Solicitation-_M67861-19-Q-0005__IP_Telephone_Sacramento_CA.pdf
PDF 438 KB Posted
- Solicitation number
- M67861-19-Q-0005
- Issued by
-
United States Marine Corps
About this file
Please see attachment!
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SACRAMENTO_PWS_SITE_SURVEY_UPDATES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
M6786119Q0005 01-Feb-2019
b. TELEPHONE NUMBER
(504) 697-8348
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 28 Feb 2019
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
M678619. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SAMSON WODAJO
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
M2638119SU00098
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
MARFORRES REGIONAL CONTRACTING OFFICE
MFR RCO
2000 OPELOUSAS AVE
NEW ORLEANS LA 70114
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE M29422 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
MAINT SVCS CO CLB 23 CLR 4 4TH MLG
SGT CRIGHTON, CHRISTIAN R
8277 ELDER CREEK ROAD
SACRAMENTO CA 95828
TEL: 916-387-7123 X223 FAX:
FAX:
TEL: 504-697-8357 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
1,250
NAICS:
334210
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
M6786119Q0005
Section SF 1449 - CONTINUATION SHEET
INSTRUCTIONS TO OFFERORS
1. This is a Brand Name or Equal Combined Synopsis-Solicitation under FAR subparts 12 and 13 for a firm-fixed price contract.
2. The Government will consider a single award as a result of this Solicitation.
3. This procurement is a 100% Small Business Set-aside. Offeror must qualify as a Small Business Concern under NAICS Code 334210 (Business Size Standard; 1250 Employees).
4. Market research conducted via SAM advance search, GSA Advantage, World Wide Web and Previous Acquisitions revealed there is a reasonable expectation of obtaining offers from two or more responsible small business concerns that are competitive in terms of market prices, quality, and delivery.
5. FAR Part 19.502-2 (a) Each acquisition of supplies or services that has an anticipated dollar value exceeding $3,500 but not over $250,000 is automatically reserved exclusively for small business concerns and shall be set aside for small business unless the contracting officer determines there is not a reasonable expectation of obtaining offers from two or more responsible small business concerns that are competitive in terms of market prices, quality, and delivery.
6. Marine Forces Reserve Small Business Program Deputy Director concurs with this action.
7. All responsible sources may submit a quotation which, if received in a timely manner, shall be considered by the agency.
8. Quotations/bids/attachments should be submitted as a pdf document via email to samson.wodajo@usmc.mil and cc: shelley.mentzos@usmc.mil . Each email may not exceed 5MB in size due to server/network restrictions. Submit multiple emails if necessary to ensure timely receipt of your bid. Only pdf email attachments are authorized. Any other email attachment types will be rejected by this agencies servers. All bids should include an overall total price in addition to individual pricing by contract line item (CLIN)
9. BASIS OF AWARD - Vendor shall refer to FAR clause 52.212-2 herein for evaluation factors.
11. The Contracting Officer will review Supplier Performance Risk System (SPRS) and Past Performance Information Retrieval System (PPIRS) for responsibility determination purposes.
12. Post site-visit:
a. Government to publish photographs of the location post-site visit to include existing telephone system; demarc area; and computer switches.
b. Government to publish room(s) dimensions.
13. An itemized breakdown of all parts and labor (to include quantities and unit prices) necessary to complete the delivery and installation should be included in the vendor's quote.
mailto:samson.wodajo@usmc.mil mailto:shelley.mentzos@usmc.mil
14. All responses to this solicitation should indicate whether the firm is offering a 'brand name manufacturer's products' or ‘equal products.' Firms offering equal products should submit sufficient descriptive literature to permit the contracting agency to assess whether the equal product meets all the salient characteristics specified in the solicitation. Firms offering "equal" items should provide the make, model, description of the items, and provide their own product literature/brochures (not the manufacturer's product literature/brochures nor a reiteration of the salient characteristics provided in the solicitation). This agency will not be responsible for locating or obtaining any information not included as a hardcopy attachment in a response to this solicitation.
15. It is the offerors responsibility to furnish sufficient information and detailed specifications to the government to determine acceptability of the offered item(s). Failure to provide product quotes that meet the salient characteristics may result in quote being considered non-responsive.
16. Method of Invoicing/Payment: Wide Area Workflow (WAWF).
17. NO PHONE CALLS will be accepted regarding this solicitation. ALL QUESTIONS shall be sent in writing via email to samson.wodajo@usmc.mil and cc: shelley.mentzos@usmc.mil .
18. Completely fill out this SOLICITATION AND ALL AMENDMENT documents if issued (including applicable clauses). (a) Return documents along with quote to Marine Forces Reserve Regional Contracting Office POC Only.
21. Provide a quote on company letterhead with following information for all vendors associated with the quote.
a. Cage Code and or DUNS Number.
b. Address.
c. Point of contact (email and telephone number
19. Provide estimated delivery time after receipt of order for supplies and period of performance for services for each line item or for entire quote (if applicable). This should be visible on the face of the quote and not incorporated as a link or other attachment. (Per SOW para 4(a) – installation date and scope of work shall be completed no later than 30 days after the contract has been awarded).
20. Prompt payment/discount terms (if offered). This shall not be used to evaluate offers.
21. Bidders should complete the following provision/clause listed in this solicitation: DFARS 252.239-7009. FAR clauses can be completed manually within this solicitation or printed and completed manually by copying and pasting provision/clause from this link:
http://farsite.hill.af.mil/VFFARA.HTM).
22. Solicitation/Contract Line Item Numbers (CLIN) Structure – Potential bidders should submit bids in the same CLIN structure as outlined in the solicitation for bid evaluation purposes. However, an alternate line item structure can be submitted as an additional attachment consolidating like line items and pricing for award consideration.
23. Assignment of Claims – Potential bidders that may need an Assignment of Claims as described in FAR 32.8 (copy/paste link into web browser: http://farsite.hill.af.mil/VFFARA.HTM) should mailto:shelley.mentzos@usmc.mil include a statement on bid that "Assignment of Claims is required if selected for award." Assignment of Claims will not be used as an evaluation factor for award. However, all Assignment of Claims documentation should be submitted with bid or provided BEFORE accepting award for Contracting Officer determination. The Government reserves the right to disapprove a request for Assignment of Claims; vendor will be advised of disapproval prior to drafting of award so vendor may determine if it can still fulfill the contractual requirement without an Assignment of Claims. If request for Assignment of Claims is not included in bid or required documentation is not provided PRIOR to Contractor acceptance of award, the Contracting Officer may reject request for Assignment of Claims and award to the next qualified offeror.
24. System for Award Management (SAM.gov) – Potential bidders not currently registered at SAM.gov should register (including completion of certifications and representations) to be considered for award. Registration may take several days to be visible at SAM.gov, therefore, affected bidders should provide proof of registration/date with bid submittal. Contact SAM.gov website points of contact if you need assistance with registration.
STATEMENT OF WORK
Reference to BICSI Telecommunications Distribution Methods Manual Ninth Edition Year 2000 All material will be installed according to manufacture recommendations unless otherwise instructed by G6.
STATEMENT OF WORK (SOW)
PROJECT: (SACRAMENTO, CA)
1. Scope:
a. This STATEMENT OF WORK (SOW) establishes and defines the requirements for the contractor to engineer, furnish, install, secure, test (EFIST), and the installation of an IP based voice solution. Contractor is to provide IP/digital voice capabilities that are compatible with current infrastructure and fulfills the present and future telephony requirements.
The site address is:
MAINT SVCS CO CLB 23 CLR 4 4TH MLG
8277 Elder Creek Road; Sacramento, CA 95828 Sgt Crighton, Christian R. Work #916-387-7123 x223 Cell #916-230-3519 Cpl Oakes, Gregory C. Work #916-387-7123 x234 Cell #916-432-7118
b. Company will install an Avaya IP Office Telephone system or similar. The Telephone system MUST include the following attributes:
1) Auto Attendant
2) Expandability for future increase of users
3) Capability of multiple voicemail boxes
4) Storage capacity for voice mails
5) Support digital phones / IP phones/ Analog Phones
6) Capability of remote access
7) Capability of internal and external paging
8) Support a PRI, T1, or analog lines
2. Project Manager: All required actions will come through the Government Project Manager. The Government Project Manager will be TBD upon award of contract.
3. Contractor Project Manager: Company will provide a Project Manager (PM) within 5 days of award. PM duties shall include:
a. Project plan and Milestone schedule 5 days after contract is awarded.
b. Coordination for installation, hardware delivery, and inventory control with Government Project Manager.
c. Project status meeting within 5 days of award and/or deemed necessary by project manager and COR until completion.
d. Project closure meeting once project is complete will be coordinated with Government Project Manager.
e. Manage change request.
f. Performance of work is executed within normal business practices.
g. Contractor Project Manager will coordinate all changes with Government Project Manager.
h. Contractor Project Manager will provide training on site.
i. Pictures will be taken of all work, once it has been completed and emailed to Government Project Manager.
j. Once scope of work has been completed, Contractor Project Manager is required to contact Government
Project Manager to inform scope of work status is complete.
k. Once project is completed all deliverables will be a requirement prior to signing off for payment.
4. Schedule:
a. Installation date and scope of work should be completed no later than 30 days after the contract has been awarded, unless there are two or more consolidated sites the no later than timeframe will be 45 days. Cutover will be decided with the Government Project Manager and local site Government Representative’s input and will not impede mission accomplishment. However on a case by case basis, if an adjustment to the installation schedule needs to be arranged; coordination with the Government Project Manager is required and can only be approved by the Government Project Manager.
A. Site Visit Date: February 13, 2019
1) @ 0900 (Call Site POC for access)
B. Installation – Completed No Later Than 30 Days from Award Date.
5. Meetings:
A. The contractor shall participate in scheduled on-site meetings, conference calls, present briefings, and provide progress overviews as indicated below. The contractor shall provide project documents and weekly project photos electronically to the Government.
6. Hardware installation requirements in accordance to normal business practices:
A. For ALL locations, the hardware (provided by vendor) installation includes:
1) Placement and testing of parts and connectivity.
2) Installation of all required wiring.
3) If telephone switch programming is being programmed or engineered offsite, during the test and tone requirement, the vendor will work directly with site POC in order to complete the required database workbook entries within four days of awarded.
4) The contractor shall test and Tone all voice terminal lines prior to installing the Telephone system, if terminals fail repair and/or replace any nonfunctional voice terminal jacks and or wiring.
5) All voice terminals must be in working order for the contract to be complete
6) Installation of the Telephone Switch (new equipment, not refurbished) from an Authorized Dealer with latest software and voicemail
7) Capability of remote access
8) Must include a Laptop computer, install software prior to installation.
9) Remove old Telephone Switch and ALL obsolete wiring/blocks pack up in boxes for shipment with a listed inventory and give to the site point of contact
B. For Site Location:
1) 10 mail boxes with 15 minutes of voicemail storage per user
2) UPS with 4 hours of backup power
3) 10 1416 Avaya Digital Telephones or Telephones similar to.
4) 3 LOOP start Lines are to be tied into the phone system
5) “X” PRI Lines are to be tied into the phone system
6) “X” T1 Lines are to be tied into the phone system
7) 2 ANALOG Lines are to be tied into the phone system
8) Provide the gear and the capability for 1 Conference room/s with (or similar to) the AVAYA B159 and
B100 Expansion Micro phones.
9) Contractor, COR and Local customer will work with local exchange carrier (LEC) and ensure that the
Loop start lines / PRI / SIP Trunks are operational with the Telephone system as an out route for local and long distance telephone system capabilities, contact awardee will ensure that the hunt group is operational with the new Telephone System prior to telephone system changeover.
7. Site Specific requirements: Contractor will test and tone all extensions and validate all incoming lines from the LEC insuring that all lines are working documenting each termination point with the results provided to the Government in a final engineering report due upon completion of the installation. All jacks in the field will be labeled to their corresponding port with in the room and on the patch panel within the communication closet. Pictures of labeled patch panels and jacks will be submitted as part of the closing documents and is a requirement of this STATEMENT OF WORK. The contractor will use existing wiring unless deemed un-servable in which case the contractor will be responsible for replacing un-servable cable. The New system will tie into a patch panel from the switch module and everything will be extended to the 66 OR 110 blocks ensuring that everything is labeled, if 66/110 block is damaged/unserviceable the contractor will be responsible for replacing. Wiring from patch panel to 66 block will be organized so that wiring and connections can be easily identified. Contractor will be responsible for any extra materials as needed for outlying building. The contractor will remove all components of old telephone switch to include any obsolete wiring, rack, or 66/110 blocks not being used by new telephone system and pack up for shipment with a listed inventory given to the site point of contact. During the Solicitation Site Survey (SSS), the contractor shall evaluate the AC and DC power systems at all locations where work is being performed ensuring system will have ample power to operate the new telephone system and evaluate the space requirement for their companies stated and preferred telephone system. There are currently “X” Alarm lines that need support from the LEC. The Contractor will check to make sure that they are not running thru the telephone system on an analog port. If it is found that they are the Contractor will inform the COR and remove them from the phone system and run them directly from the LEC. If an additional line is needed in order to facilitate this the Contractor will work with the COR and the LEC to get a line installed. The contractor is responsible to make sure that the alarm lines are online and working prior to cutover. Once the bid has been awarded the company that wins the bid is responsible for installing the system based on the space capacity of the required space. It is the bidder’s responsibility if they find it inadequate after the fact to make the system work in the designed space and or install in a space agreed to by the COR.
8. THE CONTRACTOR SHALL REPAIR AND/OR REPLACE ANY NONFUNCTIONAL VOICE
TERMINAL JACKS AND OR WIRING. ALL VOICE TERMINALS MUST BE IN WORKING
ORDER FOR THE CONTRACT TO BE COMPLETE.
A. The contractor shall use the existing main AC power service panel or sub-panels to the maximum extent possible. All new main telecommunication service panels shall be 120/208 VAC, three-phase system, dedicated feeder line, 5-wire, protective “green” wire ground from the main disconnect with a capacity to support all requirements with 25% spare breaker positions. Sub-panels shall be approved by the Government and shall be 120/240 VAC, single phase panels or 120/208 VAC, three-phase panels. A surge protection device shall be provided at the main telecommunications power panel and any other outlying building/s to suppress lightning-induced voltage and current surges within the AC electrical distribution system. The surge suppressor shall be mounted directly beside its serving breaker.
B. The contractor shall provide formal training for all new systems provided under this SOW. On-site training is preferred. The contractor shall provide all necessary materials, documentation, manuals, and training aids. Training material shall be provided in hard and soft copies at the commencement of the training. At least one person shall be fully trained prior to cutover, and all training shall complete prior to project close out.
C. The contractor shall provide a detailed list of materials (including type and amount) of inside cable plant materials used (e.g., racks, cable ladders, Jhooks, jacks, faceplates, and feet of cable) used insuring that it is within the provided quote. The final Engineering Report shall include a complete building floor plan with all station locations, to include red line drawing of cable pathways.
D. Deliverables are a requirement for a project to be paid out once project is finished. Deliverables will consist of the following: Rack layout photos, photos for proof of Grounding the Telephone System. Phone data plate labeling photos to coincide with the patch panels labeling, Inventory warrantee records, main auto attendant flow charts, License Keys, IP addresses. Summary of record of system configurations, configurations files, extension phone assignments, hunt groups, short code dialing, user training agenda, a quick reference guide, quick administration Reference Guide, and an as built Documentation table of contents. Once the project is awarded the Government representative will email the winning bidder an example that the company will follow from past installations that they should follow.
E. The contractor shall provide a full, unlimited Three year warranty for all contractor provided hardware/software, materials, and workmanship, which shall not begin until final Government acceptance of all items delivered under this SOW. The warranty period shall begin after all discrepancies have been cleared and the continuous thirty (30) day Break-in of all systems delivered under this SOW. All discrepancies shall be corrected before the break-in period can begin or be restarted. The warranty shall include emergency onsite technical assistance for diagnostics and troubleshooting for the first full year and will include labor. The contractor shall track and resolve the problem(s) in accordance with standard commercial practices. The contractor shall provide a Warranty Procedure Guide that includes phone numbers and addresses for repair and return, phone numbers for requesting remote diagnostics, and specific procedures for obtaining these services. The contractor shall also provide phone numbers, addresses and procedures for obtaining emergency replacement parts and an address for returning the defective items. It is expected that this information will be valid during the warranty and for life cycle support after the warranty has expired the contractor shall provide the Warranty Procedure Guide on each system delivered under this SOW before commencement of the thirty (30) day break-in.
F. In order to minimize the risk of the Government purchasing counterfeit products or unauthorized secondary market equipment, which would not be supported by the Original Equipment Manufacturer (OEM), and to ensure that the Government purchases only equipment that is genuine (i.e., not counterfeit or gray market), authorized (e.g., including appropriate licenses), and supported (e.g., warranty and support services) by the OEM, Offeror shall certify that it is a Manufacturer Authorized Partner as of the date of the submission of their offer, and that it has the certification/specialization level required by the Manufacturer to support both the product sale and product pricing, in accordance with the applicable Manufacturer certification/specialization requirements. Unless otherwise specified, Offeror shall warrant that the products are new, in their original box. By submitting a response to an Request for Quote (RFQ), Request for Proposal (RFP), the Offeror confirms to have sourced all Manufacturer products submitted in this offer from Manufacturer or through Manufacturer Authorized Partners only, in accordance with Manufacturer's applicable policies in effect at the time of purchase. Offeror shall provide Buyer with a copy of the End User license agreement, and shall warrant that all Manufacturer software is licensed originally to Buyer as the original licensee authorized to use the Manufacturer Software.
G. (FOR AVAYA PRODUCTS) Company must be authorized by Avaya to market and sell to the Federal
Government.
9. Final Systems Acceptance:
A. The contractor shall notify the Government upon completion of all tasks under this SOW. Final inspection and acceptance is the responsibility of the Contracting Officer’s Representative (COR). Acceptable performance is achieved when all hardware, software, components, and equipment have been provided;
installation, integration, testing, demonstration, and preventative maintenance is completed; the system has run successfully and consecutively for thirty (30) calendar days without interruption, faults or downtime; and all training is completed. Inspection or testing of services rendered which are conducted by the COR and the local site coordinator prior to final delivery and that does not uncover defects or other failures, this does not relieve the contractor from the responsibility for correcting those defects or other failures to meet contract requirements. The Government will provide formal acknowledgement that all terms of the task order has been accepted.
10. Discrepancies:
A. The Government reserves the right to refuse final acceptance until all discrepancies have been satisfactorily resolved. The contractor shall prepare a project discrepancy list, report detected issues during meetings, and track all discrepancies until resolved. The Government shall review and monitor all discrepancies and deliverables. The discrepancy list shall include any problem(s) detected or identified during system testing or inspections that were conducted by either the contractor or Government, or both. The contractor shall retain a history of discrepancies. Problems identified at any time during the course of this project shall be documented, provided to the Government, and corrected prior to final acceptance.
11. Software Engineering:
A. Provide basic system translations for trunking, network routing and video endpoint translation.
B. Software or switch access will be provided by company on-site.
C. Ensure unit has passwords to change settings, and annotate the password on the outside of the telephone switch.
D. Ensure Government Project Managers have unit passwords to change settings, and annotate the password on the outside of the telephone switch.
E. Ensure attendant greetings do not contain spoken names, only billets.
12. Quality Assurance:
A. This section identifies the method of the Government’s Quality Assurance Personnel (QAP) will use to verify the quality of the contractor’s performance.
B. Re-performance of unacceptable services at no additional cost is the preferred course of action when appropriate.
C. If adverse conditions or other factors beyond the Contractor’s control are the cause for failure to meet contract specifications, no remedy will be assessed against the Contractor for failure to perform provided each incidence is documented by the Contractor and submitted to the Contract Technical Point of Contact (CTPOC) for approval by the Contracting Officer. If the parties do not agree that the cause is due to factors beyond the Contractor’s control, the Contractor may proceed with a dispute under the contract’s FAR Clause 52.212-4.
D. Government CTPOC (Contract Technical Point of Contact) shall be notified on progress of installation/repairs in order to allow CTPOC to schedule to witness work at the site.
E. FAILURE TO INSPECT. If the Contractor fails to notify the CTPOC that the work is ready for inspection, or the Contractor fails to attend an inspection after notification, then the CTPOC may conduct an inspection at his/her own convenience, and his/her findings shall be considered as if they had been mutually agreed upon in a joint inspection, and the Contractor will be considered to have chosen not to correct any deficiencies. See the paragraph entitled “Government Remedies” below for the consequences of this situation.
F. GOVERNMENT REMEDIES. The Contracting Officer will follow FAR Clause 52.212-4, Contract Terms and Conditions-Commercial Items paragraph “a”.
13. Payment:
Payment shall be made via WAWF (Wide Area Work Flow) electronic invoicing system.
14. Site Survey & Questioning:
Contact number for the day of the site survey is GySgt Damon Kyle at 504-697-9797. AFTER
THE SITE SURVEY, ALL QUESTIONS ARE TO BE DIRECTED TO THE REGIONAL CONTRACTING
OFFICE POC. Samson Wodajo at samson.wodajo@usmc.mil .
15. Contracting Officer’s Representative (COR): The COR for this contract is TBD and can be reached via email at TBD upon award. The COR is not authorized to make any changes to this contract. Only a warranted Contracting Officer (CO) is authorized to make changes to this contract. In the event the contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase incurred as a result there of.
16. SAFETY GUIDANCE
Contractors shall adhere to all relevant safety guidance, including (but not limited to):
(a) EM 385-1-1 – U.S. Army Corps of Engineers Safety and Health Requirements Manual
(b) OPNAVINST 5100.23 (series), Navy Occupational Health and Safety Program Manual
(c) MCO 5100.29 (series), Marine Corps Safety Program
(d) MCO 5100.8, Marine Corps Occupational Safety and Health (OSH) Policy Order
(e) NAVMC DIR 5100.8, MARCOR OSH Program Manual Contracting Officer’s Representatives shall immediately report accidents/injuries sustained during contract performance to the Contracting Officer so that the Contracting Officer may report said accidents/injuries to responsible agency safety officials.
17. CONTRACTOR REPORTING OF LABOR HOURS
Pursuant to NMCARS 5237.102(90), the contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the [NAMED COMPONENT] via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:
(1) W, Lease/Rental of Equipment;
(2) X, Lease/Rental of Facilities;
(3) Y, Construction of Structures and Facilities;
(4) D, Automatic Data Processing and Telecommunications, IT and Telecom- Telecommunications Transmission (D304) and Internet (D322) ONLY;
(5) S, Utilities ONLY;
(6) V, Freight and Shipping ONLY.
The contractor is required to completely fill in all required data fields using the following web address:
https://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.
Contractors may direct questions to the help desk, linked at https://www.ecmra.mil.
https://www.ecmra.mil/
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each Telephone System- Sacramento, CA
FFP
Contractor to provide and install IP Telephone System for U.S. Marine Corps located in Sacramento, CA in accordance with Statement of Work (SOW) herein.
The Government will consider Avaya brand or equal.
An itemized breakdown of all parts and labor (to include quantities and unit prices) necessary to complete the delivery and installations should be included in the vendor's quote.
FOB: Destination
MILSTRIP: M2638119SU00098
PURCHASE REQUEST NUMBER: M2638119SU00098
PSC CD: 5805
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 30 dys. ADC 1 MAINT SVCS CO CLB 23 CLR 4 4TH MLG
SGT CRIGHTON, CHRISTIAN R
8277 ELDER CREEK ROAD
SACRAMENTO CA 95828
916-387-7123 X223 FOB: Destination
M29422
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.212-1 (Dev) Instructions to Offerors - Commercial Items. (DEVIATION 2018-O0018)
OCT 2018
52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.219-6 (Dev) Notice of Total Small Business Set-Aside (DEVIATION
2019-O0003).
DEC 2018
52.232-40 Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.247-34 F.O.B. Destination NOV 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7005 Representation Relating to Compensation of Former DoD Officials
NOV 2011
252.204-7000 Disclosure Of Information OCT 2016 252.204-7015 Notice of Authorized Disclosure of Information for Litigation
Support
MAY 2016
252.213-7000 Notice to Prospective Suppliers on Use of Supplier Performance Risk System in Past Performance Evaluations
MAR 2018
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.239-7010 Cloud Computing Services OCT 2016 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.246-7008 Sources of Electronic Parts MAY 2018 252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES
DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018)
(a) Definitions. As used in this clause--
Covered article means any hardware, software, or service that--
(1) Is developed or provided by a covered entity;
(2) Includes any hardware, software, or service developed or provided in whole or in part by a covered entity; or
(3) Contains components using any hardware or software developed in whole or in part by a covered entity.
Covered entity means--
(1) Kaspersky Lab;
(2) Any successor entity to Kaspersky Lab;
(3) Any entity that controls, is controlled by, or is under common control with Kaspersky Lab; or
(4) Any entity of which Kaspersky Lab has a majority ownership.
(b) Prohibition. Section 1634 of Division A of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L.
115-91) prohibits Government use of any covered article. The Contractor is prohibited from--
(1) Providing any covered article that the Government will use on or after October 1, 2018; and
(2) Using any covered article on or after October 1, 2018, in the development of data or deliverables first produced in the performance of the contract.
(c) Reporting requirement.
(1) In the event the Contractor identifies a covered article provided to the Government during contract performance, or the Contractor is notified of such by a subcontractor at any tier or any other source, the Contractor shall report, in writing, to the Contracting Officer or, in the case of the Department of Defense, to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.
(2) The Contractor shall report the following information pursuant to paragraph (c)(1) of this clause:
(i) Within 1 business day from the date of such identification or notification: The contract number; the order number(s), if applicable; supplier name; brand; model number (Original Equipment Manufacturer (OEM) number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.
(ii) Within 10 business days of submitting the report pursuant to paragraph (c)(1) of this clause: Any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of a covered article, any reasons that led to the use or submission of the covered article, and any additional efforts that will be incorporated to prevent future use or submission of covered articles.
(d) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts, including subcontracts for the acquisition of commercial items.
(End of clause)
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
https://dibnet.dod.mil/ https://dibnet.dod.mil/
Lowest Price Technically Acceptable - Offers will be ranked lowest to highest according to price. A price analysis will be conducted to determine whether the lowest price will result from a single award or multiple awards. Based on the price analysis, the lowest price offer or multiple offers, will be forwarded to the requiring activity for technical evaluation (offer(s) will be deemed either technically acceptable or technically unacceptable). If the lowest price offer or offers is found technically acceptable and the pricing determined fair and reasonable by the Contracting Officer, evaluation will be deemed complete and award will be made based on the lowest price offer(s).
If the lowest price offer is determined technically unacceptable, another analysis will be conducted amongst the remaining offers to determine if a single or multiple awards will provide the lowest price. The lowest price offer(s) will be sent for technical evaluation. This process is repeated in order of price until an offer or combination of offers is deemed technically acceptable and price is determined fair and reasonable. The actual evaluation template is incorporated into this solicitation for reference.
TECHNICAL EVALUATION WORKSHEET FOR LOWEST PRICE TECHNICALLY
ACCEPTABILITY DETERMINATION (v8.19.2015)
PR NOMENCLATURE: MARFORRES G-6
Sacramento, CA
PR #:M26381-19-SU-
00098
Solicitation #: M67861- 19-Q-0005
TECHNICAL ACCEPTABILITY - SECTION 2: TBD
SOW Criteria Technically Acceptable
Not Technically Acceptable
Explain in Detail Why Does Not Meet Criteria
Section 1b. Scope Company will install a Avaya IP Office Telephone system or similar. The Telephone system MUST include the following attributes:
1) Auto Attendant
2) Expandability for future increase of users
3) Capability of multiple voicemail boxes
4) Storage capacity for voice mails
5) Support digital phones / IP phones
6) Capability of remote access
7) Capability of internal and external paging
8) Support a PRI, T1, or analog lines
Section 3: Contractor Project Manager:
Company will provide a Project Manager (PM) within 5 days of award. PM duties shall include:
a. Project plan and Milestone schedule 5 days after contract is awarded.
b. Coordination for installation, hardware delivery, and inventory control with Government Project Manager.
c. Project status meeting within 5 days of award and then every week until completion.
d. Project closure meeting once project is complete will be coordinated with Government Project Manager.
e. Manage change request.
f. Performance of work is executed within normal business practices.
g. Contractor Project Manager will coordinate all changes with Government Project Manager.
h. Contractor Project Manager will provide training on site.
i. Pictures will be taken of all work, once it has been completed and emailed to Government Project Manager.
j. Once scope of work has been completed, Contractor Project Manager is required to contact Government Project Manager to inform scope of work status is complete.
k. Once project is completed all deliverables will be a requirement prior to signing off for payment.
Section 4: Schedule
a. Installation date and scope of work should be completed no later than 30 days after the contract has been awarded. Cutover will be decided with the Government Project Manager and local site Government Representative’s input and will not impede mission accomplishment.
However on a case by case basis, if an adjustment to the installation schedule needs to be arranged;
coordination with the Government Project Manager is required and can only be approved by the Government Project Manager.
Section 5: Meeting A. The contractor shall participate in scheduled on-site meetings, conference calls, present briefings, and provide progress overviews as indicated below.
The contractor shall provide project documents and weekly project photos electronically to the Government.
Section 6: Hardware installation requirements in accordance to normal business practices:
A. For ALL locations, the hardware (provided by vendor) installation includes:
1) Placement and testing of parts and connectivity.
2) Installation of all required wiring.
3) If telephone switch programming is being programmed or engineered offsite, during the test and tone requirement, the vendor will work directly with site POC in order to complete the required database workbook entries within four days of award.
4) The contractor shall test and Tone all voice terminal lines prior to installing the Telephone system, if terminals fail repair and/or replace any nonfunctional voice terminal jacks and or wiring.
5) All voice terminals must be in working order for the contract to be complete
6) Installation of the Telephone Switch (new equipment, not refurbished) from an Authorized Dealer with latest software and voicemail
7) Capability of remote access
8) Must include a Laptop computer, install software prior to installation.
9) Remove old Telephone Switch and ALL obsolete wiring/blocks pack up in boxes for shipment with a listed inventory and give to the site point of contact
B. For Site Location:
1) 10 mail boxes with 15 minutes of voicemail storage per user
2) UPS with 4 hours of backup power
3) 10 1416 Avaya Digital Telephones or Telephones similar to. ***This quantity is for future expansion.
4) 3 LOOP start Lines are to be tied into the phone system
5) “X” PRI Lines are to be tied into the phone system
6) “X” T1 Lines are to be tied into the phone system
7) 2 ANALOG Lines are to be tied into the phone system
8) Provide the gear and the capability for 1 Conference room/s with (or similar to) the AVAYA B159 and B100 Expansion Micro phones.
9) Contractor, COR and Local customer will work with local exchange carrier (LEC) and ensure that the Loop start lines / PRI / SIP Trunks are operational with the Telephone system as an out route for local and long distance telephone system capabilities, contact awardee will ensure that the hunt group is operational with the new Telephone System prior to telephone system changeover.
Section 7: Site Specific requirements:
A. The contractor shall test and tone 10 days prior to installation, Contractor will test and tone each and all extensions and Central office wiring with the results provided to the Government in a final engineering report due upon completion of the installation. All jacks in the field will be labeled to their corresponding port with in the room and on the patch panel within the communication closet.
Pictures of every jack labeled in the field will be submitted as part of the closing documents and is a requirement of this performance work statement.
The contractor will be responsible for using existing wiring.
B. The New system will tie into a patch panel from the switch module and everything will be extended to the 66 OR 110 blocks ensuring that everything is labeled, Reroute wiring to patch panels so that the wiring and connections can be easily identified and better organized. ALL obsolete wiring/blocks shall be packed up by the awardee for shipment with a listed inventory and given to the site point of contact.
C. During the Solicitation Site Survey (SSS), the contractor shall evaluate the AC and DC power systems at all locations where work is being performed ensuring system will have ample power to operate the new telephone system. There are currently 4 Alarm lines that need to support from the LEC, The Contractor is responsible for ensuring that they are online and working Prior to cutover.
D. During the Solicitation Site Survey (SSS), the contractor shall evaluate the space requirement for their companies stated and preferred telephone system. Once the bid has been awarded the company that wins the bid is responsible for installing the system based on the space capacity of the required space. It is the bidder’s responsibility if they find it inadequate after the fact to make the system work in the designed space
8. THE CONTRACTOR SHALL REPAIR
AND/OR REPLACE ANY NONFUNCTIONAL
VOICE TERMINAL JACKS AND OR WIRING.
ALL VOICE TERMINALS MUST BE IN
WORKING ORDER FOR THE CONTRACT
TO BE COMPLETE.
A. The contractor shall use the existing main AC power service panel or sub-panels to the maximum extent possible. All new main telecommunication service panels shall be 120/208 VAC, three-phase system, dedicated feeder line, 5-wire, protective “green” wire ground from the main disconnect with a capacity to support all requirements with 25% spare breaker positions. Sub-panels shall be approved by the Government and shall be 120/240 VAC, single phase panels or 120/208 VAC, three-phase panels. A surge protection device shall be provided at the main telecommunications power panel to suppress lightning-induced voltage and current surges within the AC electrical distribution system. The surge suppressor shall be mounted directly beside its serving breaker.
B. The contractor shall provide formal training for all new systems provided under this SOW. The contractor shall prepare and provide a final Training Plan to include course descriptions, syllabuses, and training schedules NLT thirty (15) calendar days prior to the planned commencement of training. The contractor shall provide manufacturer certified courses for all operation and maintenance. On-site training is preferred. The contractor shall provide all necessary materials, documentation, manuals, and training aids. Training material shall be provided in hard and soft copies at the commencement of the training. At least one person shall be fully trained prior to cutover, and all training shall complete prior to project close out.
C. The contractor shall provide a detailed list of materials (including type and amount) of inside cable plant materials used (e.g., racks, cable ladders, Jhooks, jacks, faceplates, and feet of cable) used insuring that it is within the provided report. The final Engineering Report shall include a complete building floor plan with all station locations, to include red line drawing of cable pathways.
D. Deliverables are a requirement for a project to be paid out once project is finished. Deliverables will consist of the following: Rack layout photos, Phone data plate labeling photos to coincide with the patch panels labeling, Inventory warrantee records, main auto attendant flow charts, License Keys, IP addresses. Summary of record of system configurations, configurations files, extension phone assignments, hunt groups, short code dialing, user training agenda, a quick reference guide, quick administration Reference Guide, and an as built Documentation table of contents. Once the project is awarded the Government representative will email the winning bidder an example that the company will follow from past installations that they should follow
E. The contractor shall provide a full, unlimited Three year warranty for all contractor provided hardware/software, materials, and workmanship, which shall not begin until final Government acceptance of all items delivered under this SOW.
The warranty period shall begin after all discrepancies have been cleared and the continuous thirty (30) day Break-in of all systems delivered under this SOW. All discrepancies shall be corrected before the break-in period can begin or be restarted.
The warranty shall include emergency onsite technical assistance for diagnostics and troubleshooting for the first full year and will include labor. The contractor shall track and resolve the problem(s) in accordance with standard commercial practices. The contractor shall provide a Warranty Procedure Guide that includes phone numbers and addresses for repair and return, phone numbers for requesting remote diagnostics, and specific procedures for obtaining these services. The contractor shall also provide phone numbers, addresses and procedures for obtaining emergency replacement parts and an address for returning the defective items. It is expected that this information will be valid during the warranty and for life cycle support after the warranty has expired the contractor shall provide the Warranty Procedure Guide on each system delivered under this SOW before commencement of the thirty (30) day break-in.
F. In order to minimize the risk of the Government purchasing counterfeit products or unauthorized secondary market equipment, which would not be supported by the Original Equipment Manufacturer (OEM), and to ensure that the Government purchases only…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.