Main Engine HP Turbine Repair - SOW Rev B (002).pdf

PDF 247 KB Posted

Attached to
High Pressure Turbine Engine #1 Federal contract opportunity
Solicitation number
N4523A24R0302
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document outlines a statement of work for the overhaul of a main engine high pressure turbine aboard a naval vessel. The statement of work requires the original equipment manufacturer to provide technical oversight for the overhaul, which is to take place at Puget Sound Naval Shipyard from January to May 2024. The contractor must follow all applicable Navy technical requirements and safety standards. The contractor will submit condition found reports within 96 hours of any issues and a final clearance and overhaul report within seven business days of completion. The contractor's employees will require access to the vessel's main engine room and must comply with security requirements including enrollment in the Defense Biometric Identification System for installation access.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

FOR

Overhaul of CVN 68’s No. 1 Main Engine High Pressure Turbine

1. GENERAL INFORMATION:

Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS&IMF) requires Original Equipment Manufacturer (OEM) to provide technical oversight for the overhaul of CVN 68’s No. 1 Main Engine High Pressure Turbine.

1.1. SCOPE:

1.1.1 Provide guidance and technical oversight for the overhaul of CVN 68’s No. 1 Main Engine High Pressure Turbine per NAVSEA technical requirements.

2. REFERENCES:

2.1. NAVSEA Standard Items, FY 2024.

2.2. Northwest Regional Maintenance Center (NWRMC) Local Standard Items.

2.3. TM S9231-AQ-OMI-020 Rev 3 MAIN PROPULSION TURBINES (DESCRIPTION, OPERATION & MAINTENANCE).

2.4. TM S9231-AQ-OMI-030 REV 1 MAIN PROPULSION TURBINES (MAINTENANCE

DRAWINGS).

2.5. TM S9231-AQ-OMI-040 REV 0 MAIN PROPULSION TURBINES (MISCELLANEOUS

DRAWINGS).

2.6. TM S9231-AQ-OMI-050 REV 0 MAIN PROPULSION TURBINES (OVERHAUL &

CLEARANCE REPORTS.

3. REQUIREMENTS:

3.1. LOCATION OF WORK: Puget Sound Naval Shipyard (PSNS&IMF), Bremerton, Washington. Onboard the vessel.

3.1.1. Contractor employees require access to the Main Engine Room No. 1 (7-113-0-E).

3.2. PERIOD OF PERFORMANCE: Jan 08, 2024 – May 18, 2024

3.3. Planning, supervising, or performing nuclear work is NOT authorized without the express approval of Code 300N, Code 1200N, Code 2300, AND Code 105.

3.4. SECURITY REQUIREMENTS:

3.4.1. Defense Biometric Identification System (DBIDS) Program: Commander, Navy Installations Command (CNIC) has established the Defense Biometric Identification System (DBIDS) for access control to CNIC Installations via Entry Control Points (ECP).

DBIDS is an enterprise identity management and perimeter installation access control solution in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to three years, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and

Identification Office for each visit. There are no fees associated with obtaining a DBIDS credential.

3.4.2. The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

3.4.3. Access to Installation. All Contractor personnel shall obtain access to the installation through enrollment and registration into the Defense Biometric Identification System (DBIDS). The Contractor shall provide the Contracting Officer with the name of their designated Service Contractor Administrator (SCA) for enrollment in DBIDS. Contact the Contracting Officer’s Representative (COR) or Contracting Officer’s Security Officer for assistance as needed. Once enrolled, the Contractor must provide the DBIDS Registrar with an approved employee list and then direct their employees to register into DBIDS.

3.4.4. DBIDS Credentials. Contractor employees shall furnish a completed copy of the SECNAV

5512/1 form to obtain the required background check and visit the local Navy Installation Visitor Control Center to obtain a DBIDS credential once approved. The SECNAV 5512/1 form and additional information about DBIDS can be found at:

https://www.cnic.navy.mil/om/dbids.html. (NOTE: All requests must be received 15 to 30 business days prior to desired access date).

3.4.5. Unescorted access requires authenticating an individual’s identity and determining their fitness using the following guidelines:

3.4.5.1. Identity Proofing. The process of providing sufficient information (e.g., identity history, credentials, and documents) when attempting to establish an identity. The following credentials are identity proofed at the card issue site from federally authorized identity documents, and will be considered identity proofed. CAC, Uniformed Services Identification (ID) Card issued to military retirees and military family members, Non-DoD Federal Personal Identification Verification, United States (U.S.) Passport or Passport Card, Foreign passport that contains a temporary I- 551 stamp or temporary I-551 printed notation on a machine-readable immigrant visa, or others listed in reference (a) and chapter 16. (Note: While certain identification is approved for identity proofing, in order to register a visitor into DBIDS, the visitor must have an ID with an ID number associated. U.S. Citizens are required to provide their Social Security Number (SSN), Certificate of Naturalization or Taxpayer ID Number to receive a DBIDS pass to access the installation).

3.4.5.2. Vetting. An evaluation of an applicant or card holder’s character and conduct for approval, or denial of the issuance of an access control credential for physical access.

https://www.cnic.navy.mil/om/dbids.html

The SECNAV 5512/1 is the sole means to initiate background checks on all visitors and/or contractors/vendors. Every background check for the purpose of access control requires completion of SECNAV 5512/1 for accountability purposes.

3.4.6. Personnel requiring access for 31 days or more will be issued a DBIDS card once all required documentation is provided to the VCC and registration is completed. Visits for 30 days or less will receive a paper DBIDS pass.

3.4.7. DBIDS passes require a picture and fingerprints for all visitor registrations. Failure to provide either can result in denial of base access for escorted or unescorted access.

3.4.8. Pre-enrollment. DBIDS pre-enrollment is available at https://dbids-usfj.dmdc.mil/portal/.

3.4.9. Coordinate all contractor employee badging and security issues via the Government representative: Reginald Deriso, (360) 627-3374.

3.5. GOVERNMENT REPRESENTATIVE

3.5.1. Contracting Officer Representative (COR): Located within the contract.

3.6. TECHNICAL WORK REQUIREMENTS:

3.6.1. Accomplish the requirements of NAVSEA Standard Item 009-90.

3.6.2. Accomplish the requirements of 099-12NW, paragraphs 3.1, 3.4 through 3.7, 3.10, 3.14, and 3.20 of 2.2

3.6.3. Provide guidance and technical oversight for the repair of No. 1 Main Engine High Pressure Turbine using OEM specifications and ref. 2.3 through 2.6 as guidance.

3.6.4. Provide periodic condition found reports (CFR's) and recommendations of note worth non-conformances during disassembly and reassembly of the subject main engine overhaul.

3.6.4.1. Submit one legible copy, in approved transferrable media, a condition found report (CFR) of the inspection results, including any missing or damaged parts, to the Contracting Officer’s Representative (COR) for each piece of equipment inspected.

(CDRL A001, DI-MGMT-81648)

3.6.5. Submit one legible copy, in approved transferable media, of the Final Clearance and Overhaul Report. CFR's and the final clearance and overhaul reports are required to be submitted seven (7) business days after completion of No. 1 Main Engine High Pressure Turbine.

4. QUALITY:

4.1. Quality Assurance Surveillance Plan (QASP): The Quality Assurance Surveillance Plan (QASP) is a tool the Government utilizes to verify the contractor is performing all services and delivery/installation of replacement parts required by the above requirements in a timely, accurate and complete fashion.

https://dbids-usfj.dmdc.mil/portal/

5. DELIVERABLE ITEMS:

Number Name Frequency Quantity

A001 Condition Found Report (CFR) 96 hours from reported condition UNLIMITED

Final Clearance and Overhaul

Report.

Within 7 business days of completion of overhaul. 1(ea.)

File details come from the government source that posted it. Updated .