NGT_Draft_RFP_Q&A.pdf

PDF 374 KB Posted

Attached to
Next Generation Troposcatter Federal contract opportunity
Solicitation number
M67854-19-R-2000
Issued by
United States Marine Corps

About this file

This document contains a question and answer file related to a draft request for proposal for a Next Generation Troposcatter system requirement. Key details include that the solicitation number is M67854-19-R-2000 and is being issued by the United States Marine Corps on behalf of Marine Corps Systems Command located in Quantico, Virginia. The requirement is for a Next Generation Troposcatter system to modernize current troposcatter capabilities. Questions were accepted until May 6, 2019 and addressed performance specifications around size, weight, power requirements, setup times, the use of generators and mobile grounding solutions, and EMI standards. Clarification was also provided around opportunities for industry to measure vehicle dimensions and the inclusion of travel to Quantico, Virginia.

Q&A

View the file

Other files for this federal contract opportunity

Other files attached to Next Generation Troposcatter, newest first.
File Type Posted
M67854-19-R-2000_NGT_Draft_RFP.docx DOCX document
M67854-19-R-2000_Attachment_5_DD_254.pdf PDF
M67854-19-R-2000_Attachment_3_-_SB_Part_&_Comm_Strat.docx DOCX document
M67854-19-R-2000_Attachment_1_-_PSPEC_Compliance_Matrix_Template.xlsx XLSX spreadsheet
M67854-19-R-2000_Attachment_2_-_SB_Subk_Record.docx DOCX document
M67854-19-R-2000_Attachment_4_-_PSPEC.PDF PDF
M67854-19-R-2000_Exhibit_1_CDRLs.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question

Number Solicitation Section

Document / Page /

Paragraph / Line Number Comment/Questions Response

1 3.10.4 PSPEC / Page 16 / 3.10.4

M67854-19-R-2000_Attachment_4_-_PSPEC does not denote Section 3.10.4 as an Objective requirement. The PSPEC_Compliance_Matrix_Template.xlsx file denotes 3.10.4 as Objective. Please clarify.

Updated the Compliance Matrix to reflect Threshold for this requirement

2 3.6.1.5 PSPEC / Page 8 / 3.6.1.5

Should the Offeror assume the USMC Common Hardware Suite (MCHS) general purpose laptop referenced in the M67854-19-R-

2000_Attachment_4_-_PSPEC Section 3.6.1.5 is provided as GFE?

Yes, if required. The Offerors will need to provide the performance requirements for the laptop as part of their proposal.

3 3.6.1.11 PSPEC / Page 9 / 3.6.1.11

Modern Internet Protocol (IP)/Ethernet based networking does not provide a means for performing traditional loopback testing similar to a serial based solution. Can Internet Control Message Protocol (ICMP) diagnostic tools, like ping and traceroute, be used to meet this requirement?

There is no change to the loopback requirement.

PSPEC 3.4.1 PSPEC

3.4.2 Note 7 Section 6

PSPEC / Page 6 / 3.4.1,3.4.2

M67854-19-R-2000_Attachment_4_-_PSPEC Section 3.4.1 & 3.4.2 states setup "(including auto alignment)". Note 7 Section 6 states that setup does not include auto alignment. As worded, the requirement contradicts itself.

Recommend the Government remove the "(including auto alignment)" from sections 3.4.1 and 3.4.2 and provide a separate requirement for auto alignment.

Changes have been implemented and will be incorporated in the RFP.

5 L-1.4.3 DRFP / Pg 106 / Paragraph 3 To develop a delivery schedule most advantageous to the Govt, can the

Government provide Offerors the current NGT fielding plan?

No fielding plan will be provided.

6 Attachment 4 PSPEC

NGT System Performance

Specification, Section 3.4, Page

The specified setup and alignment times do not state requirements for using cold weather kit or the use of a range extension kit. Can the Government please confirm that section 3.4 does not apply to the cold weather kit/warm up time and range extension kit?

No change to the requirement. This requirement does apply to the cold weather and range extension kits.

7 Attachment 4 PSPEC

NGT System Performance

Specification, Section 3.5.1, The dimensions of the M1097A1 HMMWV includes the area above the cab up to the canopy as long as the cargo can be safely secured for transport.

Note 9 states a cargo area that is 39.1” high. Recommend that the height be increased to 60” (the height inside the cargo bay canopy) as this is commonly done for secured cargo and increases the likelihood of fitting the combined system into one HMMWV. Will the Government revise Note 9 to include cargo up to 60”?

Changes have been implemented and will be incorporated in the RFP. The Offerors will be given the opportunity to view and measure both the HMMWV and JLTV after release of the

RFP and before the proposals are due.

8 Attachment 4 PSPEC

NGT System Performance

Specification, Section 3.5.1, Can the Government provide the opportunity for industry to measure the dimensions for the JLTV cargo area prior to the final RFP?

Yes, the Offerors will be given the opportunity to view and measure both the HMMWV and JLTV after releasing the RFP and before the proposals are due.

9 Attachment 4 PSPEC

NGT System Performance

Specification, Section 3.10.4, The compliance matrix template calls out these EMI requirements of section

3.10.4 as Objective but the PSPEC does not list these requirements as

Objective. Are these EMI requirements Threshold or Objective?

Updated the Compliance Matrix to reflect Threshold for this requirement

M67854-19-R-2000 NGT

Presolicitation Notice and Draft Request for Proposal (RFP)- Q&A

10 Attachment 4 PSPEC

NGT System Performance

Specification, Section 3.11, Page

The site Grounding requirement called out is for fixed facilities. It is also impractical to control the soil in every condition to meet the grounding requirements. Recommend allowing for implementations that use a DoD approved mobile/transportable system grounding solutions such as ground rod, MK-2551 A/U SWGS, etc.

No change to the requirement; however, the DoD approved mobile/transportable system grounding solutions are acceptable.

11 Attachment 4 PSPEC

NGT System Performance

Specification, Section 3.2.1

Antenna, Page 4

Does the Government desire a mast system for the antenna? Systems with masts provide customers with more flexibility in deploying the system to avoid local low height obstructions such as bushes, berms, equipment and fences which are unavoidable in most tactical field environments.

There is no change to the requirement.

12 M67854-19-R

Section L-1.3.2 E.8 Table 2, Volume VI section 6.2 Pricing

Workbook

Would the Government consider providing a draft cost model to industry prior to final RFP?

No change or additional detail will be provided.

13 M67854-19-R Section E

Would the Government consider defining Marine Corps Logistics Base

Albany (or other single CONUS location) as the FOB Destination for all material deliveries? Alternatively, would the Government consider FOB Origin for all material deliveries?

Defining a single location will reduce the logistics burden on both the

Government and Contractor. For example, power sources, infrastructure, tooling, personnel, etc.

No change or additional detail will be provided.

14 Attachment 4 PSPEC

NGT System Performance

Specification, Section 3.3.3.3, Can the Government please confirm that the 10kW generator limit does not apply to the cold weather kit or range extension requirement? (3.2.2.3)

No change. The 10kW generator requirement does apply to the cold weather and range extension kits.

15 Attachment 4 PSPEC

NGT System Performance

Specification, Section 3.4, Page

Setup and Joining the Network (including Antenna Alignment) is written as one combined requirement. Note 7, however, defines setup as complete when the system is ready for self-alignment. Additionally, in order to perform self-alignment and establish a link (“join the network”), both sides of the link must be setup. Recommend splitting this into 2 requirements: 1. Setup; 2. Self-alignment and link establishment. In this case, we would recommend 1. Setup time of 30 min and 2. Self-alignment and link establishment of 45 min.

Changes have been implemented and will be incorporated in the RFP

16 Attachment 4 PSPEC

NGT System Performance

Specification, Section 3.2.3.2, Are there any channel size limitations for X-band? No change or additional detail will be provided.

17 M67854-19-R-2000 Section C, Paragraph 3.1.6 Can the Government add Quantico VA as an expected travel location?

Changes have been implemented and will be incorporated in the RFP.

18 M67854-19-R-2000 Section C, Paragraph 3.1.7

Will DFARS Clause 252.204-7012 Safeguarding Covered Defense

Information and Cyber Incident Reporting be invoked on the resulting contract? If so then we would expect this clause to be replaced by the

DFARS clause process, can the Government confirm?

Yes, DFARS clause 252.204-7012 has been added to the RFP and will be in the resulting contract.