This is a telecommunications site plan drawing for the EHRM Infrastructure Upgrades project at the Madison Veterans Affairs Medical Center in Madison, Wisconsin. The document provides specifications and routing details for outside plant (OSP) fiber installation across the 2500 Overlook Terrace campus, with construction issued for July 22, 2022.
The plan requires the contractor to install four new 4-inch PVC conduits with trenching and landscape restoration along specified routes to connect multiple buildings (including Buildings 1, 4, 5, 6, 7, 12, 15, and 22) with new 24-fiber redundant OS2 fiber optic cable. Key specifications include directional boring at sidewalks, curbs, and asphalt areas; maintaining a minimum 20-foot separation between all new and existing conduits; constructing new handholes and fiber cable trays within overhead walkways; and installing new underground copper conduit with CAT6A fiber between Buildings 5 and 4. The contractor must also coordinate replacement of the main incoming WAN fiber from the service provider, protect existing direct bury television fiber and electrical/telecommunication infrastructure, relocate existing cable TV head-end equipment from Building 5 to Building 1's upper penthouse roof, and install new cable TV satellite equipment on Building 1's penthouse. Additional requirements include independent utility location verification using both ground-penetrating radar and potholing within 5 feet of known utilities, hand digging in sensitive areas, coordination with the Contracting Officer Representative and University of Wisconsin regarding the helicopter pad, and submission of coordination drawings showing redundant, physically separated fiber routes. The A/E of Record is TRIPLE C - The A/E Group (St. Louis, Missouri), with project number 607-21-700.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25226Q0682.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OEHRM OUTSIDE PLANT (OSP) FIBER SPECIFICATIONS
LEGEND
NEW CONDUIT & NEW REDUNDANT CONDUIT PATH "A"
NEW CONDUIT & NEW REDUNDANT CONDUIT PATH "B" (CABLE TV FIBER TO FOLLOW SAME ROUTE AS TELECOMMUNICATION FIBER ON SITE)
NEW COPPER CONDUIT WITH NEW CAT6A FIBER
A A
NEW WAN FIBER FROM SERVICE PROVIDER
B3 B01 WEST SIDE UNDERGOURND FIBER ENTRANCE
NOT TO SCALE
BUILDING OUTLINE
FIBER IN NEW CABLE TRAY OR J HOOKS
HH NEW HANDHOLE EXISTING MANHOLE
UNIVERSITY OF WISCONSIN HOSPITAL
B B
11 BLDG
KEYNOTES
C2 EXISTING CATV EQUIPMENT - B05
NOT TO SCALE
HH
C 3MIN. 20' SEPERATION, TYP.
BLDG 4
BLDG 22
TYP.
BLDG 6
FLAG
10OVERLOOK TER
1. SITE TELECOMMUNICATION FIBER ROUTE. CONTRACTOR TO INSTALL FOUR (4) NEW 4" PVC CONDUIT, TRENCH AND REPLACE EXISTING LANDSCAPE TO MATCH EXISTING CONDITIONS. DIRECTIONAL BORE AT SIDEWALK, CURB, AND ASPHALT, SEE DETAILS ON SHEET T-501 FOR ADDITIONAL INFORMATION. PROVIDE NEW 24F REDUNDANT OSP OS2 FIBER TO EACH OUTBUILDING, SEE SHEET T-601 FOR ADDITIONAL INFORMATION.
2. MAIN INCOMING WAN FIBER FROM SERVICE PROVIDER TO B01 TO BE REPLACED, COORDINATE REPLACEMENT WITH SERVICE PROVIDER AND COR PRIOR TO COMMENCING WORK.
3. EXISTING DIRECT BURY FACILITY TELEVISION FIBER BACKBONE AND CABLING TO REMAIN, PROTECT IN PLACE.
4. CONSTRUCT NEW HANDHOLE - SEE DETAIL C1, SHEET T-501 C
5. CONSTRUCT FIBER CABLE TRAYS WITHIN OVERHEAD WALKWAY
6. ELECTRICAL/TELECOMMUNICATION MANHOLES TO REMAIN, PROTECT IN PLACE.
7. ALL NEW UNDERGROUND CONDUIT INSTALLED MUST BE A MINIMUM OF 20' AWAY FROM ANY OTHER NEW OR EXISTING CONDUITS.
8. NEW LOCATION FOR CABLE TV SATELITES ON UPPER PENTHOUSE ROOF, SEE TELECOMMUNICATION SHEETS IN BUILDING PACKAGE 1 FOR ADDITIONAL INFORMATION.
9. NEW CONDUIT FOR FIBER FOR NEW HEAD-END CATV LOCATION. FIBER RUNS FROM EXISTING HAND HOLE TO THE ROOF OF THE UPPER PENTHOUSE ON BUILDING 1. SEE BUILDING 1 TELECOMMUNICATION PLANS FOR RISER LOCATIONS AND ADDITIONAL INFORMATION.HH
4HH
13 12UNIVERSITY BAY DRIVE
BLDG 5
D
8HH
BLDG 1
= Delete = Revised Boring Routing
HH
= Revised Excavation Routing
BLDG 12
TYP.HIGHLAND AVE.
10.
NEW FIBER IN NEW CABLE TRAY/CONDUIT. SEE BUILDING PACKAGES
TELECOMMUNICATION PLANS AND SUBMIT COORDINATION DRAWINGS SHOWING REDUNDANT, PHYSICALLY SEPARATED FIBER ROUTES.HH
11. CONTRACTOR TO COORDINATE WITH THE COR FOR THE UNIVERSITY OF WISCONSIN HELICOPTER PAD DURING CONSTRUCTION OF THE "D-WING" TOWER FOR BUILDING 1.
12. EXISTING CABLE TV HEAD-END EQUIPMENT ON THE ROOF AND ON THE GROUND LEVEL IN BUILDING 5, TO BE RELOCATED TO THE UPPER PENTHOUSE ROOF OF BUILDING 1. SEE BUILDING 1 PACKAGE FOR ADDITIONAL INFORMATION.
13. CONTRACTOR TO INSTALL NEW UNDERGROUND COPPER CONDUIT WITH CAT 6A FIBER FROM BUILDING 5 TO BUILDING 4.
D
TYP.OVERLOOK TER
47/20/2022 7:13:24 AM
C125
SERVER ROOM
GROUND FLOOR
FUTURE PARKING GARAGE LOCATION
1HH
HH 4
SURVEY NOTES
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND , PHOTOGRAPHIC AND VISUAL SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION MAY HAVE OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THEMIN. 20' SEPERATION, TYP.
HH SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION.
GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY AND MARKHH
E 6
WOODED EMBANKMENT
HH TYP. 1
4HH
BLDG 7
ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT. SURVEY WILL REQUIRE BOTH GPR LOCATION AND POTHOLING FOR
10 VERIFICATION. SEE SPECIFICATIONS 02 21 13 SITE SURVEYS
CONTRACTOR TO PROVIDE UTILITY LOCATION
SERVICE PRIOR TO EXCAVATION FOR VERIFICATION E
OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO 2 OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS EXPENSE.
CONTRACTOR SHALL PROVIDE ONE HARD AND ONE ELECTRONIC COPY OF SURVEY TO THE VA. CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.
BLDG 2SERVICE
ENCLOSURE
ROOFTOP UNIT
BIM 360://607-21-700 EHRM Infrastructure Upgrades Madison WI/607-21-700.Mad.EHRM.MEP.SITE.rvt
F F
TELECOMMUNICATIONS SITE PLAN F1
SCALE: 1 : 6000
Revision 1 Revisions:
Date 1 Date:
CONSULTANT
ARCHITECT/ENGINEER OF RECORD
A/E:
TRIPLE C - The A/E Group 4625 Lindell Blvd., 2nd Floor, 2064 St. Louis, MO 63108
MAT PERKINS 314-372-0067
STAMP
07/22/202207/22/2022
Office of Construction and Facilities Management U.S. Department of Veterans Affairs
Drawing Title
TELECOMMUNICATIONS SITE PLAN
Approved:
Phase
ISSUED FOR CONSTRUCTION
FULLY SPRINKLERED
Project Title
EHRM INFRASTRUCTURE UPGRADES
Location 2500 Overlook Terrace, Madison, WI 53705
| Issue Date | Checked | Drawn |
| 07/22/2022 | M. PERKINS | G. Weaver |
Project Number 607-21-700 Building Number
SITE
Drawing Number
TN100
VA FORM 08 - 6231
2 3 4
5 6 7
8 9 10 image5.jpeg image6.jpeg image7.jpeg image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.png image20.png image21.png image22.png image23.png image24.png image25.png image26.png image27.png image28.png image29.png image30.png image31.png image32.png image33.png image34.png image35.png image36.png image37.png image38.png image39.png image40.png image41.png image42.png image43.png image44.png image45.png image46.png image47.png image48.png image1.png image2.png image3.png image4.png