NOTICE OF INTENT/ANNUAL REQUIREMENTS SYNOPSIS
COMPETITIVE MULTIPLE AWARD CONSTRUCTION BASIC ORDERING AGREEMENT
(BOA) (MACB)
This notice is for the Tinker Air Force Base (TAFB) Multiple Award Construction Basic
Ordering Agreement (BOA) Program to provide a broad range of construction, repair, and maintenance of real property. The BOA program will include: 35% Design-Build, 100% Design-
Build and Construction Only services at TAFB, OK.
This competitive acquisition approach will set-aside, for small businesses, Order Proposal
Requests (OPRs) with a magnitude of construction less than or equal to $25M and on a full and open basis for OPR(s) with a magnitude of construction more than $25M. The North American
Industry Classification System (NAICS) Code is 236210 Industrial Building Construction with corresponding annual size standard of $39,500,000.
As Identified in the BOA Source Sought Synopsis, the TAFB will procure all BOA requirements utilizing a phased procurement process outlined below:
Phase One- Competition for BOA Holders: Basic Ordering Agreement Invitation will be released at least once a year to allow interested contractors an opportunity to submit a proposal for evaluation to obtain an executed BOA. The Government will execute no-cost BOAs to offerors who are deemed responsible in accordance with (IAW) the FAR Part 9, as supplemented, whose proposal conforms to the BOA Invitation requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Instructions to Offerors and is assessed based on the evaluation factors and subfactors to be responsive, responsible, and qualified to the Government. The Government seeks to issue BOAs to offerors that gives the Air
Force the greatest confidence they will best meet the requirements.
The BOAs will be valid for a period of up to five (5) years beginning from the effective date of the initial BOA execution. An annual synopsis for requirements falling under the scope of the
MACB program will be released in SAM.gov. The annual synopsis covers requirements related to Construction Services that are within the scope of, and designated for, the MACB program and that emerge within the year after the annual synopsis is published. The Government will not conduct a separate BOA synopsis for any such emergent requirement prior to issuing the applicable competitive OPR(s)
Phase Two- Competitive Requirement/Order Process within BOA Holder Pool: The Procuring
Contracting Officer (PCO) will issue competitive OPRs for specific requirements falling under the scope of the MACB program. An offeror must be a qualified BOA holder as of the closing date of an OPR. The Government will confirm that an offeror is a qualified BOA holder by checking the effective date of an offerors BOA. All OPR(s) will result in order contracts. NOTE:
The annual BOA Invitation may be the only opportunity contractors will have to obtain an executed BOA in order to propose on OPRs issued within the year; additional BOA proposals may not be solicited, accepted, and may not be executed, at any time other than during the annual
BOA RFP, even for those emergent requirements not specifically identified in the annual synopsis. Therefore, if a contractor desires to participate in ANY future BOA OPR that may arise within the year, it is imperative that the contractor submit a proposal in response to the annual BOA Invitation.
IMPORTANT NOTICE: Offerors are required to complete their registration in the System for
Award Management (SAM) database via the website https://www.sam.gov. Offerors are strongly recommended to review their information in SAM to validate that it is current and up to date.
Failure to register in SAM makes an offeror ineligible for BOA Issuance and award of DoD contracts IAW FAR 4.1102registered in SAM database (http://www.sam.gov/).
DISCLAIMER: The information being requested does not constitute a commitment on the part of the government to award a contract, nor to pay for any costs incurred as a result in replying to this notice. This notice should not be construed as a commitment by the government for any purpose.
ANNUAL SYNOPSIS:
An Annual BOA Synopsis is hereby published as follows:
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR INDUSTRIAL WASTE
TREATMNT SYSTEM, TAC COMPLEX at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $5,000,000 and $10,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR HVAC, DINING
FACILITY 5905 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $5,000,000 and $10,000,000.
http://www.sam.gov/
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR SIDING, E-3 MX
HANGAR, B230 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $5,000,000 and $10,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR E-3 MX Hangar Docks 1
& 3 HANGAR DOORS, B230 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and
Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR AND CONSTRUCT
PARKING AREA, N SECTION B3001 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $5,000,000 and $10,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to INSTALL LIGHTS ON THE
APPROACH END RWY 13/31 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and
Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $100,000 and $250,000.
equipment, transportation and other incidentals necessary to REPAIR PARKING LOT AT
COMMISSARY AND BX at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR ARNOLD AVE BTWN H
AVE AND M AVE at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to MAINTAIN EXPANSION JOINTS
AND RNWY CRACKS at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR HVAC R-22 PACKAGE
UNITS, B685 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.
equipment, transportation and other incidentals necessary to REPAIR 2 AIR HANDLERS
B6001 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB
Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR FIRE ALARMS &
WALLS, PZ AREA, BLDG3 (FSD3) at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $250,000 and $500,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR FIRE ALARM
WARNING DEVICES,2NDFL ADMIN B469 (FSD III) at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering
Agreement (BOA); And conform to all specifications including but not limited to appropriate
UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $250,000 and $500,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR FIRE PROTECTION, B4004 (FSD3) at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As estimated between $250,000 and $500,000.
equipment, transportation and other incidentals necessary to REPLACE EXISTING WINDOWS
B1 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB
Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR RESTROOMS, B1 at
Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between
$1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to CONSTRUCT AIRCRAFT PAD
B916 (FIRE DEPT) at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Task
Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $250,000 and $500,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR KITCHEN, B117 at
Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between
$500,000 and $1,000,000.
equipment, transportation and other incidentals necessary to RENOVATE RESTROOMS, B117 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between
$500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to CONSTRUCT STORM SHELTER
BTWN DORMS B5929&B5942 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and
Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR VENTILATION
SYSTEM, AFSC PZIM AREA, B3001 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR HERCULES RD FROM
PATROL RD TO MERCURY at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and
Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.
equipment, transportation and other incidentals necessary to CONSTRUCT HANDICAP
ACCESSIBLE ELEVATOR B282 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and
Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to RENOVATE
TELECOMMUNICATIONS ITN FACILITY B416 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering
Agreement (BOA); And conform to all specifications including but not limited to appropriate
UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR FIRE ALARM
WARNING DEVICES,2NDFL ADMIN B469 at Tinker Air Force Base (TAFB), Oklahoma.
The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $250,000 and $500,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR MENS & WOMENS
RESTROOMS IN 552 ACW HQS, B280 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $100,000 and $250,000.
equipment, transportation and other incidentals necessary to RENOVATE AIRCRAFT PARTS
STORAGE, NAVY AREA, BLDG 9201 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPLACE HVAC DUCT
SYSTEM, B4064 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR PERIMETER FENCE, FMO TO SW CORNER OF HOUSING at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR AREA FOR SECURE
STORAGE, B11 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $5,000,000 and $10,000,000.
equipment, transportation and other incidentals necessary to RENOVATE RESTROOM, DOOR 3, B1 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $5,000,000 and $10,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to RENOVATE FIRST FLOOR, B1002 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB
Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As estimated between $1,000,000 and $5,000,000.