Attachment 1 - Dive Support Services PWS - Amended 0001.pdf

PDF 519 KB Posted

Attached to
AVTB Dive Support Services - Solicitation Federal contract opportunity
Solicitation number
M68909-23-Q-7909
Issued by
United States Marine Corps

About this file

This performance work statement outlines scuba diving services required by the United States Marine Corps Amphibious Vehicle Test Branch. Key requirements include providing an OSHA-compliant four-person dive team, emergency dive support in the event of a sunken vehicle up to 90 feet in depth, underwater cutting and welding equipment, hull cleaning and inspection services, inspection and maintenance of a wave data buoy, and training for government personnel. The contractor must furnish all necessary personnel, equipment, tools, materials and quality control to perform these services at the AVTB facility in Camp Pendleton, California for a base period of four months with four additional one-year option periods. The solicitation number for this opportunity is M68909-23-Q-7909.

View the file

Other files for this federal contract opportunity

Other files attached to AVTB Dive Support Services - Solicitation, newest first.
File Type Posted
Dive Services RFQ M68909-23-Q-7909-0001.pdf PDF
Attachment 3 - Pricing Worksheets - Amended 0001.xlsx XLSX spreadsheet
Attachment 3 - Pricing Worksheets.xlsx XLSX spreadsheet
Exhibit A - CDRLs.pdf PDF
Attachment 1 - Dive Support Services PWS.pdf PDF
Attachment 2- Wage Determination.pdf PDF
Dive Services RFQ - M68909-23-Q-7909.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement for the

Amphibious Vehicle Test Branch (AVTB) Scuba Diving Services

22 June 2023

Prepared by:

UNITED STATES MARINE CORPS

Amphibious Vehicle Test Branch Camp Pendleton, CA 92055-5171

AVTB Scuba Diving Services v8 ii

TABLE OF CONTENTS

1 INTRODUCTION

1.1 Background

1.2 Scope

2 APPLICABLE DOCUMENTS

2.1 Compliance Documents

3 REQUIREMENTS

3.1 General Requirements

3.1.1 Contract Data Requirements List (CDRL) Item Deliverables

3.1.2 Quality Control Plan (QCP)

3.1.3 Non-Personal Services

3.1.4 Business Relations

3.1.5 Contractor Personnel, Disciplines, and Specialties

3.1.6 Resource Requirements

3.1.6.1 Marine Corps Enterprise Network (MCEN) and Telephone Services

3.1.6.2 Common Access Card (CAC)

3.1.7 Security Requirements

3.1.7.1 Eligibility for Access to Classified Information

3.1.7.2 Qualified U.S. Contractors

3.1.7.3 Contractor Support Public Trust Determinations

3.1.7.4 Base Security

3.1.7.5 Site Security

3.1.7.6 Defense Biometric Identification System (DBIDS)

3.1.7.7 Operations Security (OPSEC) Requirements

3.1.7.8 MCTSSA/AVTB Check-Out Procedures

3.1.8 Safety – Accidents and Mishaps

3.1.9 Locations and Hours of Work

3.1.9.1 Overtime Capability

3.1.10 Dress and Conduct

3.1.11 Travel

3.1.12 Privacy Act Information

3.1.13 Program Management

3.1.13.1 Contract Management Plan

3.1.13.2 Monthly Status Report (MSR)

3.1.13.3 Mobilization/Phase-Out Period

3.1.13.3.1 Mobilization

3.1.13.3.2 Phase-Out

3.1.13.4 Identification of Contractor Personnel

3.1.13.5 Post Award Conference (PAC)

3.1.13.6 Technical Documentation

3.1.13.7 Data

3.1.13.7.1 Data Rights

3.1.13.7.2 Data Management

3.1.13.7.3 Distribution Statement

3.1.14 Government Property

3.1.15 Government-Furnished Information (GFI)

iii

3.1.16 Invoicing

3.1.17 Administrative Authority

3.1.17.1 Contracting Officer

3.1.17.2 Contracting Officer’s Representative (COR)

3.1.18 Hull Cleaning Program Training Log

3.1.19 Dive Plan

3.2 Specific Requirements

3.2.1 Dive Support Services

3.3 Other Requirements

3.3.1 Emergency Rescue

3.3.1.1 Deep Dive Procedures (29 CFR 1910.425(b))

3.3.1.2 Surface Supplied Air Diving Procedures (CFR 1910.425)

3.3.2 Underwater Cutting Equipment

3.3.2.1 Welding and Burning Procedures (29 CFR 1910.422(g))

3.3.3 Hull Cleaning and Inspection

3.3.3.1 Utilizing the Best Management Practices (BMP) Method

3.3.3.2 Hull Cleaning Guidelines

3.3.4 Wave Buoy Inspection and Cable Replacement

3.3.5 Training

3.3.6 Dive Support Equipment

3.3.6.1 Dive Support Equipment(29 CFR 1910.430)

3.3.6.2 Equipment Inspection in accordance with (29 CFR 1910.421(g))

3.3.6.2.1 Annual Inventory

3.3.6.2.2 Survival Egress Bottle Device (SEBD) Bottles

3.3.6.2.3 Warranty Items

4 ORGANIZATIONAL CONFLICT OF INTEREST

APPENDIX A – ACRONYMS ................................................................................................. A-1 APPENDIX B – CDRL SUMMARY ........................................................................................ B-1 APPENDIX C – PERFORMANCE REQUIREMENTS SUMMARY ..................................... C-1

1 INTRODUCTION

This Performance Work Statement (PWS) describes the Amphibious Vehicle Test Branch (AVTB) scuba diving services. The base period of performance for the Dive Support Services will be 4 months in duration from 5 August to 30 November 2023. There will be four 12-month option periods: Option year 1 (1 December 2023 through 30 November 2024), option year 2 (1 December 2024 through 30 November 2025), option year 3 (1 December 2025 through 30 November 2026), and option year 4 (1 December 2026 through 30 November 2027).

1.1 Background

The United States Marine Corps (USMC) AVTB is a Department of Defense (DoD) sponsored test facility that provides year-round Test and Evaluation (T&E) of amphibious vehicles, ground combat vehicles, systems, and equipment for the Marine Corps Systems Command (MCSC) and Program Executive Officer Land Systems (PEO LS). AVTB is the responsible test organization under Marine Corps Tactical Systems Support Activity (MCTSSA) for T&E throughout the life cycle of the vehicle platform. Due to the high-risk nature of the AVTB mission, emergency diving support services are required during all amphibious vehicle test events.

1.2 Scope

The Contractor shall provide personnel to perform the scuba diving services.

The support includes:

• Dive tending training, instruction on dive equipment, and underwater-related rescue tools to the AVTB staff and contractors as it relates to associated jobs or duties to assist with dive operations.

• Corrosion prevention and control of all scuba and other dive related GFE items that assists in the location and extraction of personnel in a sinking or submerged amphibious vehicle, boat, or test article.

• Inventory control, warranty, and configuration management of all scuba and other dive related GFE items that assists in the location and extraction of personnel in a sinking or submerged amphibious vehicle, boat, or test article (e.g., dive locker setup with record jackets on all GFE items). The scope of dive support includes, but is not limited to:

o Ensure testing is executed in a safe environment. AVTB determined there is a requirement to have an Occupational Safety and Health Administration (OSHA) compliant, surface-supplied dive team on-site during open ocean operations. A diver shall also be able to operate underwater with 0-to-10-foot visibility, in heavy fog and light rain conditions, medium to high rolling seas, and in hours of darkness.

o The divers shall perform underwater inspection of vehicles or rescue of personnel from submerged test vehicles, as needed.

o The Contractor shall supply a dive team to support the wide range of technical and safety responsibilities when used to support the AVTB test platforms for testing future technology and sustainment training.

o Hull cleaning and inspection of AVTB watercraft, to include running gear, intakes, hull appendages, and appurtenances. Also, ensure tightness of anode hardware and replace any corroded or eroded anodes that are less than 75% effective. Props should be maintained at a high level including inspecting bearing clearances, shaft and strut seals, and blade faces and roots for signs of cavitation.

The requirement for this PWS includes:

• Dive support services (section 3.2.1)

2 APPLICABLE DOCUMENTS

2.1 Compliance Documents

The current versions of the following documents shall be used when performing the work described in this PWS:

• The OSHA Commercial Diving Operations Department of Defense Interface Standard, 29 Code of Federal Regulations (CFR) 1910, Subparts F, G, N, Q, and T, is applicable to this PWS to the extent specified herein. The Government shall provide the Contractor with the applicable version.

3 REQUIREMENTS

3.1 General Requirements

3.1.1 Contract Data Requirements List (CDRL) Item Deliverables The CDRL items shall be delivered to the Government in the current AVTB template format consistent with the Data Item Description (DID) and all the other requirements identified in the respective CDRL DD Form 1423. A draft deliverable is due by the date established by the Government in this PWS.

3.1.2 Quality Control Plan (QCP)

The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services, such as a service output that does not meet the standard of performance associated with this PWS.

The contractor’s QCP shall be defined and described in the contractor’s management plan to support the requirements of this PWS, per section 3.1.13.1. The final deliverable is due 5 working days after receipt of government comments on the initial submission unless a different schedule is agreed to by the Government and the Contractor.

• CDRL B001 – DI‐MISC‐80508B, Management and Technical Plan

3.1.3 Non-Personal Services

The Government shall neither supervise nor control the method by which contractor personnel perform the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor personnel. It shall be the responsibility of the Contractor to manage its personnel and to guard against any actions that are of the nature of personal services, or which give the perception of personal services. If the Contractor believes that any actions constitute, or are perceived to constitute, personal services, it shall be the Contractor’s responsibility to notify the Procuring Contracting Officer (PCO) immediately.

3.1.4 Business Relations

The Contractor shall successfully integrate and coordinate all activities needed to execute the requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The Contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.

3.1.5 Contractor Personnel, Disciplines, and Specialties

The Contractor shall satisfy the requirements of this PWS by employing and utilizing personnel with an appropriate combination of education, knowledge, skills, abilities, and experience. The Contractor shall utilize appropriate labor categories and labor hours to perform all the work or tasks identified in this contract. The Contractor shall not employ government personnel (military or civilian) for performance of any work described in this PWS.

3.1.6 Resource Requirements

The Contractor shall provide all personnel, tools, materials, supervision, and quality control necessary to meet the AVTB support services requirements defined by this PWS. Personnel training, certifications, and qualifications specified in this PWS shall be provided for by the Contractor, except for the training listed in section 3.1.15.

3.1.6.1 Marine Corps Enterprise Network (MCEN) and Telephone Services Contractor personnel accessing MCSC information systems must maintain compliance with USMC Enterprise Cybersecurity Manual 007 Resource Access Guide. Contractor personnel will submit a DD 2875 and a completion certificate for the CYBERC course located on MarineNet at https://www.marinenet.usmc.mil. The CYBERC course consists of the DoD Cyber Awareness Challenge and the Department of the Navy Annual Privacy Training (PII). Contractors will have to create a MarineNet account to complete the required training.

MCEN Information Technology (IT) resources, if provided, are designated Controlled Unclassified Information (CUI) and other limited authorized purposes. DoD military, civilian, consultants, and contractor personnel performing duties on MCEN information systems may be assigned to one of three position sensitivity designations.

1. ADP-I (IT-1): Favorably adjudicated T-5, T5R, (formerly known as Single Scope Background Investigation (SSBI)/SSBI Periodic Reinvestigation (SBPR)/SSBI Phased Periodic Reinvestigation (PPR)).

2. ADP-II (IT-2): Favorably adjudicated T-3, T3R, (formerly known as Access National Agency Check and Inquiries (ANACI)/National Agency Check with Law and Credit (NACLC)/Secret Periodic Review (S-PR)).

3. ADP-III (IT-3): Completed T-1, (formerly known as National Agency Check with Inquiries (NACI)).

All privileged users (IT-1) must undergo a T-1 investigation regardless of the security clearance level required for the position. Privileged users must maintain the baseline Cyberspace Workforce Information Assurance Technical (IAT) or Information System Security Manager (ISSM) relating to the position being filled. Privileged users are defined as anyone who has privileges over a standard user account, such as system administrators, developers, network administrators, code signing specialists, and Service Desk technicians.

All MCEN users must read, understand, and comply with policy and guidance to protect classified national security information, CUI, and prevent unauthorized disclosures in accordance with USMC Enterprise Cybersecurity Manual 007 Resource Access Guide and the Chairman of the Joint Chiefs of Staff Instruction (CJCSI) 6510.01F.

MCEN IT resources are provided for official government use only and other limited authorized purposes. Authorized purposes may include personal use within limitations as defined by the supervisor or the local command. Auto forwarding of e-mail from MCEN Non-classified Internet Protocol Router Network (NIPRNet) (MCEN-N) to commercial or private domains (e.g., Hotmail, Yahoo, Gmail) is strictly prohibited. E-mail messages requiring either message integrity or non-repudiation are digitally signed using DoD Public Key Infrastructure (PKI). All e-mail containing CUI, an attachment, or embedded active content must be digitally signed.

MCEN users will follow specific guidelines to safeguard CUI, which includes Personally Identifiable Information (PII) and Health Insurance Portability and Accountability Act (HIPAA) information. Non-official e-mail is not authorized for and will not be used to transmit any CUI.

Non-official e-mail is not authorized for official use unless under specific situations where it is the only means for communication available to meet operational requirements. This can occur when the official MCEN provided e-mail is not available but must be approved prior to use by the Marine Corps Authorizing Official (AO).

All personnel will use DoD authorized PKI certificates to encrypt e-mail messages if they contain any of the following:

1. Information that is categorized as CUI.

2. Any contract sensitive information that normally would not be disclosed to anyone other than the intended recipient.

3. Any privacy data, PII, or information that is intended for inclusion in an employee’s personal file or any information that would fall under the tenets of Message Identifier (MSGID): DOC/5 USC 552A. Personal or commercial e-mail accounts are not authorized to transmit unencrypted CUI or PII.

4. Any medical or health data, to include medical status or diagnosis concerning another individual.

5. Any operational data regarding status, readiness, location, or deployment of forces or equipment.

3.1.6.2 Common Access Card (CAC)

The Contracting Officer’s Representative (COR) will identify and only approve those contractor employees performing on this contract that require a CAC to perform their job function. In accordance with Headquarters, USMC-issued guidance relative to Homeland Security Presidential Directive – 12 (HSPD-12), all personnel must meet eligibility criteria to be issued a CAC. To meet the eligibility criteria, contractor employees requiring a CAC must obtain and maintain a favorably adjudicated Personnel Security Investigation (PSI). Prior to authorizing a CAC, the employee’s Defense Information System for Security (DISS) record must indicate a completed and favorably adjudicated PSI or, at a minimum, that a PSI has been submitted and accepted (opened). The minimum acceptable investigation is a T-1 or an NACI. If a contractor employee’s open investigation closes and is not favorably adjudicated, the CAC must be retrieved immediately and revoked. CACs are not issued for convenience.

Facility Security Officers (FSOs) are responsible for notifying the MCTSSA S-2, Personnel Security (PERSEC) Office at 760-725-1672 if any contractor performing on this contract receives an unfavorable adjudication after being issued a CAC. The FSOs must also immediately notify the PERSEC Office of any adverse/derogatory information associated with the 13 Adjudicative Guidelines concerning any contractor issued a CAC, regardless of whether a DISS Incident Report is submitted.

Each CAC is issued with a ctr@usmc.mil e-mail account that the individual contractor is responsible to maintain as active by logging in on a regular basis (at least twice a month), sending an e-mail, and clearing any unneeded e-mails. Contractors issued a CAC are prohibited from auto-forwarding e-mail from a .mil e-mail account to a .com e-mail account. If the ctr@usmc.mil e-mail account is not kept active, G-6 will deactivate the account and the CAC will also lose its functionality.

Contractor employees shall solely use their government furnished ctr@usmc.mil e-mail accounts for work supporting the USMC, conducted in fulfillment of this contract, and shall not use a contractor supplied or personal e-mail account to conduct official U.S. Government business.

The use of a contractor or personal e-mail account for contractor business or personal use is allowed, but only when using cellular or a commercial internet service provider. If a contractor loses their eligibility for a CAC due to an adverse adjudicative decision, they have also lost their eligibility to perform on MCSC contracts.

3.1.7 Security Requirements

The information provided to the Contractor will be unclassified and/or CUI. Certain Contractors will be required to perform IT-I/II duties that require favorably adjudicated Tier 5/3 Level investigations. The Defense Counterintelligence and Security Agency (DCSA) will not authorize Contractors to submit the necessary Tier Level investigations, solely in support of IT level designation requirements, without a valid classified requirement as specified in a DD-254.

This effort does not warrant a DD-254; therefore, the Government Contracting Activity Security Office (GCASO) is required to submit any required investigations in support of IT level designations. However, the contractor FSO is required to establish, populate, and own the DISS record of every contractor processed for and/or issued a CAC or submitted for IT level duties.

The Contractor is required to provide a roster of prospective contractor employees performing IT Level II and/or IT Level I duties to the MCSC COR. This roster shall include full names, social security numbers, IT Level required, e-mail address, and phone number for each contractor requiring investigations in support of IT Level designations. The COR will verify the IT Level requirements and forward the roster to the GCASO. Contractors found to be lacking required investigations will be contacted by the GCASO.

In accordance with DoD Instruction (DoDI) 5200.48 – DoD Controlled Unclassified Information (CUI), all contractors supporting MCSC who receive, store, or generate CUI are required to take the DoD mandatory CUI training, available on the Security Awareness Hub at:

https://securityawareness.usalearning.gov/cui/index.html. Per DoDI 5200.48 and pursuant to contractual requirements, DoD contractors require initial CUI training and annual CUI refresher training. Additional MCSC specific CUI training and guidance can be attained by contacting the MCSC AC/S G-2 at (703) 432-3141/3140 or MCSC_ACSG2_SCMO@usmc.mil.

3.1.7.1 Eligibility for Access to Classified Information

This contract may require the Contractors to have a security clearance. The information provided to the Contractor will be unclassified and/or CUI.

3.1.7.2 Qualified U.S. Contractors

The Contractor shall certify in writing to the Government that personnel supporting this contract are qualified U.S. Contractors, per DoD 5220.22‐M, Chapter 2, Section 2. Qualified U.S.

Contractors are U.S. citizens and persons admitted lawfully into the United States for permanent residence and are located in the United States. All personnel identified on the certification or supporting this contract, or both, shall be in compliance with the DoD, Department of the Navy (DON), and the Marine Corps Information and Personnel Security Policy to include completed background investigations (as required) prior to start.

3.1.7.3 Contractor Support Public Trust Determinations

Per MCSC Policy Letter 1-09, all contractor personnel that require a CAC must submit a Standard Form 85P – Questionnaire for Public Trust Positions, and two copies of DD Form 258

– Applicant Fingerprint Card, to the command’s Security Program office along with a personnel roster of submissions and an addressed Federal Express container addressed to Office of Personnel Management (OPM), 1137 Branchton Road, Box 618, Boyers, PA 16018.

The Contractor is responsible for determining when adjudications have been entered by reviewing the notification status of the respective personnel. After verification, the Contractor may request a CAC using the Trusted Associate Security Service (TASS). If issues are discovered, the DCSA will place a “No Determination Made” in DISS and forward the investigation to the submitting office for government adjudication.

3.1.7.4 Base Security

The Contractor shall comply with Marine Corps Base (MCB) Camp Pendleton security regulations and policies. The Contractor’s staff shall be U.S. or naturalized citizens, whose military duty (if applicable) was not terminated by a dishonorable or bad conduct discharge, are not subject to an outstanding criminal warrant, have no felony convictions, and have no more than three criminal misdemeanor convictions within the last 7 years. Additionally, the Contractor shall not have any criminal misdemeanor or felony convictions for crimes of a sexual nature, crimes of violence, crimes related to gang activity or hate crimes, or crimes resulting from the possession or distribution of illegal drugs.

Contractor personnel aboard MCB Camp Pendleton, except for emergency personnel, shall wear a properly issued badge at all times. Contractor personnel shall comply with all emergency rules and procedures established for MCB Camp Pendleton. All personnel aboard MCB Camp Pendleton are subject to random inspections of their vehicles, personal items, and themselves.

Consent to these inspections is given when personnel enter MCB Camp Pendleton.

3.1.7.5 Site Security

In addition to base security requirements (section 3.1.7.4), the Contractor shall comply with site security regulations and policies. Contractor personnel shall wear a properly issued MCTSSA badge at all times. The Contractor shall comply with Secretary of the Navy Manual (SECNAV M) M‐5510.30, June 2006, DON Personnel Security Program (Chapter 11 Visitor Access to Classified Information) and Federal Acquisition Regulation (FAR) 52.204‐2 for access to USMC bases and information. All visit requests shall be provided via the DISS system at least 5 working days prior to scheduled visits. Individuals shall have two forms of picture identification.

3.1.7.6 Defense Biometric Identification System (DBIDS)

MCB Camp Pendleton uses DBIDS for base access. The Contractor will need to call 760-763- 7604 for information or go to the Las Pulgas gate to enroll. Failure to participate in the program will restrict access to the base and may not be used as a reason for late or nonperformance of services. All Contractors and their personnel are required by MCB Camp Pendleton regulations to meet the requirement for installation access, pass a background check, and have their identity verified to receive unescorted access. No foreign nationals shall be permitted on MCB Camp Pendleton under this contract.

3.1.7.7 Operations Security (OPSEC) Requirements

During this contract, in addition to those restrictions, instructions, and guidelines delineated in the contract PWS, CDRL summary, and/or other references provided, the Contractor will adhere to the following minimum requirements in support of the AVTB OPSEC program:

6. Introduction of personnel electronic devices into government spaces (e.g., laptops, tablets, personal computers, cellular phones, cameras, recording devices) is STRICTLY controlled and forbidden in most cases. Company issued equipment required for the performance of work must be approved by AVTB and/or a Government Security Officer.

Photography and recording are not allowed except for official use and by permit only

(unless otherwise stipulated in the contract, contact the Installation Security Officer for approval). Photographs will be reviewed by Security to ensure sensitive and/or classified information is not revealed.

7. Contractor personnel shall not discuss government operations in public or over unprotected or unencrypted communications. Official business, or CUI may only be transmitted as directed in this PWS.

8. The Contractor shall not post to company websites, publications, newsletters, or other media any images, data, or information that reveal sensitive government operations, personnel, equipment, and/or classified or CUI, refer to paragraph (4) below. When in doubt, company press releases related to this contract should be coordinated through the COR or technical point of contact (POC), as applicable.

9. Because observation of events, operations, physical changes, etc. may reveal National Security Information, specific restrictions are needed to preclude unintentional release of this information to unauthorized parties (unauthorized disclosure and transfer of National Security Information is punishable under 18 USC § 793). Therefore, contractor personnel shall not disclose to unauthorized third parties, post to unofficial sites (including social networking sites) any images, data, information, or observed events that reveal sensitive government operations, personnel, equipment, including, but not limited to:

Tactics, techniques, and procedures (TTPs), production or work schedules, any visible or concealed modifications, upgrades, additions to vessels, aircraft, or weapons or equipment; increases, change, or decreases in work/deployment frequency or Government personnel, vehicle, vessel or aircraft movements; specialized equipment orders, deliveries, shipments, etc. Unauthorized disclosures and attempts to solicit this type of information by unauthorized third parties or others not affiliated with this contract shall be reported to AVTB and/or installation Security Office, contract point of contact, and your company FSO and/or the Defense Security Service. Non-Disclosure requirements remain in effect during the duration of this contract and indefinitely thereafter.

10. Government issued badges or identification shall be removed and/or concealed from plain sight when off station and shall not be left in vehicles or unprotected. Badges and passes may not be duplicated or copied or loaned to others. Lost or stolen identification badges, vehicle passes etc. will be immediately reported to AVTB and/or the installation Security Office.

11. Practice OPSEC and implement countermeasures to protect Critical Information (CI) and other sensitive unclassified information and execution of military operations performed or supported by the Contractor in support of the mission. Protection of CI will include the adherence to and execution of countermeasures which the Contractor initiates or as provided by AVTB, for CI on or related to this PWS.

12. It is strongly recommended the Contractor mark and protect related internal production schedules, deliverables, inventories, and shortages and identified vulnerabilities related to production of government material. Internal company markings (e.g., Business Sensitive) are appropriate for identifying the aforementioned as sensitive information.

Specific government-provided information, drawings etc., will be protected in accordance with guidance in applicable paragraphs of this PWS and clauses included in the solicitation/contract.

All government information must be destroyed at contract termination or returned to the Government at the Government’s discretion.

3.1.7.8 MCTSSA/AVTB Check-Out Procedures

Upon termination of the contract or contractor personnel no longer performing work under this PWS, contractor personnel must first check out with the MCTSSA Communications Security (COMSEC) Custodian and Personnel Security Managers, before turning the government-issued CAC and MCTSSA badge into the COR.

3.1.8 Safety – Accidents and Mishaps

The Contractor shall comply with all applicable requirements that are established by OSHA and all applicable installation safety orders and procedures. Accidents and mishaps that involve government property, government personnel, or contractor personnel will be reported to the Government within 24‐hours (8‐hours or less for a Class A mishap). AVTB is required to submit an Operations Event/Incident Report (OPREP‐3), or UNIT Situation Report (SITREP) report and the Contractor is responsible for OSHA notification. Damage to government property, or injury to Government or Contractor employees must be reported to the COR and Contracting Officer within 4 hours. The Contractor’s initial reports may be verbal but shall be followed up in writing within 24 hours. Contractor reports of incidents with security implications shall include full details of the incident, any remedial actions taken by the Contractor, and shall comply with all applicable security instructions.

The Contractor shall investigate all accidents occurring on Government property involving Contractor employees and report the findings (on applicable forms) to the COR and Contracting Officer within 3 calendar days of the incident. Reportable incidents shall be reported to the Government by the Contractor, per the requirements of this PWS via submission of CDRL B002

– Accident Mishap Report. The data deliverables shall be generated and delivered to the Government for reportable events in accordance with the specific performance requirements and DD Form 1423 that accompanies each individual order for services issued against this contract.

The Government (AVTB Range Safety Officer (RSO)) will provide medical support personnel and treatment.

• CDRL B002 – DI‐MISC‐82188, Accident Mishap Report

3.1.9 Locations and Hours of Work

Work will be performed primarily at AVTB, Camp Pendleton. Contractor personnel shall be expected to work at AVTB, Camp Pendleton when not on travel. All contractor personnel shall be capable of embarking military tactical and combat vehicles, U.S. Navy shipping (Jacob’s ladder), and any AVTB/government-owned vessel or watercraft facilitating a conduct of a test.

Contractor personnel may be requested to travel in the Continental United States (CONUS) to support this PWS. Standard work hours are 0700-1530, Monday through Friday, excluding federal government holidays. Nonstandard work hours are 1530-2359. Depending on the test schedule, work hours can be extended to Saturday and Sunday, as determined by the COR.

All planned absences or changes to the schedule require prior approval by the Government. It is the responsibility of contractor personnel to inform the Government if they will not be present, if there is a change to the schedule, or when working from an alternate location. Any unplanned absences (i.e. family emergencies, injuries, sick calls) will be addressed by the contractor in a timely manner to try and fill the position. Any unplanned absences will be informed to the government by the contractor.

3.1.9.1 Overtime Capability

The Contractor shall work overtime under this contract as authorized by the COR who shall validate the requirement for overtime and then, will submit the request to the Contracting Officer for concurrence, or non-concurrence. The Contractor shall be compensated for all COR and Contracting Officer approved overtime costs. Overtime hours shall be paid to the Contractor’s employees in accordance with local, state, federal laws and regulations, and in accordance to the agreed upon contract. The COR shall provide the Contractor with written approval for overtime prior to the start of any overtime work requested by the Government. The approval will include the project name, location, and the number of overtime hours approved. The Contractor will notify the Government when 70% of the authorized overtime hours have been expended to determine if additional overtime hours are needed for that requirement. If additional hours are required and approved, the Contracting Officer will again provide written approval to the Contractor for additional overtime hours. This process will be followed throughout the phase of work requiring overtime until the Government determines that overtime hours are no longer required to complete the task.

3.1.10 Dress and Conduct

Contractor personnel shall dress in a manner consistent with the task for which hired and the work being performed. In most cases, business casual is appropriate. Clothing must not be excessively revealing, worn out, or ill‐fitting. Contractor personnel shall, at all times, present a professional demeanor while performing on this contract. Behavior that is disruptive, unsafe, disrespectful, offensive, or detrimental to morale shall not be tolerated. The Contractor shall ensure that its personnel do not allow personal business to interfere with job performance, nor use government resources for personal business.

3.1.11 Travel

CONUS/ OCONUS travel to other government facilities or other contractor facilities may be required. All travel requirements (including plans, agenda, itinerary, or dates) shall be pre‐ approved by the Government (subject to local policy procedures) and is on a strictly cost reimbursable basis. Contractor personnel shall be authorized reimbursement for travel expenses consistent with the regulatory implementation of Public Law 99‐234, the substantive provisions of the Joint Travel Regulation (JTR) and FAR 31.205‐46 and the limitation of funds specified in this contract. Costs submitted for reimbursement shall be supported by receipts and shall be limited to the lesser of the actual cost incurred or the then current per diem rates established by the General Services Administration (GSA). With the exception of travel requests related to short notice support requirements, as specified in section 3.1.9.1, all contractor personnel travel shall be requested through the COR a minimum of 5 working days prior to the start date of travel. Contractor personnel will not be reimbursed for travel to the AVTB government facilities located at Camp Pendleton, CA. A draft deliverable, in accordance with the appropriate CDRL is due by the due date established by the Government. The final deliverable is due 5 working days after receipt of government comments on the initial submission unless a different schedule is agreed to by the Government and the Contractor. In addition, a trip report will be provided to the COR upon completion of travel within 5 working days. If multiple Contractors execute the same travel, a combined trip report can be submitted.

• CDRL B003 – DI‐MISC‐81943, Trip/Travel Report

The following is a notional list of travel requirements; however, the Contractor is expected to support all potential travel requirements at these and other locations throughout the world.

Purpose Location Personnel Estimated Trips Per Year Days Per Trip

Off-Site Test Hawaii- Honolulu County 4 1 30

Off-Site Test Southern California- San Diego County 4 3 5

Off-Site Test Northern California- San Diego County 4 1 30

Off-Site Test Oregon- Clatsop County 4 1 50

3.1.12 Privacy Act Information

The Contractor shall comply with requirements of DoD Directive (DoDD) 5400.11 regarding control of Privacy Act information. Specifically, the Contractor shall ensure that any PII (e.g., individual’s name and associated personal contact information or social security numbers) is restricted to access required for execution of this contract and is not disclosed or stored on any unsecure systems. Contractor personnel shall adhere to the Privacy Act, (5 U.S.C. § 552a) and applicable agency rules and regulations. Contractor personnel shall not divulge or release privacy data or information developed or obtained in the performance of this contract, until made public or specifically authorized by the Government.

3.1.13 Program Management

The Contractor shall designate a primary POC that will be responsible for the accomplishment of all tasks in this PWS. The designated POC shall plan, organize, manage, schedule, implement, control, analyze, and report on all elements of this PWS. The designated POC shall be prepared to present and discuss the status of contract activities, requirements, and issues with the Government. The designated POC shall also be responsible for assessing requirement changes and implementing approved changes, as authorized by the Contracting Officer.

3.1.13.1 Contract Management Plan

The Contractor shall develop a management plan to support the requirements of this PWS. The management plan describes the contractor’s organization, assignment of functions, duties, responsibilities, management procedures and policies, and reporting requirements for the conduct of contractually imposed tasks, projects, or programs. The final deliverable is due 5 working days after receipt of government comments on the initial submission unless a different schedule is agreed to by the Government and the Contractor.

3.1.13.2 Monthly Status Report (MSR)

The Contractor shall prepare and deliver an MSR for the activities supported during the month.

The MSR shall be delivered in the version of Microsoft Office used by AVTB. Contractor format is acceptable. The MSR shall be sent to the Government via e-mail and shall address all data required in the DID, which shall include, at a minimum, a description of the support provided during the reporting period, a list of completed events, and the status of ongoing efforts.

The MSR shall also include personnel availability reports, lessons learned following major test events, and any recommendations to improve daily rescue procedures.

The reporting period will be from the first to last workday of each month, beginning 30 calendar days after contract award.

The MSR shall be provided to the Government on the 6th day of each month for review. The final MSR shall be delivered by the 10th of each month.

• CDRL B004 – DI‐MGMT‐80227, Contractor’s Progress Status and Management Report

– Monthly Status Report

3.1.13.3 Mobilization/Phase-Out Period

3.1.13.3.1 Mobilization

Due to time constraints and the immediate urgency of these requirements, there will not be adequate time to conduct Phase-Out mobilization with the on-boarding Contractor. Therefore, there is no requirement for Phase-Out mobilization with the on-boarding Contractor for this PWS. However, the on-boarding Contractor shall work closely with the COR and prepare to assume full responsibility for all areas of operation in accordance with the terms and conditions of this contract. The intent is to minimize any decreases in productivity and to prevent possible negative impacts on AVTB support services. The Contractor shall have the required personnel on board throughout the entire period of performance. The Contractor shall be prepared to assume full responsibility for all contract requirements from the first full day of contract performance.

3.1.13.3.2 Phase-Out

The Contractor shall retain full responsibility for meeting contract requirements until completion of the phase-out period. The Contractor shall provide all support to ensure a smooth transition and minimize impact on operational readiness. The Contractor shall not defer any requirements for the purpose of avoiding responsibility or for transferring such responsibility to the succeeding Contractor. The Contractor shall provide access to all work sites and to all documentation on a not‐to‐interfere basis during the phase-out period when the follow‐on Contractor is mobilizing.

The Contractor shall provide all phase‐out deliverables to the Government prior to the conclusion of the contract period of performance. Additionally, the Contractor is responsible for maintaining an inventory of all technical data delivered, furnished, or otherwise provided to the Government under this contract and the means for transferring all technical data to the succeeding Contractor. The actual transfer of technical data from the incumbent Contractor to the follow-on Contractor will be made through the Government. The Contractor shall report phase-out status monthly in the MSR, while keeping a running record of previous actions in the MSR required to be submitted pursuant to section 3.1.13.2.

3.1.13.4 Identification of Contractor Personnel

The Contractor shall provide to the Government the name or names of the responsible supervisory person or persons authorized to act for the Contractor. The Contractor shall remove from the site any individual whose continued employment is deemed by the Contracting Officer to be contrary to the public interest or inconsistent with the best interests of national security.

The Contractor shall provide to the Government a roster of contractor personnel assigned to the contract and update the list monthly in its MSR submission required to be submitted pursuant to section 3.1.13.2.

3.1.13.5 Post Award Conference (PAC)

The PAC is the first meeting of key Government and Contractor participants. During the conference, participants will discuss the roles and responsibilities and agree on an interpretation of contract requirements for all parties. The PAC includes a review of contract terms, conditions and requirements, line items, and sequence of events needed for successful execution of the contract effort. The Contractor shall attend and participate in a PAC at the AVTB facilities located at Camp Pendleton, CA. The PAC shall be scheduled no later than 10 calendar days after contract award. The Contractor shall coordinate with the Government to arrange a schedule and agenda for the PAC prior to the meeting. The Contractor shall prepare the conference agenda and meeting minutes. A draft deliverable is due by the due date established by the Government. The final deliverable is due 5 working days after receipt of government comments on the initial submission unless a different schedule is agreed to by the Government and the Contractor.

• CDRL B005 – DI‐ADMN‐81249B, Conference Agenda

• CDRL B006 – DI‐ADMN‐81250A, Conference/Meeting Minutes

3.1.13.6 Technical Documentation

The Contractor shall develop and deliver technical documentation (e.g., detailed test plans (DTPs), final test reports (FTRs), interim data reports (IDRs), quick look reports (QLRs), technical notes) required to be submitted pursuant to this PWS. A draft deliverable is due by the due date established by the Government. The final deliverable is due 5 working days after receipt of government comments on the initial submission unless a different schedule is agreed to by the Government and the Contractor.

• CDRL A001 – DI-MISC-80508B, Technical Documentation

3.1.13.7 Data

3.1.13.7.1 Data Rights

Data rights is addressed by the appropriate clauses, which have been inserted into the contract.

Upon disposal, replacement, turn in of hard drives, or completion of the contract, non- Government owned internal/external hard drives shall become the property of the U.S.

Government in accordance with General Administrative (GENADMIN) Processing of Magnetic Hard Drive Storage Media for Disposal. This applies to unclassified internal and removable magnetic and Solid-State Drives (SSDs) used to store Government data.

3.1.13.7.2 Data Management

The Contractor shall provide a POC for data oversight that shall ensure data delivered, furnished, or otherwise provided for under this contract includes the appropriate version, format, associated rights, and purpose. The security of the data and the protection of classified, privacy related, or proprietary data shall be the responsibility of the Contractor.

3.1.13.7.3 Distribution Statement

The appropriate distribution statement shall appear on the cover or title page of all new and updated deliverable technical documents, data, and information (e.g., engineering drawings, technical notes and manuals, test plans, test or technical reports, test procedures, and computer software documentation), whether produced in hard copy or soft copy format.

3.1.14 Government Property

There is no reportable government property being furnished to the Contractor in support of the requirements specified in this PWS. In accordance with FAR 45.101, software and intellectual property are not defined as government property or reportable as such per FAR 45.000(b)(4).

Consistent with FAR 45.000(b)(5), government property incidental to the place of performance remains the responsibility of the Government. This includes office space, desks, chairs, telephones, and hand-held radios if issued.

3.1.15 Government-Furnished Information (GFI)

The Government will provide the Contractor access to the following information and automated services in support of this PWS:

• Access to commercial internet and MCEN. This includes a CAC to support PKI access and Marine Corps web services, if determined by the Government to be necessary for the tasking within this PWS.

• A user and e-mail account on the MCEN-N.

• Contractors are required to complete the classes listed below. The Cyber Awareness Challenge and PII training must be completed on MarineNet (https://www.marinenet.usmc.mil/my.policy) before an e-mail account is issued, and annually thereafter by 30 September.

o Current fiscal year DoD Cyber Awareness Challenge o DON Annual Privacy Training (PII) o Antiterrorism Level I Awareness Training o DON’s Secretary of Defense (SECDEF) Directed OPSEC and Unauthorized

Disclosure Training o Counterintelligence Awareness and Reporting (CIAR) o Risk Management for USMC Civilians o CUI Training

• Contractor personnel are authorized to receive training on government systems and software when training is not available in the commercial sector.

The training completion certificates shall be delivered to the Government by the Contractor, per the requirements of this PWS via submission of CDRL B007 – Contractor Training Completion Report. The certificates shall be sent to the Government via e-mail in Portable Network Graphics (PNG) or Portable Document Format (PDF) format within 7 days of completion.

• CDRL B007 – DI-MGMT-82151, Contractor’s Training Plan – Contractor Training Completion Report

3.1.16 Invoicing

The Contractor shall submit an electronic copy of an invoice, no more than once a month, via the Wide Area Workflow (WAWF) module within the Procurement Integrated Enterprise Environment (PIEE).

The Contractor shall be required to implement the Defense Federal Acquisition Regulation Supplement (DFARS) process to submit an electronic payment request. To implement DFARS 252.232-7003, “Electronic Submission of Payment Requests and Receiving (December 2018)”, the USMC utilizes WAWF – Receipt/Acceptance (WAWF-RA) to electronically process Contractor requests for payment. This process allows DoD Contractors to submit and track invoices and receipt/acceptance documents electronically. The Contractor shall be required to utilize this system when processing invoices and receiving reports. The Contractor shall (1) ensure an Electronic Business Point of Contact (EBPOC) is designated in the System for Award Management (SAM) website at https://www.sam.gov and (2) register to use WAWF-RA at the https://wawf.eb.mil website, within 10 calendar days after award of this contract or modification.

The procedures to register are available at https://wawf.eb.mil.

3.1.17 Administrative Authority

3.1.17.1 Contracting Officer

Only the Contracting Officer has the authority to authorize deviations from the terms and conditions of this contract, including deviations from the specifications and requirements stated herein. In the event the Contractor does deviate, without the issuance of a duly executed contract modification, such deviation shall be at the risk of the Contractor, and any costs related thereto, shall be borne by the Contractor.

3.1.17.2 Contracting Officer’s Representative (COR)

The COR is limited to providing program-specific clarification to the Contractor’s task leader and does not have the authority to act, either directly or indirectly, that would change the pricing, quality, place of performance, delivery schedule, or other terms and conditions of this contract, or to direct work beyond the scope of this PWS. If the Contractor perceives that the COR or other government personnel are requesting an effort outside the scope of this contract, the Contractor shall promptly notify the Contracting Officer in writing. No action shall be taken by the Contractor until the Contracting Officer has issued a contractual change or otherwise resolved the issue. The COR will be appointed at the time of contract award. The Government reserves the right to reassign the COR position.

3.1.18 Hull Cleaning Program Training Log

The Contractor and subcontractors shall read and fully understand the Best Management Practices (BMP) document prior to engaging in underwater hull cleaning activities. Hull cleaning shall be documented in the contractor’s Hull Cleaning Program Training Log and updated annually, per section 3.3.3. The log is due 30 days after contract award and then updated three days after completion of each cleaning.

The log shall include, at a minimum:

• Description of the services provided

• Deliverables completed during the reporting period

• Copies of photographs taken

• Personnel who performed the work

• Any technical issues, concerns, or problems areas, and planned or recommended solutions for correcting any problem(s)

3.1.19 Dive Plan

The Contractor shall provide a dive plan, to include emergency numbers for the nearest hospital for injuries and the nearest hyperbaric facility (with directions) for the treatment of diving related illnesses. The plan is due 30 days after contract award.

• CDRL B001 – DI‐MISC‐80508B, Management and Technical Plan

3.2 Specific Requirements

The specific requirement for this PWS includes:

• Dive support services

3.2.1 Dive Support Services

The Contractor shall provide the following scuba diving services:

1. Shall be on an on-call status for subsequent task orders provided by AVTB. AVTB, at a minimum, will provide a 2-week notice prior to any test or training events.

2. Shall provide an OSHA compliant four-person dive team to support AVTB during amphibious vehicle operator training, sustainment operations, and T&E support by the start of the Period of Performance.

3. Shall provide emergency dive…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .