amendment 00001.pdf
PDF 125 KB Posted
- Attached to
- Office Trailers Federal contract opportunity
- Solicitation number
- M6739920Q0037
- Issued by
- United States Marine Corps
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amwndment P0003 (P0002 not avalible).pdf | ||
| 20Q0037 Solicitation Yuma Trailers.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRICIA MURRAY
RCO MCAGCC 760-830-5116
TWENTYNINE PALMS CA 92278
M0124420SUC4015
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of the amendment is to address the attached questions and extend the response date from 10 June 2020 at 10am to 16 June
2020 at 10am. No other questions w ill be addressed. All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M6739920Q0037
X 9B. DATED (SEE ITEM 11)
29-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Jun-2020
CODE
REGIONAL CONTRACTING OFFICE
P. O. BOX 788153, BLDG 1102
MCAGCC
TWENTYNINE PALMS CA 92278-8153
M67399 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE M67399
FACILITY CODECODE
EMAIL:TEL:
M6739920Q0037
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
Q&A
• We understand that 4 trailers are required, can you elaborate on how the work space 1 through 7 corresponds to each trailer? Example: 2. e. Work space #5 will support the tool room and support equipment work centers. Primarily used for storage of tools and equipment and serves as a centralized issue point. Electrical power required to support: two laptops, one printer, and one MCEN network switch. Max personnel occupancy per shift: six personnel. _ This states what the work space will support.
*Ideally, if we received 4x trailers of equal size, we’d group the work spaces as follows: Trailer#1 would house work space 1, 6, & 7; trailer#2 would contain work spaces 2 &; trailer#3 work space 3; trailer#4 work space
4. However, we could work out other variations depending on what size trailers are available. If we had 3500-4000 sq ft in one trailer and a second trailer of 1000 sq ft, we could house work spaces 1-3 & 5-7 in the large trailer, and work space 4 in the smaller trailer.
• Do you have any preliminary floor plans or PFD requirements for each trailer? As there were four trailers that accommodated the work areas previously, asking for a plug and play solution.
*No, although each trailer was a triple-wide with approximately 1900 sq. ft of space.
• Will you allow “ Like New” modular facilities or only NEW Facilities?
*no preference.
• Can you please give us additional detail on the this Note: Note 2: All work spaces can be physically co-located with one another within the same structure, with the exception of work space #4, which must be physically separated from the other work spaces due to explosive storage requirements for flight equipment flares and ordnance cartridge actuated devices.
* We can’t have work space 4 co-located in the same physical structure as the other work spaces. So one massive trailer is not a viable solution.
• Would the additional explosive storage space need to be a non-combustible modular unit?
*Not required. No special requirements other than it has to be physically separated from the other work spaces.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 10-Jun-2020 10:00 AM to 16-Jun-2020 10:00 AM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .