Attachment_14_QASP.pdf
PDF 209 KB Posted
- Solicitation number
- M67854-16-R-4001
- Issued by
-
United States Marine Corps
About this file
Attachment 14 NACCR QASP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NACCR_AMENDMENT_0002_17_OCT_2016.pdf | ||
| Attachment_15_MCSC_SIAT_RMF_Process_Guide_20160525.pdf | ||
| NACCR_CONTRACT_DATA_REQUIREMENTS_Final_5_oct_16.pdf | ||
| NACCR_Questions_and_Answers_05_Oct_FINAL.pdf | ||
| NACCR_Amendment_0001_(MOD_DOC)_10-6_NRJ_RELEASED.pdf | ||
| Attachment_1_of_52.212-1.xlsx | XLSX spreadsheet | |
| NACCR_CDRLs.pdf | ||
| M67854-16-R-4001.pdf | ||
| Attachment_2_of_52.212-1.xlsx | XLSX spreadsheet | |
| Attachment_3_Of_52.212-1.xls | XLS spreadsheet | |
| Draft_NACCR_PWS_25_Aug16.pdf | ||
| NACCR_PRESOLICITATION_NOTICE__25_August_2016_Final.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Requirements Summary (PRS) Quality Assurance Surveillance
Plan (QASP)
NACCR
2 September 2016
PWS
Para.
Desired
Outcome
Requirement/
Service
Performance
Standard
Acceptable Quality
Level (AQL)
3.1, 3.1.1 and
3.1.2
Program
Management, Post
Award Conference
(PAC) Agendas, Briefing slides, Weekly Meetings and minutes
The Contractor shall conduct and participate in scheduled virtual and on-site meetings, conference calls, present briefings, provide progress overviews, and host a multi-day Post
Award Conference PAC, in the National Capital
Region. The contractor shall provide a PAC agenda, and presentation brief. The contractor shall conduct weekly meetings to provide and discuss status updates, findings, milestones, significant actions, issues or concerns, overall project status, and the discrepancy list.
Meetings and conference calls coordinated, briefings approved by government prior to the start of the meeting, meeting minutes are complete and on time.
For PAC:
- Technically edited documents completed in accordance to templates and standards available for review.
- Complete preliminary
CWBS and technical solution available for review.
-Preliminary system-level engineering document package available for review.
- Solution performance specifications, interface requirements, and preliminary allocation of
HW/SW are identified for review.
Acceptable performance has been met when the quality of the overall technical management strategy provides the ability to identify and preclude problems, or resolve issues; and their use of resources meets customer expectations and schedules supports program goals.
Draft Program Management documents will be delivered no less than 90% complete and on time in accordance with the agreed upon schedule. Final draft documents will be delivered
100% complete within one week of receipt of the document’s due date.
3.1.3 Project Plan
The contractor shall provide a Project Plan for the implementation of the
NACCR Project that includes project phases for each installation location/site work tasks, timelines, milestones, actions that will be taken to mitigate risk to cost, schedule, performance and resources, and contractors approach to configuration management.
Project plan and
Contractor Work
Breakdown Structures are developed, implemented, maintained, updated and current. Risk tracking and the identification of risks are accurate and up to date.
Milestone elements properly identified and tracked. Actuals vs.
planned and completion dates correctly tracked.
Percent completed early/on-time/late, quality and completeness.
Acceptable performance has been met when project plan is developed and maintained at 85% accuracy and that properly represents the project management plans; managing project resources; establishing and implementing management plans, tasks, work products including performance measurement systems; and approving and implementing changes to project baseline schedule and plans and configuration management has been documented and maintained.
Desired
Outcome
Requirement/
Service
Performance
Standard
Acceptable Quality
Level (AQL)
3.2, 3.2.1, 3.2.2, and
3.2.3
Design, Technical
Reviews, Test
Readiness Reviews for SQT Briefing
Presentation, Site
Specific TRR
Briefing
Presentation System
Verification
Reviews, EEVE
Peer Review, NIR
Design Briefing
Presentation, Engineering
Acquisition Support and System
Documentation
Location Specific
Engineering
Document Package
The Contractor shall conduct technical and test readiness , System verification, EEVE Peer, NIR reviews and develop a
System-level and Site-level
Engineering documentation packages, that define the system and systems
Architecture and design, required network services, sub-systems, interfaces, configurations, data flows, power and space requirements, operating systems, HW/SW requirements, IPs, cabling, systems engineer plans;
program environmental, safety and health evaluation; safety documentation; test and evaluation strategy;
requirement traceability matrix; system specification; Cybersecurity
Assurance Strategy;
Information Support Plan, and Architecture Views.
The Contractor shall review and comment on
Engineering Change
Proposals requests for configuration and technical data management support.
The Contractor shall participate in Integrated
Product Team meetings and develop strategy documentation to support the NACCR implementation.
The contractor will coordinate cross functional meetings to draft and complete NACCR documentation in accordance with SETR handbook and other system engineering guidance all documentation (Statutory and Regulatory) as applicable to the project and its ACAT designation.
The Contractor will assist in the entrance and exist of
Technical Reviews, Tests, and Design and Document
Reviews. The contractor will Engineer, Furnish, Install, Secure, and Test
(EFIST) and make operational any ancillary equipment required to support this effort (such as cables, firmware, interfaces, wiring blocks, applications, and racking) to provide a complete solution. Additional standards are identified in each Task Order.
Engineer Documents will be delivered no less than 90% and on time in accordance with the agreed upon schedule. All information provided is current and in the approved template/format.
Technical reviews and meetings are set up in advance to the start time of the meeting. Corrections to documents are done on time and are complete.
Desired
Outcome
Requirement/
Service
Performance
Standard
Acceptable Quality
Level (AQL)
3.2.4 Implementation Plan
Dev 410s
The contractor shall develop Implementation
Plans that details their processes for the implementation of NACCR into the EEVE lab and the
NCR to include the management infrastructure.
Plans shall include contractor details on methods and procedures for the deployment, installation and transition of NACCR at each site.
The implementation plan
(Dev 410s) will at a minimum include: -
NACCR solution overview and system description, tasks involved in the implementation, planning and coordination assumptions, site resources (facilities, materials, and personnel) to install, configure, test, operate, train, sustain and support NACCR, Facility
Assessment timing and assumptions, Details on preparing site facilities to include switch configuration changes, Measures to ensure that all prerequisites have been fulfilled, Criteria for successful completion of the task, Site-specific implementation requirements. Additional standards are identified in each Task Order.
Implementation plan(s) (Dev
401) will be delivered no less than 90% complete and on time in accordance with the agreed upon schedule. All information provided is current and in the approved template/format. Site coordination and planning is complete and documented in the implementation plan. .
Corrections to documents are done on time and complete.
Successful site coordination and capability delivery completed as agreed upon. .
Complete installation of equipment within the agreed time.
Desired
Outcome
Requirement/
Service
Performance
Standard
Acceptable Quality
Level (AQL)
3.2.5, 3.3
3.4 and
3.4.1
Network Access
Control System
Requirements, Installation Services
& Support & Site
Implementation
The contractor shall install
NAC systems at specified locations. The contractor shall EFIST and make operational a fully functional, turn-key, NAC system and an administration terminal.
This implementation shall include programming, installation, applications, data transfer/migration and entry, hardware, software, ancillary equipment, parts, training, and material for all identified services and requirements. The system shall be capable of performing those functions and operating standards identified in Section 4.2 of
CWBS.
NAC system availability, as pertains to the contractor’s area of responsibility, shall be assessed on all contractor installed equipment and cabling. The NAC systems shall meet the capabilities in the NACCR
SSS to be fully operational. The contractor shall integrate the NAC appliance with network timing source for time synchronization and integrate on-site interfaces for receipt and delivery of compliance and remediation activities/tasks. Personnel performing site
Implementation DODI
IASAE Level-II are required to maintain certifications
Acceptable performance has been met when the government accepts the
NACCR capability at each site. The system shall not interfere with NGEN's ability to meet the sustainment
(availability) KPP when the authorized end user device is compliant.
Desired
Outcome
Requirement/
Service
Performance
Standard
Acceptable Quality
Level (AQL)
3.2.6
Facility
Assessment(s)
The contractor shall conduct a Facility
Assessment for each specific installation site.
Facility Assessment
Report will accurately describes the existing site conditions, identifies potential installation problem areas to include the Government’s readiness to proceed, and practicality of existing system reuse. The Facility
Assessment Report shall include a section that identifies facilities improvements required for implementation of the
NAC solution. Existing drawings, diagrams, and other Government
Furnished Information
(GFI) will be available for review through the site point of contact during the
Facility Assessment.
The Facility Assessment
Report shall be submitted no later than (NLT) seven working days after Facility
Assessment has been concluded.
Desired
Outcome
Requirement/
Service
Performance
Standard
Acceptable Quality
Level (AQL)
3.3, 3.3.1, 3.3.2, 3.3.3 and
3.3.4
Testing
Cybersecurity
Support
Product Acceptance
Test
System Qualification
Test
Site Acceptance Test
The contractor shall perform testing and
Cybersecurity of the delivered system to validate that the Government specifications have been met. Coordinate and schedule Test activities.
The contractor shall conduct a Product
Acceptance Test (PAT) in the EEVE lab.
The contractor shall participate in the
Government evaluation of the solution in the NCR.
The contractor shall create site specific test plans, procedures and reports for each Site Acceptance Test and present preliminary test results as part of each site-specific TRR prior to the beginning of the test event.
Marine Corps Order (MCO)
5239.2B establishes an information systems lifecycle management approach to protect critical
Marine Corps information.
The contractor shall execute to the requirements within this order and in accordance with the latest releases or revisions of the cybersecurity policies located in Section 4.3. of the PWS.
Attain and maintain the
NACCR IATT and ATO.
Harden and configure
NACCR in accordance with Defense Information
Systems Agency (DISA)
Security and Technical
Implementation Guides
(STIG) to include automated and manual settings.
Conduct ACAS scans using the DISA Field
Security Operations (FSO) scan policy (GFI) and latest ACAS plugin definitions available on the
DoD Patch Repository
(GFI). Plan, facilitate, and participate in all annual cybersecurity requirements. Analyze, test and apply all
Information Assurance
Vulnerability Alerts
(IAVAs), Information
Assurance Vulnerability
Bulletins (IAVBs), security updates and patches to software and operating systems.
Conduct cybersecurity risk analysis and the contractor shall assist the ISSM in the development and maintenance of accreditation packages required across the entire portfolio of systems as applicable.
Contractor delivers test plan, procedures/scenarios, reports and Cybersecurity products no less than 90% complete and on time in accordance with the agreed upon schedule. Test events coordinated and conducted on time IAW agreed upon schedule. Test activities are properly coordinated, start, and finish on time as scheduled. Draft Test documentation is delivered to no less than 80% complete in accordance with USMC
Integrated T&E standards.
Desired
Outcome
Requirement/
Service
Performance
Standard
Acceptable Quality
Level (AQL)
3.4.2, 3.4.3, 3.4.4, 3.4.5, 3.4.6, and
3.4.7
Logistics Warranty
Support Agreement, Monthly
Maintenance Report
Unique Item
Identifier (UII)
Requirement, Packaging, Handling and Shipping, Disposal &
Counterfeit Parts
Program and
Diminishing
Manufacturing
Sources and Material
Shortages
Receive guidance and direction from the Team
Lead Logistician and provide support for
Logistics activities, to include but not limited to:
meeting support and setup, knowledge of logistics activities applicable to
Programs and their ACAT, conduct analysis, draft and make final logistics documentation, and maintaining accurate
Logistics records. Perform system configuration and comply with the government Configuration
Management processes.
Store, ship, and receive equipment at installation sites. Additional duties identified in each Task
Order to include proper disposal of NACCR items
Meetings set up, documents are drafted in accordance with approved templates, and analysis is current, knowledge of logistics (Statutory and
Regulatory) process in accordance to ACAT designation. Equipment is stored, shipped, and received appropriately.
Logistics support and sustainment documentation and plans are IAW MCSC Fielding and Acquisition Guides, policies, and instructions.
Draft documents are delivered no less than 90% complete and on time, in accordance with the agreed upon schedule. Naval Fielding messages are delivered no less than 99% complete.
Logistics support and Input from the Contractor is relevant and current information. Meetings are set up in advance to the start time of the meeting. Equipment is tracked, received, and shipped to meet established RDDs and disposed of properly IAW
CNSSI4004.1
3.5 Programs Training
Support
The contractor shall
Develop, maintain, and present sustainment and
NET Programs of
Instruction (PoI) and lesson plans for the NACCR solution. Travel is required for this effort. The contractor shall provide
Operator and Administrator
Training course materials and perform training which shall provide training on the
USMC NACCR solution.
POIs are developed as per the Task Order requirements with regard of NET and/or sustainment training. All training shall be conducted during the installation phase, and prior to system cutover for each location.
The contractor shall prepare and provide a draft Training
Plan to include course descriptions, syllabuses, and training schedules for all locations 45 calendar days from contract award date.
The contractor shall provide a final Training Plan NLT 30 calendar days prior to the planned commencement of training at each location. POIs are developed and delivered within the SAT standard. The contractor shall provide manufacturer certified courses tailored for operation and maintenance for the
USMC NACCR solution.
Desired
Outcome
Requirement/
Service
Performance
Standard
Acceptable Quality
Level (AQL)
3.5.1.
3.5.2, and
3.5.3
Operator Training, Systems
Administrator
Training
Documentation &
Technical Manuals
The contractor shall provide
NACCR Technical Manuals for all new systems delivered. The contractor shall provide all necessary
Operator and Administrator training, training materials, documentation, manuals, and training aids at the commencement of training.
Training material shall be provided to each training attendee in hard copy and electronic formats.
Provide step-by-step instruction for NACCR deployment, configuration, integration, monitoring, troubleshooting, operation, management and updating of systems and subsystems.
Include MCEN and
MITSC NACCR
workflow(s), sketches and interfaces.
Detail instructions for
NACCR installation at each MITSC.
Troubleshooting with technical instructions
Preventive and Corrective maintenance procedures.
Help Desk Support and procedures.
Detailed System
Architecture
Warranty Instructions.
Training, Training
Documentation and Technical
Manuals provide step by step detailed instructions for
MCEN and MITSC specific installations and are accurate and complete 90% and on time.
3.5.4
Manpower, Personnel and
Training (MPT)
The contractor shall provide
NACCR solution MPT impacts for all new systems provided under this PWS.
MPT Impact analysis shall include NACCR Manpower and Personnel impacts and changes in force mix across the Enterprise, NACCR Job
Task Analysis, and NACCR
Workload Analysis.
Provide the pertinent information needed to
Effectively identify and perform tasks on the job to operate NACCR solution by identifying the system mission tasks, how
NACCR Operators, Administrators, and maintainers will perform assigned system functions.
Time spent on particular components, processes and tasks. Analysis of the complexity of the
Tasks and required skillsets to perform required tasks.
Acceptable performance had been met when the government accepts
Manpower and Personnel
Impact Analysis, Job Task Analysis, and
Workload Analysis at 90% complete and accurate, delivered on time IAW PWS and CDRLs.
Desired
Outcome
Requirement/
Service
Performance
Standard
Acceptable Quality
Level (AQL)
3.6
Post Implementation
Life Cycle
Sustainment &
Support
The contractor shall provide sustainment and support services to maintain
NACCR solution on the
MCEN-N and MCEN-S.
Provide onsite support to sustain and maintain the installed NACCR solution.
Onsite support shall consist of SME support capable of troubleshooting, documentation, configuration management of policy updates, preventative and corrective maintenance, assisting in problem resolution.
Provide Logistics support.
Provide vulnerability scans, remediation and mitigation activities to maintain NACCR ATO.
Provide industry best practice recommendations, product knowledge improvement recommendations and continuous product support recommendations.
On-site support personnel are required to maintain
DODI 8140 IAT Level-II certification. .
Draft documents are delivered no less than 90% complete and on time, in accordance with the agreed upon schedule. On-site support is made available during normal working hours and during after hour outages 100% of the time. Post
Implementation support personnel are required to maintain required IA certifications 100% of the time.
File details come from the government source that posted it. Updated .