190311_SOW_and_CLINs_Mag_Pouch.docx

DOCX document 24 KB Posted

Attached to
Rifle Magazine Pouch Federal contract opportunity
Solicitation number
M67854-19-R-1549
Issued by
United States Marine Corps

About this file

Attachment 01 - SOW and CLINs

View the file

Other files for this federal contract opportunity

Other files attached to Rifle Magazine Pouch, newest first.
File Type Posted
190425_Attachment_02_Provisions_and_Clauses_Mag_Pouch_(Amendment_0005).docx DOCX document
190328_19R1549_Industry_QAs.xlsx XLSX spreadsheet
190325_19R1549_Industry_QAs.xlsx XLSX spreadsheet
190320_19R1549_Industry_QAs.xlsx XLSX spreadsheet
190311_Attachment_03_Proposal_Submission_Form-Mag_Pouch.docx DOCX document
190311_Attachment_02_Provisions_and_Clauses_Mag_Pouch.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M67854-19-R-1549 Attachment 01

Rifle Magazine Pouch

SCHEDULE OF SUPPLIES / STATEMENT OF WORK / DELIVERY REQUIREMENTS

1. SCHEDULE OF SUPPLIES

CLIN
Description
Maximum Quantity
Unit of Issue
Rifle Magazine Pouch (Pre-Production Validation)- Coyote
5
Each
0002
Rifle Magazine Pouch (Pre-Production Validation)- Woodland MARPAT
5
Each
0003
Rifle Magazine Pouch

(Production)

150,000
Each
000301
Rifle Mag Pouch in Coyote
-
000302
Rifle Mag Pouch in Woodland
-

1.1 CONTRACT MINIMUM AND MAXIMUM LIMITATIONS

Minimum: (All CLINs Combined): 50,010 each Maximum: (All CLINs Combined): 150,010 each

1.2 CONTRACT ORDERING PERIOD

The contract ordering period will be for 60 months, beginning at time of contract award.

2. STATEMENT OF WORK

2.1. SCOPE. This Statement of Work (SOW) sets forth the efforts required to deliver the Rifle Magazine Pouch. The Contractor shall provide all of the specific material, services, documentation, and support to complete the tasks identified in this SOW.

2.2. DOCUMENTS

2.2.1 Non-Government documents. The following document forms a part of this specification to the extent specified herein.

ASTM-D-3951, Standard Practice for Commercial Packaging

2.3. REQUIREMENTS

2.3.1 The Contractor shall furnish the services, personnel, facilities, equipment and materials required to produce and deliver the Rifle Magazine Pouch, status reports and any additional requirements outlined set forth in this solicitation.

2.3.2 Commercial Item Description. The following Physical, Fit, and Function Attributes shall be required:

1. Must be a double magazine pouch (Threshold (T)). The double magazine pouch can be modular and be broken into two single, stackable magazine pouches, however the price and weight must be representative of the double magazine configuration. Availability of a single magazine pouch configuration of the proposed double magazine solution (Objective (O)).

2. Must accommodate the 30 round MAGPUL M4/M16 magazine and standard 30 round M4/M16 Aluminum magazines (T). Capable of expanding to accommodate the 40 round MAGPUL M4/M16 magazine (O) and/or capable of expanding to accommodating an AK Magazine (7.62) (O).

3. Must be compatible with the current Pouch Attachment Ladder System (PALS) for attachment to current load bearing equipment. Must allow for the system to be attached/detached to a PALS platform without special tools, excessive force, and excessive time (T). Must be able to be attached to a PALS platform under 3 minutes and detached under 3 minutes (O).

4. Must retain the magazine(s), with either one or two magazines in the pouch, during normal combat operations (T).

5. Must allow a single magazine to be smoothly drawn from the pouch with one hand while attached to a body armor vest without the second magazine coming loose from the pouch (T).

6. Must allow two magazines to be inserted into the pouch without excessive force or modification of the pouch (T).

7. Must be configurable to allow for a single Marine to carry a minimum of 6 magazines on his/her person (T).

8. Must be available in Coyote and Woodland MARPAT.

9. Must be comprised of materials that meet current Near Infrared requirements for both colors specified (T). See Attachment 03.

10. Must be compliant with the Berry Amendment (T).

11. Must be lighter than 0.24 lbs (T)/0.20 lbs (O) for a double magazine pouch.

12. Must not provide significant noise signature (T).

2.3.3 Pre-Production Validation (PPV). PPV demonstrates the suitability of the Contractor's production processes for achieving the requirements in the Commercial Item Description. The Government will conduct PPV before authorizing production. The Contractor shall deliver 10 Rifle Magazine Pouches (5 Coyote and 5 Woodland MARPAT) as pre-production samples no later than 60 days after contract award for Government inspection against the Commercial Item Description. The samples must meet all Commercial Item Description requirements. Upon the Government’s receipt of the samples, the Contractor can expect PPV to last approximately ten business days. If samples do not pass inspection, the Government may require the Contractor to provide another 10 Rifle Magazine Pouches at the Contractor's expense and the Government will repeat the PPV process. All expenses the Contractor incurs preparing for retesting or revalidation processes shall be at the Contractor's expense and at no additional Government expense. Under no circumstances is the Contractor authorized to proceed into production without the cognizant Contracting Officer’s written authorization. If the Contractor fails PPV, the Government reserves the right to terminate the contract for cause at no additional Government expense.

The Contractor shall produce all production systems it submits after PPV approval using the same raw material suppliers, raw materials, materials, subcomponents, processes, procedures, equipment, and facilities that resulted in delivering the acceptable PPV systems. For any change to the approved PPV systems or its material suppliers, raw materials, materials, subcomponents, processes, procedures, equipment, or facilities, the Contractor shall provide a written request to the Contracting Officer proposing the change. Before implementing any changes, the Contractor shall receive approval from the Contracting Officer.

2.3.4 Quality Assurance/Quality Control (QA/QC) System. The Contractor shall have a quality control system. The Contractor shall implement, document, and maintain document records for the quality control system it uses while performing under this contract during the performance period. The Contractor shall make available pertinent quality control documentation for the Government to review upon request. The Government reserves the right to discuss the plan with the Contractor, especially if there are areas of concern or increased risk.

3 PRODUCTION RATES AND DELIVERY LOCATIONS

3.1 The Contractor shall be able to produce a minimum of 10,000 pouches/month within 60 days of receiving production authorization.

3.2 CLIN 0001, Rifle Magazine Pouch – Coyote (Pre-Production Validation Samples), quantities shall be delivered to the following location no later than 60 days after contract award:

Marine Corps Systems Command Attn: Steven Fontenot 2201 Willis St.

Quantico, VA 22134 DoDAAC: M67854

3.3 CLIN 0002, Rifle Magazine Pouch – Woodland (Pre-Production Validation Samples), quantities shall be delivered to the following location no later than 60 days after contract award:

Marine Corps Systems Command Attn: Steven Fontenot 2201 Willis St.

Quantico, VA 22134 DoDAAC: M67854

3.4 CLIN 0003, Rifle Magazine Pouch (Production), quantities shall be delivered to the CONUS location(s) specified in the resultant delivery order(s).

File details come from the government source that posted it.