This document is a Request for Proposal (RFP) from Montague Area Public Schools in Montague, Michigan for playground resurfacing at the Montague Area Childhood Center. The scope of work includes the removal of the existing rubber safety surface and the installation of a new poured artificial play turf system with a rubber base, covering approximately 2,520 square feet. Sealed bids will be accepted until 1:00 p.m. on March 4, 2024, and the bid opening will take place the same day. Contractors are encouraged to schedule a site visit with the Director of Operations. The project is anticipated to commence after June 9, 2024 and be completed by August 1, 2024. The District reserves the right to interview contractors and make a final approval at their March 11th Board meeting.
The RFP outlines detailed specifications for the playground turf and rubber base products, including required certifications and testing standards. Contractors must submit a bid form, familial disclosure statement, and Iran sanctions compliance certification. The successful contractor will be required to provide a 10-year commercial warranty on the products. Payments will be made per the terms and conditions outlined in the RFP. The District reserves the right to reject any and all bids.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL
Montague Area Public Schools
Playground Resurfacing at the Montague Area Childhood Center
Montague Area Public Schools is seeking proposals from qualified contractors to remove and replace the current playground rubber surfacing at the Montague Area Childhood Center. The proposal should encompass (1) Removal of existing rubber safety surface (2) Installation of new poured artificial play turf system with a rubber base. The work shall commence after June 9, 2024 and shall be completed no later than August 1, 2024.
Montague Area Public Schools will accept sealed bids for playground resurfacing at the Montague Area
Childhood Center. Bids will be accepted until 1:00 p.m. on March 4, 2024. No oral, telephone, E-Mail, telegraphic, or facsimile proposals will be accepted. No proposals will be accepted after the time of closing. The bid opening will take place at 1:00 p.m. on March 4, 2024 in the Central Office Conference
Room located at 4882 Stanton Blvd., Montague, Michigan.
All bids must meet or exceed all the specifications contained herein. Bids must be submitted on the attached form and be signed by the bidder. Bid documents to be returned:
One signed copy of the bid form
One signed copy of the Familial Disclosure Statement
One signed copy confirming compliance with the Iran Economics Sanctions Act
Specifications associated with the project being presented in this bid
Documents can be submitted to the attention of:
Montague Area Public Schools
Stacey Brown, Director of Business Affairs
Re: Playground Resurfacing Bid
4882 Stanton Blvd.
Montague, MI 49437
Montague Area Public Schools reserves the right to reject any and all bids and to waive omissions, irregularities, or clerical errors not affecting substantial compliance with the plans and specifications. The
District reserves the right to interview contractors regarding their proposals. It is anticipated that the
Board will make their final approval at their March 11th Board meeting.
Any questions should be referred to Stacey Brown, Director of Business Affairs at browns@mapsk12.org no later than 3:00 p.m. on March 1, 2024. All questions and responses pertinent to this RFP will be posted on the District’s website, www.mapsk12.org.
Please contact the individual below to schedule a visit to the school and to receive additional information about the project.
mailto:browns@mapsk12.org
Tom Cederquist
Director of Operations
231-981-4606 cederquistt@mapsk12.org
BID FORM
Company Name: _________________________________________________________________
PROJECT: Montague Area Public Schools – Playground Resurfacing at the Montague Area
Childhood Center
The undersigned, having familiarized themselves with all local conditions affecting the cost of work, and having examined the sites and all applicable Bidding Documents herein, and herein referenced, including, but not limited to, all addenda issued thereto, hereby propose to furnish all labor, material, equipment, applicable taxes and services required for proper completion of the above named project for the sum of:
1. Playground Resurfacing:________________________________
SIGNATORY AUTHORITY: The undersigned certifies they are an authorized agent of the bidding entity, and legally able to bind the bidding entity to the terms, conditions and responsibilities of this, and all referenced bid documents.
Name (please print): ________________________________________________
Signature: ___________________________________________________________
Title: __________________________________________________
Date: ______________________________
Contact Information:
Phone(s): _____________________________________________________________________
Email: ______________________________________________________________________
Company Address: ______________________________________________________________
Familial Disclosure Statement
In accordance with Section 1267 of Michigan Revised School Code this sworn and notarized statement of an authorized representative, discloses any familial relationship between the owner and/or any employee of the Bidder, and any member of the project Owner’s governing Board(s) or Superintendent(s). The law does not preclude bidders from submitting bids or a Board of
Education from approving a bid with a familial relationship. The law requires the notification to allow Board members and the Superintendent to avoid recommending or voting on a conflict of interest.
The following are members of the Board for Montague Area Public Schools:
Brent Raeth Cindy Francis Scott Beishuizen Joel Smith
Tom Johnson Amanda Dahl Karen Neubauer
The bidder must check one of the following:
No, there is not a familial relationship between the Owner or any employee of the
Bidder and any member of the Montague Area Public Schools Board.
Yes, there is a familial relationship between the Owner or an employee of the Bidder and a member of the Montague Area Public Schools Board.
Owner/Employee Board Member Relationship
1.
2.
3.
4.
BIDDER: NOTARY:
Name of Company_______________________________ Subscribed and sworn this _____day of
Name of Representative___________________________ __________________________, 2024.
Signature_______________________________________ Notary Signature____________________
Date____________________ Notary Public, State of _______________
County of __________________________
My Commission expires_______________
IRAN ECONOMIC SANCTIONS ACT
Michigan Public Act No. 517 of 2012
The undersigned, the owner or authorized officer of ______________________________ (the
“Bidder”), pursuant to the compliance certification requirement provided in the Montague Area
Public Schools (the “School District”) Request for Proposals for Playground Resurfacing at the
Montague Area Childhood Center (the “RFP”), hereby certifies, represents and warrants that the
Bidder (including officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the “Act”), and that in the event Bidder is awarded a contract/purchase order as a result of the aforementioned RFP, the Bidder will not become an “Iran linked business” at any time during the course of performing the Work or any services under the contract.
The Bidder further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract/purchase order or proposed contract for which false certification was made, whichever is greater, the cost of the School District’s investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal three (3) years from the date it is determined that the person has submitted the false certification.
BIDDER: NOTARY:
Name of Company_________________________ Subscribed and sworn this _____day of
Name of Representative_____________________ __________________________, 2024.
Signature_________________________________ Notary Signature____________________
Date____________________ Notary Public, State of _______________
County of _________________________
My Commission Expires______________
PLAYGROUND RESURFACING AT THE MONTAGUE AREA CHILDHOOD CENTER
1. Summary
a. Provide all equipment and materials for all the work necessary to complete the Playground Resurfacing Project.
b. Project scope includes the removal of the existing poured-in-place rubber surfacing followed by the installation of a new poured artificial play turf system with a rubber base. The playground area is 2,520 square feet.
c. The use of brand names provided in the specifications are used for the purpose of establishing a grade or quality. Products submitted in this bid should meet or exceed the specifications listed below.
d. The playground system shall consist of
i. Perfect Turf® PlayGround Turf 55™ or equivalent
ii. A poured rubber base adequate to protect against the fall height of the play equipment and meeting the minimum specifications outlined below
iii. A crushed gravel support base per construction details below
e. Contractors are highly encouraged to reach out to Tom Cederquist, Director of Operations, for a site visit. He can be reached at cederquistt@mapsk12.org.
f. The Montague Area Childhood Center is located at 9151 Dicey Street, Montague, MI 49437.
2. Product
a. Perfect Turf® PlayGround Turf 55™ or equivalent
i. Playground turf must meet ASTM F1951-14: Standard Specification for
Determination of Accessibility of Surface Systems Under and Around Playground
Equipment, and ASTM F1292-17a, Standard Specification for Impact Attenuation of Surfacing Materials within the Use Zone of Playground Equipment.
ii. Turf must be a complete synthetic grass system, consisting of a synthetic grass with a pile height of at least 1 1/8 inches long and not to exceed 1 3/8 inches long, 100% monofilament polyethylene fibers and polyethylene/polyester thatch layer, tufted on a 3/8" tufting machine with a minimum face weight of 55 ounces of yarn per square yard. The fibers shall include anti-static yarns, anti-microbial additives and “cool grass” reflective pigments to reduce the surface temperature. Synthetic turf products utilizing nylon blades or nylon thatch layers will not be acceptable. The system should be infilled with between 1.5 to
2.0 pounds per square foot of acrylic coated sand (commonly known as T Cool®) infill. Systems utilizing granular rubber products made of recycled tires infilled in the grass blades will not be acceptable. The system shall include a single, dimensionally stable, two-component primary backing and have a minimum of
20 ounces of secondary polyurethane backing per square yard. The finished product shall also include perforations in a 2” by 2” pattern to ensure excellent surface drainage.
b. Poured rubber base should meet or exceed these specifications
i. Product Name
1. Impact Attenuating Rubber Basemat (Rubber buffings with aromatic urethane) mailto:cederquistt@mapsk12.org
ii. Manufacturer
1. Qualipur and Sparton Enterprises
2. Approved equivalent
iii. Product Description
BASIC USE
Rubber buffings basemat cushion layer is designed for use in playgrounds and water play areas.
COMPOSITION & MATERIALS
The basemat material consists of 100% post-consumer recycled, 3/8” shredded, SBR (styrene butadiene rubber) and high-grade aromatic polyurethane.
PRODUCT DIMENSIONS
The height of the playground equipment determines the required basemat thickness. Basemat thicknesses may vary throughout a playground site.
Basemat thicknesses are determined by the “Critical Fall Height” requirements through ASTM testing. ASTM test results must be supplied showing critical fall height various thicknesses protect against.
Standard Thicknesses Available
2.0” – up to 4ft. CFH
2.75” – up to 6ft. CFH
3.0” – up to 7ft. CFH
3.5” – up to 8ft. CFH
4.0” – up to 10ft. CFH
5.0” – up to 12ft. CFH
iv. Technical Data
APPLICABLE STANDARDS
ASTM International
• ASTM D412 Standard Test Methods for Vulcanized Rubber and
Thermoplastic Rubbers and Thermoplastic Elastomers-Tension
• ASTM D624 Standard Test Methods for Tear Strength of Conventional
Vulcanized Rubber and Thermoplastic Elastomers
• ASTM C1028 Standard Test Method for Determining the Static
Coefficient of Friction of Ceramic Tile and Other Like Surfaces by the
Horizontal Dynamometer Pull Meter Method
• ASTM D2859 Standard Test Method for Flammability of Finished Textile
Floor Covering Materials
• ASTM E303 Standard Test Method for Measuring Surface
Frictional Properties Using the British Pendulum Tester
• ASTM F1292 Standard Specification for Impact Attenuation of Surface
Systems Under and Around Playground Equipment
ENVIRONMENTAL CONSIDERATIONS
This system makes extensive use of recycled tire rubber as a major component.
PHYSICAL/CHEMICAL PROPERTIES
• Shock Attenuation (ASTM F1292)
– Gmax - Less than 200
– Head Injury Criteria – 1000 or less
• Accessibility (ASTM 1951)
Straight Baseline Propulsion – 12.15 lbs Work/ft-Force
Turning Baseline Propulsion - 7.30 lbs
Work/ft-Force
• Tensile Strength (ASTM D412) - 17.51 PSI
• Tear Resistance (ASTM D624) - 6.26 lbs/force/inch
• Dry Static Coefficient of Friction (ASTM C1028) - 0.77
• Wet Static Coefficient of Friction (ASTM C1028) - .56
• Wet Skid Resistance (ASTM E303) – 51
• Flammability (ASTM D2859) – Pass
• Water Permeability (ASTM F1551-03) gal/min/yd2 = 363.5
Required mix proportions by weight
Basemat – 14% - 16% polyurethane, 100# rubber
v. Installation
PREPARATORY WORK
Rubber materials should be protected from exposure to harmful environmental conditions (moisture) and at a minimum temperature of 50 degrees F and a maximum temperature of 90 degrees F. Install surfacing system when minimum ambient temperature is 50 degrees F and maximum ambient temperature is 90 degrees F. Basemat may be installed in a light rain. Do not install Top Coat in any type of moisture or precipitation.
SUBSTRATE PREPARATION
1. Compacted Stone Base
Substrate must be in accordance with surfacing manufacturers Compacted
Stone Base Installation Instructions before impact attenuating basemat can be applied.
2. Asphalt Substrate
New asphalt substrates must be allowed to cure for a minimum of 30 days before impact attenuating basemat can be applied.
3. Concrete Substrate
New concrete substrates must cure for a minimum of 10 days before impact attenuating basemat can be applied.
BASIC METHODS
Installation
Impact attenuating rubber basemat cannot proceed until all applicable site work, including substrate preparation, fencing, playground equipment installation and other relevant work, has been completed and approved by the safety surfacing installer.
Basemat Primer
Using a bristle brush, apply ample urethane primer to all curbing and or vertical substrates, which the rubber surfacing system will contact.
Basemat Installation
Using screed sticks and gauge poles, install the basemat rubber materials to
1/8” – 1/4” higher than required thickness. Using pool trowels, pull the basemat material together using consistent pressure throughout. Repeat the process until all areas, including use zones, comply with the architectural plans and specification requirements. Allow basemat to cure for sufficient time (24 hours) so that indentations are not left in the basemat material.
Installation contractor must verify that the basemat has cured sufficiently before applying the finished topcoat
vi. Quality Assurance
1. Qualifications – Utilize an installer certified and trained by the manufacturer of playground surfacing system, having experience with other projects of the scope and scale of the work described in this section.
2. Certifications – Certification by manufacturer that installer is an approved applicator of impact attenuating basemat
3. International Play Equipment Manufacturers Association (IPEMA)
Certified
c. A crushed gravel support base per construction details below
3. Certified Installers
a. Installation shall be performed by Perfect Turf® (or equivalent) approved contractors.
4. Warranty Documentation
a. Products shall have a 10-year commercial warranty
b. Ensure warranty registration forms have been completed in District’s name and registered with approved manufacturer. Provide documentation/photo copy of the warranty submittal to the District.
| Playground Resurfacing RFP |
| Summary of MACC Playground Specs(1) |