About this file

This is a state contract for outsole blockers awarded by the Michigan Department of Corrections (MDOC) to Soletech, Inc., a Massachusetts corporation. The contract includes three change notices documenting modifications to the original agreement. The primary contacts are Thomas J. Costin (President, Soletech) and Marta Moore (Contract Administrator, MDOC), with Buddy Reed serving as the Program Manager. The contract is effective November 13, 2025, and covers services for Michigan State Industries (MSI), the state's inmate manufacturing operation.

The contract supplies outsole blockers (shoe components) manufactured in Tianjin, China, at a unit price of $6.50 per pair, with pricing firm for the initial one-year term and subject to adjustment during option years upon written notice. The contract includes six available one-year renewal options at the state's discretion, extending potential coverage through November 2032. Payment terms are Net 45 days with a 3% discount for payment within 20 days. The minimum delivery requirement is 14,400 pairs, with subsequent orders requiring at least 24 pairs per size, though the state bears freight costs for smaller shipments. Delivery timeframes are 30 calendar days domestically and 90 days internationally. Change Notice 2 (effective May 12, 2026) increased the contract value by $221,000.00 for total aggregate value of $459,334.00, and Change Notice 3 (effective July 9, 2026) further increased it by $155,000.00 to $614,334.00, extending the revised expiration date to November 12, 2027. The contractor must maintain a 4-6 month inventory supply and comply with comprehensive security, quality assurance, warranty, and reporting requirements specific to correctional facility operations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Julie Hamp, Deputy Director

Thomas J. Costin

Revised 2/2019

CONTRACT CHANGE NOTICE

Change Notice Number 1 .

to

Contract Number 260000000063.

C O

N T

R A

C T

R

Soletech, Inc.

S T

A T

E

P ro gr am

M an ag er

Buddy Reed MDOC

P.O. Box 180

616-527-2510 ex. 0412

Nahant, MA 01908 Reedb4@michigan.gov

Thomas J. Costin C o nt ra ct

A dm in is tr at or Marta Moore MDOC

617-899-9533 517-241-3188 t.costin@soletech.com Moorem42@michigan.gov

CV0000806

STATE OF MICHIGAN PROCUREMENT

Department of Corrections 206 E Michigan Ave, Lansing MI 48933 P.O. Box 30003, Lansing MI 48909

CONTRACT SUMMARY

DESCRIPTION: Outsole Blockers for MSI

INITIAL EFFECTIVE DATE INITIAL EXPIRATION DATE

INITIAL AVAILABLE

OPTIONS

EXPIRATION DATE BEFORE

CHANGE(S) NOTED BELOW

November 13, 2025 November 12, 2026 Six, one-year

PAYMENT TERMS DELIVERY TIMEFRAME

3% 20 days; Net 45

ALTERNATE PAYMENT OPTIONS EXTENDED PURCHASING

P-card Payment Request (PRC) Other Yes No

MINIMUM DELIVERY REQUIREMENTS

14,400 Pairs

DESCRIPTION OF CHANGE NOTICE

OPTION LENGTH OF OPTION EXTENSION

LENGTH OF

EXTENSION

REVISED EXP. DATE

CURRENT VALUE VALUE OF CHANGE NOTICE ESTIMATED AGGREGATE CONTRACT VALUE

$238,334.00 $0.00 $238,334.00 DESCRIPTION: Effective December 9, 2025, Schedule B-Pricing has been updated in the attached revised section.

All other terms, conditions, specifications, and pricing remain the same. Per contractor and agency agreement.

CHANGE NOTICE NO. 1 TO CONTRACT NO. 260000000063

FOR THE CONTRACTOR:

Company Name

Authorized Agent Signature

Authorized Agent (Print or Type)

Date

FOR THE STATE:

Signature

Name & Title

Michigan Department of Corrections Agency

Contract No. 260000000063: Change Notice 1 Schedule B - Pricing

Outsole Blockers for Michigan State Industries

1. Pricing must include all costs, including but not limited to, any one-time or set-up charges, fees, and potential costs that Contractor may charge the State (e.g., shipping and handling, per piece pricing, and palletizing).

2. The Contractor is encouraged to offer quick payment terms. The number of days must not include processing time for payment to be received by the Contractor's financial institution.

Quick payment terms: 3% discount off invoice if paid within 20 days after receipt of invoice.

3. Tariff costs imposed to date must be calculated into the per pair price of the Outsole Blockers and listed in the Schedule C - Cost Factors.

4.

of orders.

ITEM # DESCRIPTION U/M UNIT COST

1. Outsole Blockers Pair $6.50 $6.20

NOTICE OF CONTRACT

NOTICE OF CONTRACT NO. 260000000063 .

between

THE STATE OF MICHIGAN

and

C

N T

R A

C T

R

S T

A T

E P ro gr am

M an ag er

Buddy Reed MDOC

P.O. Box 180 616-527-2510 ext. 0412

Nahant, MA 01908 reedb4@michigan.gov

Thomas J. Costin C o nt ra ct

A dm in is tr at or

Marta Moore MDOC

617-899-9533 517-241-3188 t.costin@soletech.com Moorem42@michigan.gov

CV0000806

CONTRACT SUMMARY

DESCRIPTION: Outsole Blockers for MSI

INITIAL EFFECTIVE DATE INITIAL EXPIRATION DATE

INITIAL AVAILABLE

OPTIONS

EXPIRATION DATE BEFORE

CHANGE(S) NOTED BELOW

November 13, 2025 November 12, 2026 Six, one-year

PAYMENT TERMS DELIVERY TIMEFRAME

3% 20 Days; Net 45

ALTERNATE PAYMENT OPTIONS EXTENDED PURCHASING

P-card Payment Request (PRC) Other Yes No

MINIMUM DELIVERY REQUIREMENTS

14,400 Pairs

MISCELLANEOUS INFORMATION

THIS IS NOT AN ORDER. This Contract Agreement is awarded on the basis of the solicitation number 250000002551. Orders for Delivery will be issued directly by the Departments through the issuance of a Delivery Order (DO).

ESTIMATED CONTRACT VALUE AT TIME OF EXECUTION $238,334.00

STATE OF MICHIGAN

Department of Corrections 206 E Michigan Ave, Lansing MI 48933 P.O. Box 30003, Lansing MI 48909

CONTRACT NO. 260000000063

FOR THE CONTRACTOR:

Company Name

Authorized Agent Signature

Authorized Agent (Print or Type)

FOR THE STATE:

Signature

Name & Title

Michigan Department of Corrections

Agency

STANDARD CONTRACT TERMS

Contract State and Soletech, Inc Contractor Massachusetts Corporation. This Contract is effective on November 13, 2025 Effective Date November 12, 2026 Term

This Contract may be renewed for up to six additional one-year period(s). Renewal is at the sole discretion of the State and will automatically extend the Term of this Contract. The State will document its exercise of renewal options via Contract Change Notice.

The parties agree as follows:

Duties of Contractor. Contractor must perform the services and provide the deliverables (the Contract Activities attached as Schedule A Statement of Work. An obligation to provide delivery of any commodity is considered a service and is a Contract Activity.

Contractor must furnish all labor, equipment, materials, and supplies necessary for the performance of the Contract Activities unless otherwise specified in a Statement of Work.

Contractor must: (a) perform the Contract Activities in a timely, professional, safe, and workmanlike manner consistent with standards in the trade, profession, or industry; (b) meet or exceed the performance and operational standards, and specifications of the Contract; (c) provide all Contract Activities in good quality, with no material defects; (d) not interfere with the authorizations necessary for the performance of the Contract; (f) cooperate with the State, of the Contract; (g) return to the State any State-furnished equipment or other resources in the same condition as when provided when no longer required for the Contract; (h) assign to the State any claims resulting from state or federal antitrust violations to the extent that those violations concern materials or services supplied by third parties toward fulfillment of the Contract; (i) comply with all State physical and IT security policies and standards which will be made available upon request; and (j) provide the State priority in performance of the Contract except as mandated by federal disaster response requirements. Any breach under this paragraph is considered a material breach.

Contractor must also be clearly identifiable while on State property by wearing identification issued by the State, and clearly identify themselves whenever making contact with the State.

Notices. All notices and other communications required or permitted under this Contract must be in writing and will be considered given and received: (a) when verified by written receipt if sent by courier; (b) when actually received if sent by mail without verification of receipt; or (c) when verified by automated receipt or electronic logs if sent by facsimile or email.

If to State: If to Contractor:

Marta Moore Michigan Department of Corrections 206 E. Michigan Ave Lansing, MI 48933 MDOC-Procurement@michigan.gov

Thomas J. Costin, President P.O. Box 180 Nahant, MA 01908

517-241-3188 t.costin@soletech.com 617-899-9533

Contract Administrator. The Contract Administrator, or the individual duly authorized for each party, is the only person authorized to modify any terms of this Contract, and approve and

Contract Administrator

State: Contractor:

Marta Moore Michigan Department of Corrections 206 E. Michigan Ave Lansing, MI 48933 MooreM42@michigan.gov 517-241-3188

Thomas J. Costin, President P.O. Box 180 Nahant, MA 01908 t.costin@soletech.com 617-899-9533

Program Manager. The Program Manager for each party will monitor and coordinate the day-to- Program Manager

State: Contractor:

Buddy Reed Michigan Department of Corrections Industries Supervisor 1727 W. Bluewater Hwy, Ionia, MI 48846 Reedb4@michigan.gov 616-527-2510 ext. 0412

Thomas J. Costin, President P.O. Box 180 Nahant, MA 01908 t.costin@soletech.com 617-899-9533

Performance Guarantee. Contractor must at all times have financial resources sufficient, in the opinion of the State, to ensure performance of the Contract and must provide proof upon request. The State may require a performance bond (as specified in a Statement of Work) if, in the opinion of the State, it will ensure performance of the Contract.

Insurance Requirements.

A. General Requirements. Contractor, at its sole expense, must maintain the insurance coverage as specified herein for the duration of the Term. Minimum limits may be satisfied by any combination of primary liability, umbrella or excess liability, and self-insurance coverage. To the extent damages are covered by any required insurance, Contractor waives all rights against the State for such damages. Failure to maintain required insurance does not limit this waiver.

B. Qualification of Insurers. Except for self-insured coverage, all policies must be written by an insurer with an A.M. Best rating of A- VII or higher unless otherwise approved by DTMB Enterprise Risk Management.

C. Primary and Non-Contributory Coverage. All policies for which the State of Michigan is required to be named as an additional insured must be on a primary and non-contributory basis.

D. Claims-Made Coverage. If any required policies provide claims-made coverage, Contractor must:

(1) Maintain coverage and provide evidence of coverage for at least 3 years after the later of the expiration or termination of the Contract or the completion of all its duties under the Contract;

(2) Purchase extended reporting coverage for a minimum of 3 years after completion of work if coverage is cancelled or not renewed, and not replaced with another claims-made policy form with a retroactive date prior to the Effective Date of this Contract

E. Proof of Insurance

(1) Insurance certificates showing evidence of coverage as required herein must be submitted to the MDOC-Procurement@michigan.gov within 10 days of the contract execution date.

(2) Renewal insurance certificates must be provided on annual basis or as otherwise commensurate with the effective dates of coverage for any insurance required herein.

(3) Insurance certificates must be in the form of a standard ACORD Insurance Certificate unless otherwise approved by DTMB Enterprise Risk Management.

(4) All insurance certificates must clearly identify the Contract Number (e.g., notated under the Description of Operations on an ACORD form).

(5) The State may require additional proofs of insurance or solvency, including but not limited to policy declarations, policy endorsements, policy schedules, self-insured certification/authorization, and balance sheets.

(6) In the event any required coverage is cancelled or not renewed, Contractor must provide written notice to the Contract Administrator no later than 5 business days following such cancellation or nonrenewal.

F. Subcontractors. Contractor is responsible for ensuring its subcontractors carry and maintain insurance coverage.

G. Limits of Coverage & Specific Endorsements. (See Table 6.1 Below)

Table 6.1 Required Limits Additional Requirements

Commercial General Liability Insurance

Minimum Limits:

$1,000,000 Each Occurrence

$1,000,000 Personal & Advertising Injury

Contractor must have their policy endorsed to divisions, agencies, offices, commissions, insureds using endorsement CG 20 10 11 85, or both CG 20 10 12 19 and CG 20 37 12 19.

Required Limits Additional Requirements

$2,000,000 Products/Completed Operations

$2,000,000 General Aggregate

Automobile Liability Insurance

Minimum Limits:

$1,000,000 Per Accident

Contractor must have their policy: (1) endorsed divisions, agencies, offices, commissions, insureds; and (2) include Hired and Non-Owned Automobile coverage.

Workers' Compensation Insurance

Minimum Limits:

Coverage according to applicable laws governing work activities.

Waiver of subrogation, except where waiver is prohibited by law.

Employers Liability Insurance

Minimum Limits:

$500,000 Each Accident

$500,000 Each Employee by Disease

$500,000 Aggregate Disease

H. Non-Waiver. This Section 6 is not intended to and is not to be construed in any manner as waiving, restricting or limiting the liability of either party for any obligations under this Contract, including any provisions hereof requiring Contractor to indemnify, defend and hold harmless the State.

Reserved.

Reserved.

Relationship of the Parties. The relationship between the parties is that of independent contractors. Contractor, its employees, and agents will not be considered employees of the State. No partnership or joint venture relationship is created by virtue of this Contract.

Contractor, and not the State, is responsible for the payment of wages, benefits and taxes of nor bind the other party in any manner whatsoever.

Intellectual Property Rights. If a Statement of Work requires Contractor to create any intellectual property, Contractor hereby acknowledges that the State is and will be the sole and exclusive owner of all right, title, and interest in the Contract Activities and all associated intellectual property rights, if any. Such Contract Activities are works made for hire as defined in Section 101 of the Copyright Act of 1976. To the extent any Contract Activities and related intellectual property do not qualify as works made for hire under the Copyright Act, Contractor will, and hereby does, immediately on its creation, assign, transfer and otherwise convey to the State, irrevocably and in perpetuity, throughout the universe, all right, title and interest in and to the Contract Activities, including all intellectual property rights therein.

Subcontracting. Contractor may not delegate any of its obligations under the Contract without the prior written approval of the State. Contractor must notify the State at least 90 calendar days before the proposed delegation and provide the State any information it requests to determine whether the delegation is in its best interest. If approved, Contractor must: (a) be the sole point of contact regarding all contractual matters, including payment and charges for all Contract Activities; (b) make all payments to the subcontractor; and (c) incorporate the terms and conditions contained in this Contract in any subcontract with a subcontractor.

Contractor remains responsible for the completion of the Contract Activities, compliance with the terms of this Contract, and the acts and omissions of the subcontractor. The State, in its sole discretion, may require the replacement of any subcontractor.

Staffing.

personnel providing services by providing a notice to Contractor.

Background Checks. Pursuant to Michigan law, all agencies subject to IRS Pub. 1075 are required to ask the Michigan State Police to perform fingerprint background checks on all employees, including Contractor and Subcontractor employees, who may have access to any database of information maintained by the federal government that contains confidential or personal information, including, but not limited to, federal tax information. Further, pursuant to Michigan law, any agency described above is prohibited from providing Contractors or Subcontractors with the result of such background check. For more information, please see Michigan Public Act 427 of 2018. Upon request, or as may be specified in a Statement of Work, Contractor must perform background checks on all employees and subcontractors and its employees prior to their assignment. The scope is at the discretion of the State and documentation must be provided as requested. Contractor is responsible for all costs associated with the requested background checks. The State, in its sole discretion, may also perform background checks.

Assignment. Contractor may not assign this Contract to any other party without the prior approval of the State. Upon notice to Contractor, the State, in its sole discretion, may assign in whole or in part, its rights or responsibilities under this Contract to any other party. If the State determines that a novation of the Contract to a third party is necessary, Contractor will agree to the novation and provide all necessary documentation and signatures.

Change of Control. Contractor will notify the State, within 30 days of any public organizational structure or ownership. For purposes of this Contract, a change in control means any of th members; (d) consummation of a merger or consolidation of Contractor with any other entity;

(e) a change in ownership through a transaction or series of transactions; (f) or the board (or the stockholders) approves a plan of complete liquidation. A change of control does not include any consolidation or merger effected exclusively to change the domicile of Contractor, or any transaction or series of transactions principally for bona fide equity financing purposes.

In the event of a change of control, Contractor must require the successor to assume this Contract and all of its obligations under this Contract.

Ordering. Contractor is not authorized to begin performance until receipt of authorization as identified in a Statement of Work.

Acceptance. Contract Activities are subject to inspection and testing by the State within 30

State Review Period provided in a Statement of Work. If the Contract Activities are not fully accepted by the State, the State will notify Contractor by the end of the State Review Period that either: (a) the Contract Activities are accepted but noted deficiencies must be corrected; or (b) the Contract Activities are rejected. If the State finds material deficiencies, it may: (i) reject the Contract Activities without performing any further inspections; (ii) demand performance at no additional cost; or (iii) terminate this Contract in accordance with Section 24, Termination for Cause.

deficiencies or rejection of any Contract Activities, Contractor must cure, at no additional cost, the deficiency and deliver unequivocally acceptable Contract Activities to the State. If acceptance with deficiencies or rejection of the Contract Activities impacts the content or delivery of other non-must determine an agreed to number of days for re-submission that minimizes the overall impact to the Contract. However, nothing herein affects, alters, or relieves Contractor of its obligations to correct deficiencies in accordance with the time response standards set forth in this Contract.

If Contractor is unable or refuses to correct the deficiency within the time response standards set forth in this Contract, the State may cancel the order in whole or in part. The State, or a third party identified by the State, may perform the Contract Activities and recover the difference between the cost to cure and the Contract price plus an additional 10% administrative fee.

Delivery. Contractor must deliver all Contract Activities F.O.B. destination, within the State premises with transportation and handling charges paid by Contractor, unless otherwise xclusive property upon acceptance.

Risk of Loss and Title. Until final acceptance, title and risk of loss or damage to Contract Activities remains with Contractor. Contractor is responsible for filing, processing, and collecting all damage claims. The State will record and report to Contractor any evidence of visible damage. If the State rejects the Contract Activities, Contractor must remove them from the premises within 10 calendar days after notification of rejection. The risk of loss of rejected or non-conforming Contract Activities remains with Contractor. Rejected Contract Activities not removed by Contractor within 10 calendar days will be deemed abandoned by Contractor, and the State will have the right to dispose of it as its own property. Contractor must reimburse the State for costs and expenses incurred in storing or effecting removal or disposition of rejected Contract Activities.

Warranty Period. The warranty period, if applicable, for Contract Activities is a fixed period commencing on the date specified in a Statement of Work. If the Contract Activities do not function as warranted during the warranty period, the State may return such non-conforming Contract Activities to the Contractor for a full refund.

Invoices and Payment. Invoices must conform to the requirements communicated from time-to- Contractor may only charge for Contract Activities provided as specified in a Statement of Work. Invoices must include an itemized statement of all charges. The State is exempt from State sales tax for direct purchases and may be exempt from federal excise tax, if Services usive use. Notwithstanding the foregoing, all fees are exclusive of taxes, and Contractor is responsible for all sales, use and excise taxes, and any other similar taxes, duties and charges of any kind imposed by any federal, state, or local governmental entity on any amounts payable by the State under this Contract.

The State has the right to withhold payment of any disputed amounts until the parties agree as to the validity of the disputed amount. The State will notify Contractor of any dispute within a reasonable time. Payment by the State will not constitute a waiver of any rights as to ent by the State constitutes a waiver of all claims by Contractor against the State for payment under this Contract, other than those claims previously filed in writing on a timely basis and still disputed.

The State will only disburse payments under this Contract through Electronic Funds Transfer (EFT). Contractor must register with the State at http://www.michigan.gov/SIGMAVSS to receive electronic fund transfer payments. If Contractor does not register, the State is not liable for failure to provide payment. Without prejudice to any other right or remedy it may have, the State reserves the right to set off at any time any amount then due and owing to it by Contractor against any amount payable by the State to Contractor under this Contract.

Excluding federal government charges and terms, Contractor warrants and agrees that each of the fees, economic or product terms or warranties granted pursuant to this Contract are comparable to or better than the equivalent fees, economic or product term or warranty being offered to any commercial or government customer (including any public educational institution within the State of Michigan) of Contractor. If Contractor enters into any arrangements with another customer of Contractor to provide the products or services, available under this

U.S. and International price list or comparable document, then this Contract will be deemed amended as of the date of such other arrangements to incorporate those more favorable prices, and Contractor will immediately notify the State of such fee and formally memorialize the new pricing in a change notice.

Reserved.

Stop Work Order. The State may suspend any or all activities under the Contract at any time.

The State will provide Contractor a written stop work order detailing the suspension.

Contractor must comply with the stop work order upon receipt. Within 90 calendar days, or any longer period agreed to by Contractor, the State will either: (a) issue a notice authorizing Contractor to resume work, or (b) terminate the Contract or delivery order. The State will not its, or any additional compensation during a stop work period.

Termination for Cause. (a) The State may terminate this Contract for cause, in whole or in part, if Contractor, as determined by the State: (i) endangers the value, integrity, or security of any facility, data, or personnel; (ii) becomes insolvent, petitions for bankruptcy court proceedings, or has an involuntary bankruptcy proceeding filed against it by any creditor; (iii) engages in any conduct that may expose the State to liability; (iv) breaches any of its material duties or obligations under this Contract; or (v) fails to cure a breach within the time stated by the State in a notice of breach, if in its sole discretion the State has chosen to provide a time to cure. Any reference to specific breaches being material breaches within this Contract will not be construed to mean that other breaches are not material.

(b) If the State terminates this Contract under this Section, the State will issue a termination notice specifying whether Contractor must: (i) cease performance immediately. Contractor must submit all invoices for Contract Activities accepted by the State within 30 days of the date of termination. Failure to submit an invoice within that timeframe will constitute a waiver by Contractor for any amounts due to Contactor for Contract Activities accepted by the State under this Contract or (ii) continue to perform for a specified period. If it is later determined that Contractor was not in breach of the Contract, the termination will be deemed to have been a Termination for Convenience, effective as of the same date, and the rights and obligations of the parties will be limited to those provided in Section 25, Termination for Convenience.

The State will only pay for amounts due to Contractor for Contract Activities accepted by the ting this Contract.

Contractor must promptly reimburse to the State any fees prepaid by the State prorated to the date of such termination, including any prepaid fees. The Contractor must pay all reasonable costs incurred by the State in terminating this Contract for cause, including administrative the Contract Activities from other sources.

Termination for Convenience. The State may immediately terminate this Contract in whole or in part without penalty and for any reason or no reason, including but not limited to, appropriation or budget shortfalls. The termination notice will specify whether Contractor must:

(a) cease performance of the Contract Activities immediately. Contractor must submit all invoices for Contract Activities accepted by the State within 30 days of the date of termination.

Failure to submit an invoice within that timeframe will constitute a waiver by Contractor for any amounts due Contractor for Contract Activities accepted by the State under this Contract, or

(b) continue to perform the Contract Activities in accordance with Section 26, Transition Responsibilities. If the State terminates this Contract for convenience, the State will pay all reasonable costs, as determined by the State, for State approved Transition Responsibilities to the extent the funds are available.

Transition Responsibilities. Upon termination or expiration of this Contract for any reason, Contractor must, for a period of time specified by the State (not to exceed 90 calendar days), provide all reasonable transition assistance requested by the State, to allow for the expired or terminated portion of the Contract Activities to continue without interruption or adverse effect, and to facilitate the orderly transfer of such Contract Activities to the State or its designees.

Such transition assistance may include, but is not limited to: (a) continuing to perform the Contract Activities at the established Contract rates; (b) taking all reasonable and necessary measures to transition performance of the work, including all applicable Contract Activities, training, equipment, software, leases, reports and other documentation, to the State or the all completed or partially completed deliverables prepared under this Contract as of the Contract termination date; and (d) preparing an accurate accounting from which the State and

Transition Responsibilities nded through the end of the transition period.

Return of State Property. Upon termination or expiration of this Contract for any reason, Contractor must take all necessary and appropriate steps, or such other action as the State may direct, to preserve, maintain, protect, or return to the State all materials, data, property, and confidential information provided directly or indirectly to the Contractor by any entity, agent, vendor, or employee of the State.

Indemnification. Contractor must defend, indemnify and hold the State, its departments, divisions, agencies, offices, commissions, officers, and employees harmless, without limitation, from and against any and all actions, claims, losses, liabilities, damages, costs, attorney fees, and expenses (including those required to establish the right to indemnification), arising out of subcontractors, or by anyone else for whose acts any of them may be liable) of any of the promises, agreements, representations, warranties, or insurance requirements contained in this Contract; (b) any infringement, misappropriation, or other violation of any intellectual property right or other right of any third party; (c) any bodily injury, death, or damage to real or tangible personal property occurring wholly or in part due to action or inaction by Contractor (or e acts any employees, agents, subcontractors, or by anyone else for whose acts any of them may be liable).

The State will notify Contractor in writing if indemnification is sought; however, failure to do so will not relieve Contractor, except to the extent that Contractor is materially prejudiced.

Contractor must, to the satisfaction of the State, demonstrate its financial ability to carry out these obligations.

The State is entitled to: (i) regular updates on proceeding status; (ii) participate in the defense of the proceeding; (iii) employ its own counsel; and to (iv) retain control of the defense, at its own cost and expense, if the State deems necessary. Contr written consent (not to be unreasonably withheld), settle, compromise, or consent to the entry of any judgment in or otherwise seek to terminate any claim, action, or proceeding.

Any litigation activity on behalf of the State, or any of its subdivisions under this Section, must be coordinated with the Department of Attorney General. An attorney designated to represent the State may not do so until approved by the Michigan Attorney General and appointed as a Special Assistant Attorney General.

The State is constitutionally prohibited from indemnifying Contractor or any third parties.

Infringement Remedies commodity, or service supplied by Contractor or its subcontractors, or its operation, use or reproduction, is likely to become the subject of a copyright, patent, trademark, or trade secret infringement claim, Contractor must, at its expense: (a) procure for the State the right to continue using the equipment, software, commodity, or service, or if this option is not reasonably available to Contractor, (b) replace or modify the same so that it becomes non-infringing; or (c) accept its return by the State with appropriate credits to the State against consequence of the State ceasing its use and returning it.

AGGREGATE LIABILITY TO CONTRACTOR UNDER THIS CONTRACT, REGARDLESS

OF THE FORM OF ACTION, WHETHER IN CONTRACT, TORT, NEGLIGENCE, STRICT

LIABILITY OR BY STATUTE OR OTHERWISE, FOR ANY CLAIM RELATED TO OR

ARISING UNDER THIS CONTRACT, EXCEED THE MAXIMUM AMOUNT OF FEES

PAYABLE UNDER THIS CONTRACT. The State is not liable for consequential, incidental, indirect, or special damages, regardless of the nature of the action.

Disclosure of Litigation, or Other Proceeding. Contractor must notify the State within 14 calendar days of receiving notice of any litigation, investigation, arbitration, or other proceeding

Proceeding Contractor or subcontractor, that arises during the term of the Contract, including: (a) a criminal Proceeding; (b) a parole or probation Proceeding; (c) a Proceeding under the Sarbanes-Oxley Act; (d) a civil Proceeding involving: (1) a claim that might reasonably be administrative proceeding alleging the Contractor or its subcontractors discriminated against its employees, subcontractors, vendors, or suppliers during the term of this Contract; or (e) a Proceeding involving any license that Contractor is required to possess in order to perform under this Contract.

State Data. All data and information provided to Contractor by or on behalf of the State, and all

State Data this definition is to be construed as broadly as possible. Upon request, Contractor must provide to the State, or a third party designated by the State, all State Data within 10 calendar days of the request and in the format requested by the State. Contractor will assume all costs incurred in compiling and supplying State Data. No State Data may be used for any marketing or commercial purposes.

Reserved.

Non-Disclosure of Confidential Information. The parties acknowledge that each party may be exposed to or acquire communication or data of the other party that is confidential, privileged communication not intended to be disclosed to third parties.

a. Meaning of Confidential Information. For the purposes of this Contract, the term Confidential Information such party; (b) if disclosed orally meaning, was subsequently summarized in writing by the disclosing party and marked confidential information o not include any information or documentation that was or is: (a) subject to disclosure under the Michigan Freedom of Information Act (FOIA); (b) already in the possession of the receiving party without an obligation of confidentiality; (c) developed independently by the receiving proprietary rights; (d) obtained from a source other than the disclosing party without an obligation of confidentiality; or, (e) publicly available when received, or thereafter became publicly available (other than through any unauthorized disclosure by, through, or on behalf of, the receiving party). For purposes of this Contract, in all cases and for all matters, State Data is deemed to be Confidential Information.

b. Obligation of Confidentiality. The parties agree to hold all Confidential Information in strict confidence and not to copy, reproduce, sell, transfer, or otherwise dispose of, give or disclose such Confidential Information to third parties other than employees, agents, or subcontractors of a party who have a need to know in connection with this Contract or to use such Confidential Information for any purposes whatsoever other than the performance of this Contract. The parties agree to advise and require their respective employees, agents, and subcontractors of their obligations to keep all Confidential Information confidential.

Disclosure to a subcontractor is permissible where: (a) use of a subcontractor is authorized under this Contract; (b) the disclosure is necessary or otherwise naturally occurs in connection with work that is within the subcontractor's responsibilities; and (c) Contractor obligates the subcontractor in a written contract to maintain the State's Confidential Information in confidence. At the State's request, any employee of Contractor or any subcontractor may be required to execute a separate agreement to be bound by the provisions of this Section.

c. Cooperation to Prevent Disclosure of Confidential Information. Each party must use its best efforts to assist the other party in identifying and preventing any unauthorized use or disclosure of any Confidential Information. Without limiting the foregoing, each party must advise the other party immediately in the event either party learns or has reason to believe that any person who has had access to Confidential Information has violated or intends to violate the terms of this Contract and each party will cooperate with the other party in seeking injunctive or other equitable relief against any such person.

d. Remedies for Breach of Obligation of Confidentiality. Each party acknowledges that breach of its obligation of confidentiality may give rise to irreparable injury to the other party, which damage may be inadequately compensable in the form of monetary damages.

Accordingly, a party may seek and obtain injunctive relief against the breach or threatened breach of the foregoing undertakings, in addition to any other legal remedies which may be available, to include, in the case of the State, at the sole election of the State, the immediate termination, without liability to the State, of this Contract or any Statement of Work corresponding to the breach or threatened breach.

e. Surrender of Confidential Information upon Termination. Upon termination of this Contract or a Statement of Work, in whole or in part, each party must, within 5 calendar days from the date of termination, return to the other party any and all Confidential Information received from the other party, or created or received by a party on behalf of the other party, possession, custody, or control; provided, however, that Contractor must return State Data to the State following the timeframe and procedure described further in this Contract. Should Contractor or the State determine that the return of any Confidential Information is not feasible, such party must destroy the Confidential Information and must certify the same in writing within 5 calendar days from the date of termination to the other destroyed after the retention period expires.

Reserved.

Reserved.

Reserved.

Records Maintenance, Inspection, Examination, and Audit. Pursuant to MCL 18.1470, the State or its designee may audit Contractor to verify compliance with this Contract. Contractor must retain and provide to the State or its designee and the auditor general upon request, all records related to the Contract through the term of the Contract and for 4 years after the latter of termination, expiration, or final payment under t Audit Period the Audit Period, Contractor must retain the records until all issues are resolved.

Within 10 calendar days of providing notice, the State and its authorized representatives or designees have the right to enter and inspect Contractor's premises or any other places where Contract Activities are being performed, and examine, copy, and audit all records related to this Contract. Contractor must cooperate and provide reasonable assistance. If financial errors are revealed, the amount in error must be reflected as a credit or debit on subsequent invoices until the amount is paid or refunded. Any remaining balance at the end of the Contract must be paid or refunded within 45 calendar days.

This Section applies to Contractor, any parent, affiliate, or subsidiary organization of Contractor, and any subcontractor that performs Contract Activities in connection with this Contract.

Representations and Warranties. Contractor represents and warrants: (a) Contractor is the owner or licensee of any Contract Activities that it licenses, sells, or develops and Contractor has the rights necessary to convey title, ownership rights, or licensed use; (b) all Contract Activities are delivered free from any security interest, lien, or encumbrance and will continue in that respect; (c) the Contract Activities will not infringe the patent, trademark, copyright, trade secret, or other proprietary rights of any third party; (d) Contractor must assign or otherwise transfer to the State or its designee any manufacturer's warranty for the Contract Activities; (e) the Contract Activities are merchantable and fit for the specific purposes identified in the Contract; (f) the Contract signatory has the authority to enter into this Contract;

(g) all information furnished by Contractor in connection with the Contract fairly and accurately represents Contractor's business, properties, finances, and operations as of the dates covered by the information, and Contractor will inform the State of any material adverse changes;(h) all information furnished and representations made in connection with the award of this Contract is true, accurate, and complete, and contains no false statements or omits any fact that would make the information misleading; and that (i) Contractor is neither currently engaged in nor will engage in the boycott of a person based in or doing business with a strategic partner as described in 22 USC 8601 to 8606. A breach of this Section is considered a material breach of this Contract, which entitles the State to terminate this Contract under Section 24, Termination for Cause.

Conflicts and Ethics. Contractor will uphold high ethical standards and is prohibited from: (a) holding or acquiring an interest that would conflict with this Contract; (b) doing anything that creates an appearance of impropriety with respect to the award or performance of the

Contract; (c) attempting to influence or appearing to influence any State employee by the direct or indirect offer of anything of value; or (d) paying or agreeing to pay any person, other than employees and consultants working for Contractor, any consideration contingent upon the award of the Contract. Contractor must immediately notify the State of any violation or potential violation of these standards. This Section applies to Contractor, any parent, affiliate, or subsidiary organization of Contractor, and any subcontractor that performs Contract Activities in connection with this Contract.

Compliance with Laws. Contractor must comply with all federal, state and local laws, rules and regulations.

Reserved.

Reserved.

Nondiscrimination. Under the Elliott-Larsen Civil Rights Act, 1976 PA 453, MCL 37.2101, et seq., the Persons with Disabilities Civil Rights Act, 1976 PA 220, MCL 37.1101, et seq., and Executive Directive 2019-09. Contractor and its subcontractors agree not to discriminate against an employee or applicant for employment with respect to hire, tenure, terms, conditions, or privileges of employment, or a matter directly or indirectly related to employment, because of race, color, religion, national origin, age, sex (as defined in Executive Directive 2019-09), height, weight, marital status, partisan considerations, any mental or duties of a particular job or position. Breach of this covenant is a material breach of this Contract.

Unfair Labor Practice. Under MCL 423.324, the State may void this Contract if the name of the Contractor, or the name of a subcontractor, manufacturer, or supplier of the Contractor, subsequently appears on the Unfair Labor Practice register compiled under MCL 423.322.

Governing Law. This Contract is governed, construed, and enforced in accordance with Michigan law, excluding choice-of-law principles, and all claims relating to or arising out of this Contract are governed by Michigan law, excluding choice-of-law principles. Any dispute arising from this Contract must be resolved in the Michigan Court of Claims. Contractor waives any objections, such as lack of personal jurisdiction or forum non conveniens. Contractor must appoint an agent in Michigan to receive service of process.

Non-Exclusivity. Nothing contained in this Contract is intended nor is to be construed as creating any requirements contract with Contractor, nor does it provide Contractor with a right of first refusal for any future work. This Contract does not restrict the State or its agencies from acquiring similar, equal, or like Contract Activities from other sources.

Force Majeure. Neither party will be in breach of this Contract because of any failure arising from any disaster or acts of god that are beyond their control and without their fault or negligence. Each party will use commercially reasonable efforts to resume performance.

Contractor will not be relieved of a breach or delay caused by its subcontractors. If immediate performance is necessary to ensure public health and safety, the State may immediately contract with a third party.

Dispute Resolution. The parties will endeavor to resolve any Contract dispute in accordance with this provision. The dispute will be referred to the parties' respective Contract Administrators or Program Managers. Such referral must include a description of the issues and all supporting documentation. The parties must submit the dispute to a senior executive if unable to resolve the dispute within 15 business days. The parties will continue performing while a dispute is being resolved, unless the dispute precludes performance. A dispute involving payment does not preclude performance.

Litigation to resolve the dispute will not be instituted until after the dispute has been elevated to within 15 business days. The parties are not prohibited from instituting formal proceedings: (a) to avoid the expiration of statute of limitations period; (b) to preserve a superior position with respect to creditors; or (c) where a party makes a determination that a temporary restraining order or other injunctive relief is the only adequate remedy. This Section does not limit the

Media Releases. News releases (including promotional literature and commercial advertisements) pertaining to the Contract or project to which it relates must not be made without the prior written approval of the State, and then only in accordance with the explicit written instructions of the State.

Schedules. All Schedules and Exhibits that are referenced herein and attached hereto are hereby incorporated by reference. The following Schedules are attached hereto and incorporated herein:

Document Title Document Description

Schedule A Statement of Work

Schedule B Pricing

Schedule C Cost Factors

Schedule D Service Level Agreements

Entire Agreement and Order of Precedence. This Contract, which includes Statement of Work, and schedules and exhibits, is the entire agreement of the parties related to the Contract Activities. This Contract supersedes and replaces all previous understandings and agreements between the parties for the Contract Activities. If there is a conflict between documents, the order of precedence is: (a) first, this Contract, excluding its schedules, exhibits, and Statement of Work; (b) second, Statement of Work as of the Effective Date; and

(c) third, schedules expressly incorporated into this Contract as of the Effective Date. NO

WRAP, SHRINK-WRAP, CLICK-WRAP, CLICK-THROUGH OR OTHER NON-NEGOTIATED

TERMS AND CONDITIONS PROVIDED WITH ANY OF THE CONTRACT ACTIVITIES, OR

PURCHASE ORDER, WILL CONSTITUTE A PART OR AMENDMENT OF THIS CONTRACT

OR IS BINDING ON THE STATE OR ANY AUTHORIZED USER FOR ANY PURPOSE. ALL

SUCH OTHER TERMS AND CONDITIONS HAVE NO FORCE AND EFFECT AND ARE

DEEMED REJECTED BY THE STATE AND THE AUTHORIZED USER, EVEN IF ACCESS

TO OR USE OF THE CONTRACT ACTIVITIES REQUIRES AFFIRMATIVE ACCEPTANCE

OF SUCH TERMS AND CONDITIONS.

Severability. If any part of this Contract is held invalid or unenforceable, by any court of competent jurisdiction, that part will be deemed deleted from this Contract and the severed part will be replaced by agreed upon language that achieves the same or similar objectives.

The remaining Contract will continue in full force and effect.

Waiver. Failure to enforce any provision of this Contract will not constitute a waiver.

Survival. Any right, obligation or condition that, by its express terms or nature and context is intended to survive, will survive the termination or expiration of this Contract; such rights, obligations, or conditions include, but are not limited to, those related to transition responsibilities; indemnification; disclaimer of damages and limitations of liability; State Data;

non-disclosure of Confidential Information; representations and warranties; insurance and bankruptcy.

Contract Modification. This Contract may not be amended except by signed agreement subsequent Statement of Work or Contract Change Notice executed after the Effective Date will be construed to amend this Contract unless it specifically states its intent to do so and cites the section or sections amended.

SCHEDULE A STATEMENT OF WORK CONTRACT

ACTIVITIES

Contract No. 260000000063

Outsole Blockers for Michigan State Industries

BACKGROUND

The Michigan Department of Corrections (MDOC), Michigan State Industries (MSI), manufactures goods and provides services for sale to state agencies, and local governmental units. The outsole blockers are used in the production of prisoner and officer shoes.

REQUIREMENTS

The Contractor is solely responsible to ensure that products delivered meet the specifications and requirements of this Contract.

1. General Requirements

1.1. Product Specifications

The Contractor must provide outsole blockers for the MDOC/MSI for use in the production of shoes according to the following specifications. The Contractor will be required to provide the outsole blockers as ordered and within the time constraints required.

A. Product Specifications

1. Outsole blockers must be in the following sizes: 6,7,8,9,10,11,12,13,14,15, & 17.

2. Color must be black.

3. Outsole blockers must be pre-buffed (roughed).

4. - e -

5. Must bond to neoprene primer.

6. The product must have labels that state the country where the product was manufactured.

7. Blockers must be consistent in color, size, shape, thickness, and hardness

8. Must be free of flaws.

9.

B. Contractor Documentation

Upon request, the Contractor should supply documentation such as specification sheets that verifies the Contractors proposed product meet the specifications below:

1. Mold SMP-06

2. NBS abrasion resistance of 90 100%

3. Specific gravity: 31 +/- 2.03g/cm3.

4. Oil resistance must be 19% minimum.

5. Hardness: 66 (+/- 1) scale c

6. Tensile strength: 35 (+/- 1) KG/CM

7. Elongation: 230 maximum.

8. Tear strength: 15 minimum KG/CM

9. Ross Flex (-20C) 0 cut growth @ 7500 flexes minimum

C. The Contractor confirms their product is manufactured in Tianjin, Tianjin Province, China.

1.2. Implementation

Prior to starting production, at the request of the MDOC Program Manager, Contractor must

MDOC will examine the sample to determine if it meets the specifications. If MDOC does not approve the sample, MDOC, at its own discretion, may request additional samples for approval or cancel the contract and award to the next best value bidder.

1.3. Warranties

defects. Describe any warranties included in the bid add additional rows as needed. Explain the process for reporting warranty issues and how the Contractor will handle any repairs or replacements.

A. The Contractor is solely responsible for warranty.

B. The length of the warranty is one year. The warranty covers problems due to manufacturing defects; not due to normal wear and tear.

C. Process for reporting warranty Issues: The State should notify the Contractor immediately of any problem by telephone with a follow-up email or letter in writing. Samples of defective product may be requested to be returned to office at 425 Washington St., Claremont, NH 03743 for inspection.

D. Immediately upon confirming there is a warranty issue, a replacement shipment will be sent to the State.

E. Issues must be reported to Kevin McNamara at kmcnamara@soletech.com or Tel: 603-542- 8905.

1.4. Recall Requirements and Procedures

In the event of a recall, the Contractor must immediately notify MDOC Contract Administrator, Contract Monitor, and Program Manager by…