A01_J A.pdf

PDF 192 KB Posted

Attached to
CABLE ASSEMBLY LOW POWER & CABLE ASSEMBLY LOW CURRENT
Solicitation number
M6700425P5006
Issued by

About this file

This document is a Justification for Other than Full and Open Competition for a FAR Part 13 acquisition below the Simplified Acquisition Threshold. It explains the rationale for soliciting only one source for the procurement of cable assemblies to support a Marine Corps mission.

The key details are:

  • The requirement is for Cable Assembly, Low Power and Cable Assembly, Low Current, which must be provided by the Original Equipment Manufacturer (OEM), Glenair Inc., and its authorized distributor. This is due to the OEM's proprietary rights and exclusive licensing agreements.
  • The procurement is a brand name requirement based on specific technical specifications.
  • The acquisition is urgent and compelling, as the required delivery date of October 17, 2024 is mission critical.
  • The total estimated value is below the Simplified Acquisition Threshold.
  • The solicitation will not be publicly posted, but any potential sources may contact the Contracting Officer to discuss future opportunities.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Controlled by: DON, USMC, I&L HCA Controlled by: MARCORLOGCOM MCFCS

CUI Category(ies): PROCURE

Limited Dissemination Control: DISPLAY ONLY POC: MARCORLOGCOM Contracts Department

Justification for Other than Full and Open Competition – FAR Part 13 Acquisitions under the SAT

V 1.5 (14 March 2023)

MEMORANDUM TO THE FILE

Subj: JUSTIFICATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION FOR A FAR PART

13 ACQUISITION UNDER THE SIMPLIFIED ACQUISITION THRESHOLD

I. BACKGROUND:

1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement (or portion of the requirement to be sole-sourced) is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED ON THE FOLLOWING (select all that apply):

A. ___ ONLY ONE RESPONSIBLE SOURCE (select all that apply):

1. ___ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.

2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original

Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.

3. ___ OTHER REASONS.

CUI//SP-PROCURE//DL-ONLY

Justification for Other than Full and Open Competition – FAR Part 13 Acquisitions under the SAT

V 1.5 (14 March 2023)

B. ___ BRAND NAME

Item required must be a brand name, product, or feature of a product, particular to one manufacturer.

C. ___URGENT AND COMPELLING. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:

1. Date on which the requirement was first identified: __________________________________

2. Required delivery date/period of performance: __________________________________

3. Explanation of why delivery/commencement of services by the date mentioned above is required:

4. If appropriate, include any additional pertinent information.

IV. CERTIFICATIONS:

A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.

Signature Name (Printed) / Phone # Date

B. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.

Signature Name (Printed) / Phone # Date

Date on which the requirement was first identified:
Required delivery dateperiod of performance:
2024-10-17T12:55:51-0400
POSEY.BRUCE.JR.1108583165
Name Printed Phone: Bruce Posey Jr. / 2296398210
Date: 20241017
2024-10-17T15:49:45-0400
TIPTON.GEORGE.III.1115677140
Name Printed Phone_2: George Tipton III / 229-639-6418
Date_2: 20241017
Text1: The assembly drawing provides cage code and part number for harnesses needed.

The weapon system drawing instructs us to use a specific part number to make cable assembly.

Text2: “Restrictive Rights” The OEM vendor owns the mold for the back shell , and bill of material of cable assemblies.
Text3: The OEM doesn’t sale direct to the public and directed us to buy from their distributor: Glenair.
Text4:
Text5: “Brand Name” cables must OEM drawing specs. Ex: molded back shell, the way the connectors are pinned and ETC.
Text6: Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as “urgent,” estimated production lead time for the item, etc.
Text7:
Check Box8: Yes
Check Box9: Yes
Check Box10: Yes
Check Box11: Off
Check Box12: Yes
Check Box13: Off

File details come from the government source that posted it. Updated .