4 inch diameter and smaller;

Repairing surface erosion damage less than 12 inches deep that has not exposed the core of the dam or has not changed the dam’s cross sectional area (width); and, Seeding, fertilizing, amending soil to promote healthy grass growth.

3.2 Repair Activities

Repair activities in general are more extensive than maintenance activities and are:

Generally long-term to complete – possibly up to a year or more;

Typically undertaken to preserve the long term stability and performance of the dam;

Necessary to return the dam and/or keep it in good working order;

Performed under the direction of a Professional Engineer;

Require a permit from the Department prior to starting work;

Excavated deeper than 12 inches into the dam, spillway, and/or auxiliary spillway;

Change grades or elevations of dam crest, spillway, and/or auxiliary spillway;

Require bulk delivery of materials and/or the use of heavy machinery to complete; and, May require lowering the reservoir for completion

Work activities and efforts that are more extensive than are listed in Section 3.1 shall be considered a repair, and shall require submitting a plan and permit application by a Professional Engineer, according to the Regulations.

SECTION 4: TREE MANAGEMENT

4.1 General

The management of woody vegetation on dams generally has three components.

1. Maintenance Activities – Such activities include, but are not limited to, the removal and prevention of the growth of small vegetation and saplings (4-inches or less) found growing anywhere on the dam. Small vegetation includes undergrowth, shrubs, vines, Kudzu, privets, bushes, briers, “Pokeweed,” etc. Saplings (4-inches or less) can be cut close to ground level leaving the stump and roots in place; however, the stump must be treated to kill the plant, prevent future shrub-like growth and stop further growth of the roots.

Areas of bare ground on the dam created by the removal of brush and saplings must be re-vegetated as described in Section 5 of this document.

All dam owners whose dams presently have old growth trees established on them must maintain trees according to the Tree Management Plan also described in subsequent of this document.

2. Tree Removal – Tree growth on a dam should immediately be removed according to the steps outlined in Section 4.3 of this document, and should only be performed after a dam repair permit has been issued. However, in an emergency situation, a tree can be removed without submittal of a Tree Management Plan or prior approval by the

Department.

After emergency tree removal, a repair report, developed by the Engineer containing the same information as a repair plan, must be submitted by the Owner within seven days of the emergency removal.

3. Tree Management – If an existing earthen dam has larger (old growth) trees growing on it; and, dam failure or danger to life, property, or infrastructure is not imminent, the dam owner may elect to develop and submit to DHEC a plan, known as a Tree Management

Plan. A Tree Management Plan is expected to be a long-term (5-10 year) sequenced plan detailing procedures for the systematic, phased removal of old growth trees from the dam and all appurtenant structures, while carefully managing those remaining, as outlined in the following sections, until the dam is eventually free of trees. The plan itself must be developed by a Professional Engineer and approved by the Department. The

Department recognizes that full removal of trees from dams may take multiple years to complete, but expects that complete tree removal from an earthen dam is possible within a 5-year to 10-year period of time.

NOTE: Tree management plans shall only be developed for existing earthen dams with trees presently growing on them. This document shall explicitly NOT allow tree growth to occur on new dams, dams currently under construction, or dams permitted for construction at the time of document issue.

When any tree growing on a dam represents a threat to the overall stability and/or safety of the dam, especially a tree that appears to present a potential imminent dam failure, it shall be removed as soon as possible after discovery.

Implementing a phased approach to tree removal under a Tree Management Plan does

NOT relieve the owner of the requirements of the Regulations.

4.2 Impact of Tree Growth on Earthen Dams

The image above is reprinted from FEMA 534. Some of the impacts of tree growth on earthen dams, also adapted from FEMA 534, are:

Uprooted trees produce large voids, which reduces freeboard and reduces dam cross section available to maintain stability.

Decaying roots create seepage paths and internal erosion problems.

Trees interfere with effective dam safety monitoring and inspection for seepage, cracking, sinkholes, slumping, settlement, deflection, and other signs of stress; as well as maintenance or repair of these issues.

Trees hinder desirable vegetative cover and may contribute to embankment erosion.

Trees obstruct emergency spillway capacity.

Falling trees cause possible damage to spillways and outlet structures.

Tree roots may clog embankment underdrain systems [if present].

Growing roots can cause cracking, uplifting and/or displacing concrete structures and other appurtenant structures.

Localized turbulence and scouring around trees growing in auxiliary spillways during overtopping of the dam embankment or when discharge through the auxiliary spillway occurs.

Trees may provide cover for burrowing animals.

Growing trees loosen compacted soil.

Roots tend to wedge into open joints and cracks in foundation rock along abutment groins and toes of embankment, thus increasing piping and leakage potential.

Roots can penetrate conduit joints and joints in concrete structures.

The Regulations require “regular maintenance of dams to prevent the growth of trees on the dam and in the spillway.” This SOP supports this requirement by adhering to the concept that tree growth is detrimental to the long-term safety, stability, and performance of earthen dams.

However, it provides a framework for dam owners and/or their consultants to develop a plan for tree removal in a systematic and safe manner that exercises good land management and dam safety practices.

For more information on the negative effects of tree growth on earthen dams and the industry standards for management of woody vegetation growth on them, readers are directed to the list of publications below, which may be available by visiting the appropriate organization’s website.

1. FEMA 534: Technical Manual for Dam Owners: Impacts of Plants on Earthen Dams, September 2005.

(https://www.fema.gov/media-library-data/20130726-1446-20490-2338/fema-534.pdf)

2. FEMA L-263: Dam Owner’s Guide to Plant Impact on Earthen Dams, September 2005

(http://www.fema.gov/media-library-data/20130726-1502-20490-1952/fema_l263.pdf)

3. US Army Corps of Engineers Engineering Technical Letter ETL-1110-2-583, April 2014.

(http://www.publications.usace.army.mil/Portals/76/Publications/EngineerTechnicalLetter s/ETL_1110-2-583.pdf)

4. UN Manual on Small Earth Dams: A Guide to Siting, Design, and Construction, 2010.

(http://www.fao.org/docrep/012/i1531e/i1531e00.htm)

4.3 Tree Removal Requirements

Removal of brush and woody vegetation 4-inches and smaller should occur immediately, as these are deemed maintenance activities that do not require a permit. The tree removal component of the Tree Management Plan will require a dam repair permit from the Department and must be developed by a Professional Engineer. The submittal should include a schedule for implementation, and should prescribe the procedures for:

Tree clearing;

Stump removal by excavation or grinding;

Grubbing as needed;

Completely backfilling the void in a strictly controlled manner;

Proper regrading and compaction with compatible soil; and, Establishing a vegetative cover.

4.4 Prioritization of Tree Removal

As part of a phased approach, dam owners should prioritize the removal of trees. Trees presenting the highest threats to dam integrity should be assigned the highest priority and targeted for removal first. General characteristics of trees representing higher hazards are as follows:

Larger trees represent a higher threat than smaller trees.

Evergreen trees represent a threat of potential blowing over, more so than deciduous trees, due to the year round presence of leaves which are more likely to catch large winds or accumulate ice; and higher wind forces and ice accumulation are more likely to induce the tree to topple.

Fruit- and nut-bearing trees due to their potential to attract burrowing animals.

Trees on the crest (Zone 2) and upper three feet of the slopes (upper portions of Zones

1 and 3), and trees in Zone 5 due to the higher potential for trees to blow over in these areas.

Trees located close to critical appurtenances (e.g., inlet/outlet works).

Tree species with large ranging roots, such as Cottonwood trees, represent a higher threat than species which do not, such as Oak trees.

It should be noted that this list of hazards is not intended to be nor should it be considered a complete or final list. The specific characteristics of the trees present on the dam should be considered by the dam owner and the owner’s Professional Engineer in developing the removal priorities and sequence of removal outlined in Tree Management Plans. Evaluation of the potential hazard each tree represents should be considered on a case-by-case basis when developing dam repair plans and/or Tree Management Plans.

4.5 Tree Removal Process

Trees are to be removed from a dam in a systematic way that protects its integrity and safeguards all appurtenant structures to promote the long-term performance of the dam.

General requirements for tree removal procedures include, but are not limited to, the following:

Under the direction of a Professional Engineer, prepare and submit a dam repair permit application outlining the means and methods intended to be taken to safely remove the trees, backfill the void created, and establish a healthy grass cover.

The Owner and the Owner’s Engineer are strongly encouraged to lower the reservoir water level elevation during the tree removal process to reduce any threat to life or property, in the event of an unintended or accidental failure of the dam.

Each dam repair zone has specific removal criteria. The reader is referred to the maintenance zone’s specific instructions in the following sections.

Trees with diameters between four (4) inches and twelve (12) inches should be cut level with the ground.

Stumps of cut trees, including the stump itself, the rootball to a radius of at least 10 feet extending in all directions from the vertical centerline of the trunk or stump, and all roots

2 inches in diameter and larger within the 10-foot radius, should be removed by excavation, pulling (extraction), or grinding.

If stumps are ground, grind all stumps and roots to approximately 12 inches below the ground surface.

Rootball cavity should be cleaned of organic material.

All cavities should be backfilled with well-compacted soil, free of organics and meeting the zone specific requirements below.

The backfill soil shall be selected for compatibility with existing embankment materials.

Backfill should be compacted as specified by the Professional Engineer (typically 95% of maximum dry density and + 2% optimum moisture content, as determined by laboratory

Standard Proctor testing)

At least 4 inches of topsoil will be placed over the backfill.

A vegetative cover shall be planted at all locations that have been backfilled to prevent surface erosion in accordance with Section 5 of this document.

Stumps of trees in areas armored with rip rap, such as the upstream embankments and spillways, cannot usually be excavated, extracted, or ground down, but can be chemically treated so they will not continually form new sprouts. Certain herbicides are effective for this purpose and can even be used at water supply reservoirs if applied by licensed personnel in accordance with state regulations administered by Clemson University. In some circumstances, with prior approval from DHEC, a stump may be treated with a waterproof sealant to prolong stump and rootball decay. For more information on herbicides, the reader is directed to: www.clemson.edu/public/regulatory/pesticide_regulation/.

4.5.A Repair Zones 1 and 2 ONLY All trees growing in Zone 1 and Zone 2 (reference the Dam Repair Zone diagram presented in

Section 4.2 of this document) regardless of size, shall be removed in accordance with the Tree

Removal Process in the preceding section.

The backfill soil shall be selected for compatibility with existing embankment materials, should preferably be clayey in nature, and free of all organics.

If the upstream slope of the dam is exposed to wave action (by wind or by motorized watercraft), rip rap armoring should be installed on the slope to protect embankment soil from erosion due to wave action. If it is determined that the embankment is not subjected to significant wave action, a vegetative cover shall be planted to prevent surface erosion, in accordance with Section 5 of this document.

4.5.B Repair Zones 3, 4, and 5 Tree removal in Zones 3, 4, and 5 (reference the Dam Repair Zone diagram presented in

Section 4.2 of this document) up to a distance the smaller of 15 feet or half the height of the dam beyond the downstream toe of the dam to, shall be removed in accordance with the Tree

Removal Process presented in the preceding section.

Backfill soil should be well-compacted soil of the same nature as, and no more impervious than, the soil originally used to construct the downstream embankment of the dam. In Zones 3, 4, and 5, if a void is extensive enough; consideration should be given to using a sandy fill as a filter to relieve seepage originating from decaying roots.

4.5.C Long-Term Management Measures outlined in the long-term management sections of the Tree Management Plan which must be addressed include, but are not limited to, the following:

All trees, in all zones, must be trimmed and thinned up to a minimum height of 5 feet to allow for visibility and access.

All trees and woody vegetation at or near the dam crest must be scheduled for removal, but while in place, should be trimmed to allow unobstructed inspection of the crest.

All presently dead, dying, and otherwise unsalvageable trees shall be removed, regardless of size.

All trees observed to be severely leaning or showing indications of potential to blow over, must be removed.

All saplings must be removed and no new woody vegetation growth be allowed to develop.

Schedule for removing large trees greater than 12 inches accompanied by a dam repair permit application, and a schedule for removing all trees from the dam within 5-10 years of the date of dam repair permit issuance.

Additionally, the Tree Management Plan should require any tree with a trunk diameter of twelve

(12) inches or greater, presently growing on a dam be monitored and inspected once annually by a Certified Arborist to assess its health. These trees shall be pruned and maintained in good health (free from disease or insect infestations), as directed by an Arborist until they are removed. However, if an infestation or disease is reported by an Arborist, the dam owner should immediately notify the Department and remove the tree within one year of discovery of the condition. A list of certified arborists as of 2006 is available by visiting http://www.state.sc.us/forest/ptreeservice.pdf. For a complete list of certified arborists across the United States and to check ISA certification, visit http://www.isa-arbor.com/.

The Tree Management Plan and the dam repair permit, once approved by the Department, will remain in effect until the old growth trees have been removed from the dam. The Professional

Engineer will provide the Department with an annual report detailing the number of trees removed, method of removal, status (health) of the trees remaining, and the Arborist’s assessment of the trees. Tree removal and backfill placement photographs should be included in the engineer’s annual update. In some cases the Department may require submission of a report more or less frequently than annually.

SECTION 5: VEGETATIVE COVER

The establishment and control of a well-maintained grass cover on the banks, toe, and crest of earthen dams vegetation is a critical aspect of dam maintenance.

Properly maintained grass prevents erosion of embankments and earthen spillways and increases the overall stability of the dam. Installation and maintenance of the grass cover typically does not require a permit from the Department unless compacted soil is being placed to backfill large voids on the dam.

Bare ground areas on the dam created by the removal of underbrush, shrubs, and trees should have a vegetative cover (grass) planted immediately after vegetation removal to prevent surface erosion. A good reference for the installation of a vegetative cover is Section 810 of the most recent edition of the South Carolina Department of Transportation (SCDOT) Standard

Specifications for Highway Construction. A copy may be downloaded by visiting the SCDOT’s website at:

http://www.scdot.org/doing/doingPDFs/2007_full_specbook.pdf (a link in the table of contents will take the viewer directly to page 867 where Section 810 begins).

SECTION 6: EMERGENCY ACTION PLANS

While trees are present on a dam, dam owner’s Emergency Action Plan (EAP) should be modified as follows:

Dam Owner or Dam Owner’s Agent is required, within six hours of observing any fallen tree, to assess any damage to the dam surface or appurtenant structure;

Contact information for the appropriate individuals to notify if damage could result in loss of structural integrity or hydraulic capacity;

Upon activation of the EAP, the dam owner shall notify DHEC of the situation. DHEC may be reached 24 hours per day at (888) 481-0125.

Implement other emergency actions to prevent further damage first, then repair the resulting void or restore the capability of the outlet structure to regulate water level in the reservoir.

Additional steps may include, but not be limited to:

o Lowering of or completely draining the reservoir (which may necessitate submitting a permit application to install a siphon system);

o Maintaining on-site an adequate stockpile of repair materials including #57 stone, rip rap, sandy clay soil, sand, geotextiles, and sandbags; and, o Outline procedures to mobilize a construction crew to the site within 6 hours after initial notification of damage to a dam due to an uprooted tree.