M67854-27-S-0015_PM GBAD_Commercial Solutions Opening (CSO).pdf
PDF 239 KB Posted
- Attached to
- Program Manager Ground Based Air Defense (PM GBAD) Defense Commercial Solutions Opening (CSO)
- Solicitation number
- M67854-27-S-0015
- Issued by
-
Department of Defense
About this file
This is a Commercial Solutions Opening (CSO) solicitation issued by the Program Manager Ground Based Air Defense (PM GBAD) under solicitation M67854-27-S-0015. The CSO is authorized under 10 U.S.C. § 3458 and DFARS Subpart 212.70 and enables PM GBAD to competitively procure mature commercial capabilities and technologies through a streamlined acquisition process. The CSO remains open for awards through November 18, 2031, and may be extended with an amendment. Awards will be structured as fixed-price contracts, including fixed-price incentive fee arrangements. PM GBAD seeks solutions that support its mission to field and sustain integrated ground-to-air defense solutions across four Product Manager groups: Medium Range Intercept Capability (MRIC), Future Weapons Systems, Fixed Site Counter-Unmanned Aircraft Systems (C-UAS), and Organic Counter small Unmanned Aircraft Systems (O-CsUAS).
The solicitation employs a multi-phased evaluation approach with Areas of Interest (AoIs) posted separately on SAM.gov. Phase 1 requires submission of solution briefs (maximum 15 slides) evaluated on technical merit, maturity of commercial technology, relevance to the AoI, feasibility, and testability. Offerors identified as meritorious in Phase 1 may be invited to Phase 2 for in-person or virtual pitches where they must address production rates, lead times, pricing/rough order of magnitude, data rights, and maintenance strategies. Selected offerors advance to Phase 3 for submission of full commercial solution proposals with separate technical and price sections; awards at this stage are fixed-price only. The Government will not provide comparative evaluations, debriefings, or post-submission feedback, and no reimbursement is offered for submission costs. Offerors must have DUNS and CAGE codes registered in SAM and must not be suspended, debarred, or prohibited from receiving federal contracts. Specific AoIs, Points of Contact, and submission details are provided in separate AoI postings.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION: DoW COMMUNITY ONLY
Program Manager Ground Based Air Defense (PM GBAD)
Commercial Solutions Opening (CSO)
Solicitation: M67854-27-S-0015
1.0 General Information
1.1 Authority
Authorized under 10 U.S.C. § 3458 and Defense Federal Acquisition Regulation Supplement (DFARS) Subpart 212.70, this CSO enables PM GBAD to competitively procure solutions through a streamlined acquisition process, allowing for rapid award decisions. This approach underscores our mission to expedite the award and delivery of critical technologies, ensuring that the Government can leverage advancements in manufacturing swiftly and efficiently. By prioritizing speed in our contracting efforts, we aim to support timely integration of cutting-edge technologies that advance operational readiness.
Contracts or agreements awarded under this authority will be structured as fixed-price, including fixed-price incentive fee. Through this initiative, the DoN will affirm its commitment to delivering superior capabilities to our Warfighters in an expeditious manner.
1.2 Program Manager Ground Based Air Defense (PM GBAD) Portfolio
PM GBAD consists of the following four (4) Product Manager (PdM) groups, each with their own distinct capability sets and needs: Medium Range Intercept Capability (MRIC), Future Weapons Systems, Fixed Site Counter-Unmanned Aircraft Systems (C-UAS), and Organic- Counter small Unmanned Aircraft Systems (O-CsUAS). The mission of PM GBAD is to “field and sustain fully integrated ground to air defense solutions that detect, track, defend and defeat the enemies’ air threats that seek to harm or kill Marines and other high value assets.” As such, the purpose of this PM GBAD CSO, addressed in detail through individual Areas of Interest (AOIs), is to seek mature commercial capabilities that can provide Marines with the advantage over the enemy in combat effectiveness and lethality.
1.3 CSO Procedures
Program Manager Ground Based Air Defense (PM GBAD) seeks to award various contracts and agreements that may include but are not limited to: FAR contracts under FAR Part 12, Commercial Procedures; non-FAR agreements such as transaction agreements under 10 U.S.C. § 4022; or Cooperative Agreements under 31 U.S.C. § 6305. The purpose is to acquire mature solutions and enabling technologies to influence and enhance the effectiveness of PM GBAD’s missions.
This CSO may result in awards to proposals for commercial technologies through 18 November 2031. The Government reserves the right to extend this CSO beyond the open until date and will issue an amendment if the authority is extended. This CSO may include awards for but are not limited to: immediately available commercial technologies; commercially available technologies fueled by commercial or strategic investment; concept demonstrations; pilots; and agile development activities that can incrementally improve commercial technologies, existing government-owned capabilities, or concepts for broad defense applications.
The CSO solicitation process may include a multi-phased solicitation and evaluation approach that is dependent upon specific Areas of Interest (AoIs). The AoIs are focused topic(s)/categories specified in Section 6. The following phases may be used:
Phase 1 – Submission of solution brief, Phase 2 – Pitch and/or demonstration (if applicable), and Phase 3 – Request for Commercial Solution Proposal (CSP)
The Government may add AoIs against this CSO at any time throughout its duration. Interested offerors are encouraged to frequently check www.SAM.gov for new AoI postings.
Please note this CSO is not like a traditional procurement under the Federal Acquisition Regulation (FAR). FAR-based competitive negotiation concepts such as opening, closing, discussions, clarifications, setting of a competitive range, proposal revisions, debriefings, etc., do not apply to this CSO. The Government will evaluate solutions briefs on a revolving basis (i.e., as they are received). This means there is no set time for submission of solution briefs other than the period of time for receipt specified in a given AoI. Any solution brief submitted outside the period specified in the relevant AoI may, at the Government’s complete and total discretion, be rejected without further action by the Government or notice to the offeror. Further, in accordance with DFARS § 212.7004, the Government will not and is not required to perform any comparative evaluations between or among solutions briefs received in response to an AoI posted within this CSO. Statutory competition requirements are satisfied by the fact that any interested offeror may submit a solution brief to an AoI for evaluation by the Government. The Government is not obligated and does not intend to provide offerors any sort of post-submission response (i.e., FAR-style unsuccessful offeror notifications, debriefings, or any other kind of post-submission feedback) regardless of whether a solution brief is selected for further evaluation, and the Government is not obligated to notify any offeror that its solution brief was not accepted for further evaluation.
The process under this CSO may result in a two- (2) or three- (3) phase approach (solution brief, pitch (if applicable), and a request for a CSP):
Phase 1 Solution Briefs: A solution brief must be submitted as specified in Section 3.2 of this CSO. The Government will evaluate solution briefs against the criteria stated in this CSO. The Government will not reimburse offerors for the costs incurred for solution brief submissions.
Phase 2 Pitch and/or demonstration (if applicable): Offerors whose solution briefs are evaluated to be of merit may be invited to provide a pitch following the instructions provided in Section 3.4 of this CSO. If the Government requires a solution demonstration in addition to a http://www.sam.gov/ pitch, additional information will be provided in the specific AoI highlighting those procedures;
otherwise, Phase 2 will be comprised solely of the pitch. The Government reserves the right to request additional technical and financial information to determine if a company has a viable solution for the Government’s specific AoI. The Government will not reimburse offerors for incurred costs associated with pitches, such as travel, unless otherwise stipulated.
Phase 3 Request for Commercial Solution Proposal (CSP): Those offerors that are evaluated to be of merit through Phase 1, Phase 2, or a combination of both, may be invited to submit a full written proposal following the instructions provided in Section 3.6 of this CSO. Requests for a CSP under this CSO are subject to the availability of Government funds. The Government will not pay offerors for costs associated with developing submissions in regard to this CSO or resulting AoI, unless otherwise stipulated within the AoI.
NOTE 1: The Government reserves the right to forgo Phase 2 based on the individual merits of the solution brief. The Government also reserves the right to move expeditiously through the phases based on the merit of submissions if urgent requirements arise.
NOTE 2: During any step of the CSO, the Government may send written questions or comments for the offerors to address via email, or other suitable communication methods as determined by the Government. Costs incurred by the offeror in responding to Government requests will not be reimbursed.
2.0 Definitions
1. “Area of Interest” (AoI) means an announcement posted on the Government Point of Entry website (www.SAM.gov), which may result in the award of various types of contracts that will be dependent on the specific AoI requirement.
2. “Commercial Solutions Opening” (CSO) is a competitive procedure that contracting and agreements officers may use to acquire commercial items, technologies, or services.
3. “Commercial Solution Proposal” (CSP) is a commercial proposal that is submitted in response to an AoI that is governed by a CSO. CSPs may be requested as a result of solution briefs and/or presentations/demonstrations.
3.0 General Guidelines and Evaluation Procedures
Submissions must be submitted electronically.
Offerors that are selected for the presentation phase or the CSP phase will be notified in writing as soon as practicable.
3.1 General Guidelines
1. Unnecessarily elaborate brochures or proposals are not desired.
2. Use of a diagram(s) or figure(s) to depict the essence of the proposed solution is strongly encouraged.
3. Offerors may submit multiple solution briefs in response to any single AoI if each submission represents a separate and distinct concept.
4. Technical data with military application may require appropriate approval, authorization, or license for lawful exportation.
5. All solution briefs, pitches, and proposals shall be unclassified. Solution briefs, pitches, and proposals containing data that is not to be disclosed to the public for any purpose or used by the Government except for evaluation purposes shall include the following sentences on the cover page:
“This [select one: Solution Brief, Pitch, or Proposal] includes data that shall not be disclosed outside the Government, except to non-Government personnel for evaluation purposes, and shall not be duplicated, used, or disclosed -- in whole or in part -- for any purpose other than to evaluate this submission. If, however, an agreement is awarded to this Company as a result of --or in connection with – the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent agreed upon by both parties in the resulting agreement. This restriction does not limit the Government's right to use the information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]”
Each restricted data sheet should be marked as follows:
“Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.”
1. Foreign-Owned businesses may independently submit a solution or do so as part of a teaming arrangement with one or more United States-Owned businesses. However, the ability to obtain an agreement based upon a submission may depend upon the ability of the Foreign-Owned business to obtain necessary clearances and approvals to obtain proscribed information.
2. Submissions must be submitted electronically.
3. Submissions sent through other channels or after the AoI period has ended will not be reviewed nor evaluated.
4. Solution briefs that are chosen for the Phase 2 pitch will be notified in writing as soon as practicable.
3.2 Phase 1 - Solution Brief
Solution briefs will take the form of briefing slides which should not exceed fifteen (15) slides.
Briefs will be held virtually or in-person in Quantico, VA; the coordination of date, time and in-person or virtual format will be made individually with each offeror and the Program Office during scheduling. Briefs should include at a minimum the Technical Requirements in Section
4.0 and the following:
Title Page (does not count against page limit)
Entity Name, Date, Point of Contact Name, E-Mail Address, Phone, Address, and CAGE code.
Specifically identify the AoI for which the solution brief is submitted.
Executive Summary of the solution (one slide)
Describe the concept and unique aspects of the technology as it relates to the AoI.
Identify whether the solution is an existing technology that has satisfied a pilot or demonstration (i.e., commercially ready and viable technology), or the if the solution will require development for defense application.
If development or adaptation is proposed, identify a suggested path to mature the technology.
Identify aspects of the solution which may be considered proprietary or Intellectual Property (IP)
3.3 Phase 1 - Solution Brief Basis of Evaluation
All solution briefs correctly submitted in response to an AoI will be evaluated against the stated criteria below.
1. (Y/N) The proposed solution is a mature commercially available technology. The offeror is encouraged to provide evidence of successful employment of the proposed solution by commercial customers, and, if applicable, government customers.
2. Relevance of the Solution brief in addressing the AoI.
3. Technical Merit and feasibility of the solution to address Government AoI problem statement. Offerors should identify any parts, subassemblies, or other portions of its technical solution that are manufactured in or rely on sources of supply from the People’s Republic of China, the Russian Federation, the Democratic People’s Republic of North Korea, the Islamic Republic of Iran or any country that is a state sponsor of terrorism and include any plans for developing alternative countries of supply for those items. Further, Offerors are hereby on notice that any contract awarded pursuant to this CSO will be subject to all foreign sourcing restrictions contained in various FAR and DFARS clauses.
4. A quick, reasonable, and efficient way exists for DoW to test the commercial solution, within a specified duration, whether outside or integrated within DoW infrastructures or networks, as appropriate. Offerors are also encouraged to provide evidence via submission of existing formal test reports if it believes another DoW entity has already performed such testing successfully.
Solution briefs will be evaluated on the basis of the merit of the proposed concept in addressing the AoI, not against other solution briefs submitted in response to the same AoI. Additionally, while not overtly stated in AoIs, the Government’s evaluation will consider whether the proposal increases the likelihood of accomplishing PM GBAD’s mission.
All submissions will be evaluated, however, only a select few will be invited to pitch. The Government reserves the right to limit the number of entities invited to pitch. As such, a company’s solution may be evaluated to be of merit but not invited to pitch. Solution briefs that are chosen for the Phase 2 pitch will be notified in writing as soon as practicable.
3.4 Phase 2 – Pitch and/or demonstration (if applicable)
In Phase 2, entities shall provide an in-person or virtual pitch to provide further details on their proposed commercial solution and the technical and business viability of the proposed solution.
The Government may elect to use external market research during the pitch to evaluate viability.
The Government may elect to request a demonstration; if so, additional information will be provided in the specific AoI highlighting those procedures. In addition to the pitch, the Government, at its discretion, may request for consideration an additional written submission to further supplement the information provided in the Phase 1 solution brief. During the Phase 2 pitch, the offeror must detail/address:
• Estimated monthly production rate and lead time with scalability
• Rough order of magnitude (ROM) or pricing. If historical pricing or contracts are available, the Government requests the Company annotate the contract number(s).
• Anticipated Data Rights Assertions
• Maintenance strategy (e.g., LRU replacement; Return Merchandise Authorization (RMAs) processes; repair turn around time (RTAT))
• During the pitch, the Government may request the additional information/detail with respect to the information provided in the Phase 1 solution brief.
• Pitches may be held at the Government facility and/or offeror facility at the Government’s option. The coordination of date, time, location and format will be made individually with each offeror and the Program Office during scheduling.
3.5 Phase 2 – Pitch Basis of Evaluation
Individual pitches will be evaluated against the following factors:
1. Relevance of the pitch in addressing the AoI and the ability of the presenter to adequately address Government questions or concerns regarding the proposed application or use of the commercial solution. The solution has technical merit, adequately & realistically addresses Government need and can be quickly incorporated into DoW systems.
2. The associated delivery schedule is expeditious and realistic.
3. The offeror shall submit no more than three (3) summaries of recent contracts or agreements that are similar to the effort identified in the AoI with respect to size, scope and complexity.
4. Reasonableness of the ROM.
Individual pitches will be evaluated on the basis of the merit of the proposed concept in addressing the AoI and the factors above, not against any other pitches held under the same AoI;
however, the Government is not required and does not intend to create a formal, extensive evaluation of the pitch, and the Government will not under any circumstances provide any offeror a copy of any written evaluation materials. The Government will evaluate the offeror’s proposed solution on how well the offeror demonstrates an understanding of the work to be performed or the technical solution required. The Government will evaluate the offeror’s proposed delivery schedule against the needs of the Marine Corps and its realistic approach. The Government will evaluate the offeror’s recent past performance record to determine the level of confidence the Government has that the offeror will successfully perform the requirements. The Government will then rate the offeror’s past performance as either acceptable or unacceptable.
Offerors without sufficient record of past performance may be viewed less favorably than those with acceptable records and will be viewed more favorably than those with unacceptable records.
The Government will utilize the factors above to identify the best value submission(s). In making this decision, the Government is more concerned with obtaining submissions demonstrating superior technical merit based on non-cost factors at a reasonable cost/price or ROM. Pitch submissions will be valid for 180 calendar days after the pitch date. Upon completion of evaluations, the Government will notify the company that: (1) the proposed solution has been selected for possible award and the company is invited to submit a full proposal; (2) the proposed solution is not of interest to the Government; or (3) the proposed solution is of interest, but not eligible for a proposal due to availability of Government resources.
If the proposed commercial solution is of interest, but not eligible for a proposal due to limitation of Government resources, the Company may be contacted with a request to respond to proposal request within 180 calendar days from the pitch date. If after 180 calendar days from the pitch date (or earlier if notified by the Agreements Officer), Government resources are not identified to formally move into Phase 3, the company will no longer be eligible for an award under that particular AoI.
3.6 Phase 3 – Commercial Solution Proposal
3.6.1 Phase 3 Proposal Content
The final phase of the evaluation process is the proposal request. Based upon the evaluation process detailed in Phase 1 and 2, the Government may request a written commercial solution proposal. The company will be invited to develop and submit a full written proposal and negotiate appropriate terms and conditions. Entities may discuss ideas and questions related to the proposal with the Government POC during the proposal writing process.
Each proposal submitted shall consist of two sections: Section 1 shall consist of the technical proposal; Section 2 shall consist of the price/cost/schedule. Proposals will be assessed by PM GBAD technical and contracting subject matter experts. Awards made under this authority will only be issued as fixed price awards in accordance with 10 U.S.C. § 3458(c) and DFARS 212.7002(b).
3.6.2 Technical Proposal
At a minimum, written proposals must contain:
• Title Page
• Company Name, Point of Contact Name, Date, E-Mail Address, Phone, and Address and any subcontractors or team members. Include an abstract which provides a concise description of the proposal.
• Description of the proposed commercial solution
• Provide a detailed software sustainment strategy, to include licensing
• Background and objectives of the proposed solution, deliverables, and resources needed to execute. Include the nature and extent of the anticipated results. Include ancillary and operational issues such as certifications, algorithms, and any engineering/software development methodologies to be used.
• Address the requirements within the Statement of Work or Performance Work Statement to be provided by the Government upon entering Phase III.
• Any production award may include comprehensive support and sustainment agreements.
Offerors must account for an initial integration strategy and necessary Intellectual Property (IP) /Data Rights in their proposals.
• Provide a detailed project schedule that outlines the various phases of work to be accomplished within the proposed period of performance. You may refer to the Solution Brief that prompted this proposal request, but do not duplicate it.
• Identify any Government material, equipment, data, or other items necessary.
• Offerors are requested to address their capability and willingness to provide lifecycle sustainment support, including but not limited to long-term hardware maintenance, software updates, and supply chain logistics for up to a five-year period of performance.
These services do not need to be priced in the proposal; however, the Government requests the capability for providing the services be addressed in the technical proposal.
3.6.3 Price Proposal
The company shall propose a fixed price for the item or service and provide any data or supporting information necessary for the determination of a fair and reasonable price. This can include, but is not limited to, commercial price catalog or other proprietary information to help the Government assess the proposed price.
3.7 Phase 3 – Commercial Solution Proposal Basis of Evaluation
3.7.1 Proposal Evaluation Rating:
1. The technical proposal volume will be evaluated and assigned one of the following ratings:
a. Acceptable: The proposal has been evaluated and determined to be appropriate for additional consideration and discussion. An acceptable proposal is generally considered well-conceived, scientifically or technically sound, and important to program goals and objectives. An acceptable proposal may proceed into negotiations or directly to the award process. NOTE: An acceptable rating does not guarantee contract award. The following will be taken into consideration: program priorities, outcome of negotiations, and availability of funds.
b. Unacceptable: The proposal has been evaluated and deemed inappropriate for additional consideration. An unacceptable proposal is generally considered not well-conceived, scientifically or technically unsound, or does not meet program priorities. An unacceptable proposal will be rejected.
2. The price proposal volume will be evaluated as follows:
a. Affordability: The proposed costs must also be affordable to the Government in order to be considered for award and that affordability determination is at the sole discretion of the Government regardless of the whether appropriated funds of any kind have been made available for the procurement. The technical merit of the proposal may dictate the level of scrutiny required for a price analysis, however cost alone may be a sufficient reason for the Government to decide not to award a contract. The following will be taken into consideration: program priorities, outcome of negotiations, availability of funds and fair and reasonableness. A price and/or cost evaluation will only be made in the event for an offeror is selected for an award in Phase 3.
4.0 Awards
4.1 General Guidelines
Upon favorable review and available funds, the Government may choose to make an award, multiple awards or no award. Only warranted Contracting Officers may obligate the Government by entering into or modifying a binding contract on behalf of the Government.
Awards made under this CSO will be FAR-based and fixed price. Contract type will be determined during Phase 3. Multiple awards may be made to pursue similar or dissimilar solutions should they all meet the technical criteria, be selected for award, and if funds are available.
Haack, Chad W CIV USMC OTHER POR (USA) Added to align with APWS
Entities must have a DUNs and CAGE Code registered in the System for Award Management (SAM) to receive award. Offerors are advised to commence SAM registration upon receipt of a proposal request.
Awardees must be determined to be responsible by the Contracting and must not be suspended or debarred from award by the Federal Government nor be prohibited by Presidential Executive Order and/or law from receiving award.
Receipt of a proposal request does not guarantee receipt of award. The Government reserves the right, at any point prior to award, to cancel the request. Upon receiving an award, awardees must register in the prescribed Government system (e.g. Procurement Integrated Enterprise Environment (PIEE)).
4.2 Procurement Integrity Act (PIA)
The CSO solicitation process for FAR contracts is covered by the PIA. PIA is implemented for FAR contracts through FAR 3.104. Accordingly, the CSO competitive solicitation process and awards made thereby must adhere to the ethical standards required by the PIA.
4.3 Follow-on Production Contract
At the Government’s sole discretion, after the initial contract award made pursuant to 10 U.S.C. § 3458(a), the Government may decide to award a follow-on production contract or agreement under the authority of 10 U.S.C. §3458(c).
5.0 Point of Contact (POC) Information
CSO POCs: Contracting/Agreements Officers: Megan Brady, megan.brady.civ@usmc.mil and Stasia Baker, stasia.baker@usmc.mil.
Questions regarding the objectives or preparation of the solution brief(s) should be addressed to the Points of Contact (POCs) listed in the respective AoI.
6.0 Specific Areas of Interest (AoI)
Specific AoIs will be posted as separate documents. All solution briefs received under a specific AoI will be evaluated in accordance with Section 3.0 above.
NOTE: If Government funding and/or resources are unavailable for the proposed effort, all brief(s) and submitted material will be retained by PM GBAD.
mailto:megan.brady.civ@usmc.mil mailto:stasia.baker@usmc.mil
File details come from the government source that posted it. Updated .