Attachment 1_SOW.docx
DOCX document 40 KB Posted
- Attached to
- MCRC Perforated Film
- Solicitation number
- M9549201302026
- Issued by
-
United States Marine Corps
About this file
This is a Statement of Work (SOW) for the Marine Corps Recruiting Command (MCRC) Perforated Film contract, which requires the production and installation of perforated window film graphics on storefront glass surfaces at MCRC recruiting facilities nationwide and in territories. The contractor must perform site surveys, obtain written permission from local jurisdictions and property owners, remove existing graphics, clean window surfaces, and install new perforated window film using 3M 8170-P40 4-mil opaque cast vinyl with a 60/40 visual obscurity density across approximately 694 storefront locations with an estimated 240 square feet per facility. The graphics will incorporate Marine Corps branding using specified Pantone colors (Black C, 187 Red, and 289 Blue) and must include storefront suite numbers; all printers must be G-7 calibrated for color consistency.
The contract is structured as a single-award Indefinite Delivery Requirements contract with a base year requiring approximately 300 storefronts to be completed within one year of contract award, followed by three optional years for additional installations or removals at new or closing locations as task orders are issued. The contractor must provide project status reports monthly by the third Thursday at 2:00 PM EST and attend quarterly progress meetings with the Contracting Officer Representative (COR), Michael Hounshell. Installation materials include 3M 8518 Gloss Overlaminate and 3M Edge Sealer Tape 8914, with warranties of two years (or 1.4 years in high-UV regions) covering manufacturing defects, ink performance, and installation quality. Documentation requirements include G-7 printing certification and liability insurance, with completion photographs submitted within five days of installation and any defects corrected within 30 days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 Window Graphic Example Portfolio.pdf | ||
| Attachment 1_Statement of Work.docx | DOCX document | |
| Attachment 2 MCRC Perf Film Locations.xlsx | XLSX spreadsheet | |
| Attachment 4 Rough Order of Magnitude.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MARINE CORPS RECRUITING COMMAND
STOREFRONT GLASS GRAPHICS USING
PERFORATED WINDOW FILM
1. Background This contract is in support of the United States Marine Corps Recruiting Command (MCRC) Branding Program for each of the six (6) Marine Corps Districts (MCD), which are located throughout the United States, overseas and its territories. The use of branded locations, emphasizing the approved Marine Corps colors, symbols, themes, furnishings, and lighting effects will help distinguish Marine Corps recruiting offices from recruiting offices of other Armed Services, providing a distinct recruiting advantage vis-à-vis other Services. The appearance of the branded offices leaves a positive impression not just with prospects, but their parents and other influencers as well.
MCRC is taking steps to improve physical security of recruiting facilities. MCRC intends to utilize perforated window film on the glass surfaces of storefront recruiting facilities in order to provide concealment, more specifically, protection from observation. On one hand, it is necessary to have a means of obscuring the view of Marine recruiting station from the outside as a force protection measure. On the other hand, it is also necessary that, where practical, the Marines maintain visibility of the area outside of their office in order to maintain their situational awareness. This will provide them with the possibility of early warning, if a potential aggressor is approaching the office or preparing to commit some type of hostile or unlawful act, such as vandalism, outside the office. Perforated window film will allow for MCRC Branding Program success, while providing increased security for recruiting personnel and individuals visiting recruiting offices. As a part of this requirement, the current storefront glass graphics will be removed, and new perforated window film will be installed to span the entire glass window/door surface. Perforated window film will be installed on existing facilities that have no storefront graphics. Additionally, perforated film will be replaced on existing facilities as required.
2. Objectives The objective of this contract is to provide glass storefront window/door perforated window film graphics and to replace existing perforated film to MCRC recruiting offices located throughout the United States and its territories, which shall be produced and installed by the contractor.
3. Scope The MCRC identified a need for a single award Indefinite Delivery Requirements contract for the production and installation of storefront glass window/door graphics.
The graphics shall be installed at existing MCRC Single Service Recruiting facilities with glass front windows/doors and Co-located Recruiting facilities with separate entrance glass doors at each of the six (6) MCD. The contractor shall also be required to remove all current graphics and clean the window surfaces prior to installation of new perforated window wraps. This requirement entails approximately 694 storefront locations with an estimated square footage of 240 square feet per facility. The Government will issue Task Orders for the quantities actually required. Recruiting facilities at each of the six (6) MCDs include but are not limited to Recruiting Stations (RSs), Recruiting Substations (RSSs), Officer Selection Offices (OSOs), and Permanent Contact Stations (PCSs). This requirement shall also incorporate any new recruiting facilities that are identified during the period of performance of this contract. The guidance and specifications for the graphics will be based on the aforementioned guidelines attached to this Statement of Work (SOW).
4. Applicable Documents
Attachment 1: Scalable Graphic and Guidebook
Attachment 2: Locations spreadsheet to include Facility Identification Numbers
5. Requirements Points of Contact
5.1 Contracting Officer Representative (COR):
| Michael Hounshell |
| Logistics Operations Officer, MCRC |
3280 Russell Road (2nd Floor) MCB, Quantico VA 22134 703-784-9456 michael.hounshell@marines.usmc.mil
5.2 Recruiting District Representatives: The Deputy Logistics Officers at each district will serve as a Recruiting District Representative and will be the technical point of contact for each district.
5.3 Contractor Point of Contact: The contractor shall establish a single management focal point of contact to accomplish the administrative, managerial, warranty, and financial aspects of this contract, and this person will serve as the primary interface with the COR, Recruiting District Representatives, and the Contracting Office.
6. Tasks The tasks for this requirement shall include the following:
6.1. The contractor shall coordinate with local jurisdictions and property owners/managers for permission to install the storefront glass graphics using perforated window film on each of the Marine Corps recruiting facilities. Permission for jurisdiction and property owner/manager will be in writing and sent out as a formal letter prior to beginning printing and installation of the perforated window film as prescribed per task order. All program management for sending out the permission letters and coordinating approvals shall be performed and documented by the contractor. Signed permission documents by the jurisdiction and property owner/manager shall be sent to the COR at the time of the submission of the proof for inclusion in the contract file for future reference. The contractor shall also provide to the COR an updated spreadsheet monthly of the POC for whom they sent the letters to and the date the signed document was received. If approval is not met, then the contractor cannot proceed.
6.2. The contractor shall conduct a site survey of each location and measure all glass areas that will have graphics installed. Measuring the exterior windows and doors, in addition to taking a digital photograph will be required. Any situations where a window is partially shared with the neighboring service need to be notated and solution shall be achieved by working with the Recruiting District Representatives and COR. The photographs taken will determine if there are any obstructions on the glass windows and doors. The design and placement of the storefront suite numbers shall be documented and used later for developing the proof.
6.2.1. Documentation of the site survey, a photo of the facility, and a virtual proof of each location will need to be provided through email or digital coordination to the Recruiting District Representatives and COR for approval. The proof shall demonstrate the placement of the graphics in accordance with the graphic guidebook and the placement of the storefront suite numbers. If there are any shared windows, the proof shall indicate the placement of the perforated film on a certain portion of the window as agreed upon in writing between the contractor and the Recruiting District Representatives and COR. After the proof is approved and an installation date is set through communication with the Recruiting District Representatives, the contractor may proceed with the printing and installation.
6.2.2. Prior to beginning work on the first printing and installation of the first delivery order, the contractor shall provide a small hard copy proof to be sent to the COR to demonstrate color match to the colors specified: Black: Pantone Black C, Red: Pantone 187 Red, and Blue: Pantone 289 Blue.
6.3. The contractor shall provide all facilities and materials required to produce the perforated window film to be installed on all of the storefront glass windows and doors.
6.4. Production of the perforated window film shall use 3M 8170-P40 4-mil or equal, opaque, cast vinyl film with a high gloss finish. Window Graphic Film will have a visual obscurity density of 60/40. The perforated film shall be laminated prior to installation with 3M 8518 Gloss Overlaminate or equal in order to protect the window film from UV rays and debris build up between the perforations. 3M Edge Sealer Tape 8914 or equal shall be applied at the time of installation to all edges of the perforated window film to help seal the film from the environment and prevent peeling. Storefront suite/office numbers shall be included in the perforated window film
6.4.1. The provided graphic will be scalable, and it shall be printed and applied to span the entire glass, if possible. The guidebook provided shall be followed. Any questions regarding guidebook use shall be addressed through the COR. All printers need to be G-7 calibrated to ensure continuity of printed colors.
6.5. Each facility storefront glass windows/doors contain fragmentation films. The fragmentation film is placed on the inside of the glass windows/doors. To avoid damaging the integrity of installed fragmentation film, application of the perforated window film shall be installed on the outside of the glass windows/doors and not over the top of the fragmentation film.
6.6. Installation of the perforated window film will begin with the removal of all of the current storefront vinyl graphics. Once the window surface is clear of all old window graphics, the glass surface shall be thoroughly cleaned prior to installation of the window film. The perforated window film with overlaminate, as specified in 6.4, will be installed to match the approved proof. Edge sealer is to be applied to any edges where the glass meets the window/door frame, or where the film is cut due to partial window covering in instances of shared windows. The installed film shall be free of any bubbles or tears. As specified per task order, for any Recruiting Facility that is moving to a new location, the contractor will remove all graphics (to include both vinyl and/or perforated film) at the current facility and install the storefront graphics as perforated window film at the new storefront location as directed per task order. As specified per task order, for any Recruiting Facility that is closing and not relocating, the contractor will remove all graphics (to include both vinyl and/or perforated film) as directed per task order.
6.6.1. Upon completion of the installation, a picture of the facility shall be taken and sent to the COR and the Recruiting District Representatives within 5 days of the installation for approval. Any defects with the installation shall be corrected by the contractor within 30 days of the installation date.
6.7. The perforated window film shall have a 2 year, 3M MCS Warranty or equal, with the exception of the following locations that shall receive a 3M MCS Warranty or equal of 1.4 years from the date of installation due to their geographic location in correlation with UV rays received: Arizona, New Mexico, Nevada’s southern counties, Utah’s southern counties, California’s southern counties, and Texas’ western counties. The warranty shall cover any physical defects in the 3M product, manufacturing defects and ink performance issues, printing defects, cutting defects, graphic appearance, and removal issues, etc.
6.8. Documentation of the 3M MCS Warranty or equal, G-7 printing, liability insurance shall be provided as a part of the offeror’s submission package, and available if requested during the life of the contract.
7. Government-Furnished Property (GFP)
The Government will provide a copy of the scalable graphic and guidebook (Attachment 1) and a spreadsheet identifying each recruiting facility address and their corresponding Facility Identification Number (Attachment 2) for tracking purposes.
8. Reports
8.1 Project Status Report. The contractor shall provide information regarding work performed during the reporting period such as progress of the work and the status of the project, such as project descriptions, work completed since last report, next steps, and delivery schedule. This report shall be provided to the COR on the third Thursday of each month by 2:00pm EST. In the event where the third Thursday falls on a federal holiday, the reports shall be due on the next business day.
9. Meetings
9.1 Progress Meetings. The contractor shall meet with the COR on a quarterly basis to discuss any issues, concerns, or other important information pertaining to the contract. The COR may also schedule additional meetings aside from the quarterly meetings as determined necessary, a teleconference will suffice.
10. Place of Performance The contractor shall provide all facilities necessary to manufacture and produce storefront graphics using perforated window film. The contractor shall also be required to travel to each recruiting facility throughout the United States and its territories to remove existing vinyl graphics and install perforated graphics. As stated in Section 7 of the SOW, a spreadsheet will be provided detailing the addresses of each of the recruiting locations of the six (6) MCDs.
11. Period of Performance
11.1 Commencement. The contractor shall commence performance of the work on the contract immediately upon receipt of the first task order. Commencement of task orders will vary task order to task order.
11.2 The initial phase of installations to include an estimated 300 storefronts will need to be completed within one year from contract award. Task orders will be issued as the need arises for installation on new sites after the initial phase.
11.3 Three option years with will be included in the contract that may be exercised if the need exists for removal and/or installation at locations past the initial base year.
File details come from the government source that posted it. Updated .