Salient Characteristics Aggregate Peleliu.pdf
PDF 62 KB Posted
- Attached to
- Aggregate Federal contract opportunity
- Solicitation number
- M6845024QN002
- Issued by
- United States Marine Corps
About this file
This document outlines requirements for a federal contract to supply aggregate materials and delivery services to support construction at a Marine Corps airfield on the island of Peleliu. The contractor will be required to deliver approximately 4,100 loose cubic yards of 2-inch minus limestone aggregate between December 20, 2023 and February 1, 2024. Deliveries must be coordinated with the listed technical point of contact or site manager and will take place between 0800 and 1800 hours Monday through Friday via barge and dump trucks. The contractor is responsible for providing all necessary equipment, fuel, maintenance, and staffing for deliveries. Due to the large volume requested, multiple trips will be needed to complete the deliveries, which should be performed using a spread dump succession method. The related federal contract opportunity is solicitation number M6845024QN002 for aggregate materials issued by the United States Marine Corps.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| M6845024QN002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Aggregate Requirements ISO MCED-P 23.2
Salient Characteristics: 4100 Loose Cubic Yards (LCY) of 2 inch minus limestone aggregate
Required Delivery Date: 20 December 2023 – 1 February 2024
Delivery Location: Link up with the Site Manager and Technical Point of Contact to coordinate the delivery process in alignment with the execution plan IVO the Peleliu Airfield.
Delivery Mode Notes: Barge and dump trucks required for delivery.
Delivery Hours: 0800-1800 Monday – Friday.
Technical POC:
CWO2 Miracle, Michael
Site Manager:
GySgt Farney, David J
Alternate Site Manager:
SSgt McCusker, Joseph A
Alternate POC:
1stLt Bjurman, Mats E
Additional Delivery Notes:
All aggregate deliveries will be performed in accordance with guidance and direction of the Technical POC or Site Manager. Due to the volume requested, multiple trips are required to deliver the aggregate.
It is recommended that the contractor utilize multiple dump trucks for delivery. Deliveries will be performed in a spread dump in succession manner starting at the point at which the previous delivery ended. The Contractor is responsible for operators, full maintenance, repairs, spare parts or replacement, and fuel, as required for all equipment utilized and delivered in support of this requirement. Contractor must coordinate with the Technical POC or Site Manager at a minimum of three business days prior to any aggregate deliveries.
File details come from the government source that posted it. Updated .