Schedule of Rates - 12092020.xlsx

XLSX spreadsheet 51 KB Posted

Attached to
Blount Island Command Stevedoring & Related Terminal Services Federal contract opportunity
Solicitation number
M6700420R0003
Issued by
United States Marine Corps

View the file

Other files for this federal contract opportunity

Other files attached to Blount Island Command Stevedoring & Related Terminal Services, newest first.
File Type Posted
M6700420R0003 - AMENDMENT 0003.docx DOCX document
Schedule of Rates - 11252020.xlsx XLSX spreadsheet
AMENDMENT 0002 - M6700420R0003 - Stevedoring and Related Terminal Servics.docx DOCX document
Questions and Answers 11202020.pdf PDF
Environmental Service Agreement.rtf RTF text file
Schedule of Rates - LATESTcrc 11092020.xlsx XLSX spreadsheet
Contractor Performance Data Sheet.docx DOCX document
M6700420R0003 - Stevedoring and Related Terminal Services.docx DOCX document
GFP Listing.xlsx XLSX spreadsheet
DD 626 Fillable Motor Vehicle Transportation HAZMAT.pdf PDF
Past Performance Evaluation Form.docx DOCX document
Past Performance Questionnaire.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ordering Period 1

Ordering Period 1 - SCHEDULE OF RATES
Any order started during an ordering period will retain the same pricing of that ordering period throughout the performance of the offload/backload even if the performance crosses ordering periods.
The contractor will be paid in accordance with the commodity and man-hour rates enumerated in the following schedules:
SCHEDULE IA1 - LOADING VESSELS -
Rates for loading shall be based on non-Explosive Rates. Explosive differentials, in Schedules IA1a, will apply to items 40 thru 67 when explosives are present, when adjacent to a vessel, or on the vessel.
ItemDescriptionQuantityMT or EachUnit PriceTotal
40eGENERAL CARGO PRE-UNITIZED3484.09MT$ -ERROR:#VALUE!
45CARGO TRANSPORTERS, TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY.783EA$ -ERROR:#VALUE!
60WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING, BLOCKING & BRACING26EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON, PATENTED LASHING226EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON PATENTED LASHING34EA$ -ERROR:#VALUE!
61WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS,
TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF
CRADLE), ETC.
a.LO/LO, LIFT-ON, STANDARD AND PATENTED LASHING.5EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON665EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON461EA$ -ERROR:#VALUE!
67TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS
VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.LO/LO, LIFT-ON10EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON180EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON3EA$ -ERROR:#VALUE!
Schedule TotalERROR:#VALUE!
(1) The Contractor shall be responsible for the laying and removal of protective material.
(2) Vessels in this class do not have container cell guides.
(3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).
(4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.
(5) The Contractor shall stow containers in accordance with government provided stow plan..
(6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates.
Ordering Period 1 - SCHEDULE OF RATES
SCHEDULE IA1a - LOADING VESSELS -
EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA1
ItemDescriptionQuantityMT or EachUnit PriceTotal
25EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: GANTRY OR SHIP CRANE355EA$ -ERROR:#VALUE!
40eGENERAL CARGO PRE-UNITIZED164.32MT$ -ERROR:#VALUE!
45CARGO TRANSPORTERS250EA$ -ERROR:#VALUE!
TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY.
60WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON, STANDARD AND PATENTED LASHING, BLOCKING & BRACING3EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON97EA$ -ERROR:#VALUE!
PATENTED LASHING
d.TOW/TOW, TOW-ON PATENTED LASHING5EA$ -ERROR:#VALUE!
61WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING.1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON33EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON15EA$ -ERROR:#VALUE!
67TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.LO/LO, LIFT-ON1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON56EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON3EA$ -ERROR:#VALUE!
Schedule TotalERROR:#VALUE!
(1) The Contractor shall be responsible for the laying and removal of protective material.
(2) Vessels in this class do not have container cell guides.
(3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).
(4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.
(5) The Contractor shall stow containers in accordance with government provided stow plan..
(6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates
Ordering Period 1 - SCHEDULE OF RATES
The contractor will be paid in accordance with the commodity and man-hour rates enumerated in the following schedules:
SCHEDULE IA2 - DISCHARGING VESSELS
Rates for loading shall be based on non-Explosive Rates. Explosive differentials, in Schedules IA2a, will apply to items 40 thru 67 when explosives are present, when adjacent to a vessel, or on the vessel.
ItemDescriptionQuantityMT or EachUnit PriceTotal
40eGENERAL CARGO PRE-UNITIZED486.62MT$ -ERROR:#VALUE!
45CARGO TRANSPORTERS783EA$ -ERROR:#VALUE!
TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY.
60WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING. BLOCKING & BRACING28EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON451EA$ -ERROR:#VALUE!
PATENTED LASHING
d.TOW/TOW, TOW-ON PATENTED LASHING20EA$ -ERROR:#VALUE!
61WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON8EA$ -ERROR:#VALUE!
STANDARD AND PATENTED LASHING.
c.RO/RO, ROLL-ON759EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON568EA$ -ERROR:#VALUE!
67TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.LO/LO, LIFT-ON14EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON222EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON2EA$ -ERROR:#VALUE!
Schedule TotalERROR:#VALUE!
(1) The Contractor shall be responsible for the laying and removal of protective material.
(2) Vessels in this class do not have container cell guides.
(3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).
(4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.
(5) The Contractor shall stow containers in accordance with government provided stow plan..
(6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates
Ordering Period 1 - SCHEDULE OF RATES
SCHEDULE IA2a - DISCHARGING VESSELS
EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA2
ItemDescriptionQuantityMT or EachUnit PriceTotal
25EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY:504EA$ -ERROR:#VALUE!
GANTRY OR SHIP CRANE
40eGENERAL CARGO PRE-UNITIZED168.77MT$ -ERROR:#VALUE!
45CARGO TRANSPORTERS491EA$ -ERROR:#VALUE!
TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY.
60WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING, BLOCKING & BRACING1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON PATENTED LASHING32EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON PATENTED LASHING1EA$ -ERROR:#VALUE!
61WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING.1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON7EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON2EA$ -ERROR:#VALUE!
67TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.LO/LO, LIFT-ON1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON12EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON1EA$ -ERROR:#VALUE!
Schedule TotalERROR:#VALUE!
(1) The Contractor shall be responsible for the laying and removal of protective material.
(2) Vessels in this class do not have container cell guides.
(3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).
(4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.
(5) The Contractor shall stow containers in accordance with government provided stow plan..
(6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates
Ordering Period 1 - SCHEDULE OF RATES
SCHEDULE IB1 - LOADING AND DISCHARGING RAILCARS
ItemDescriptionQuantityMT or Each
Unit PriceTotal
25EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY:995EA$ -ERROR:#VALUE!
GANTRY OR SHIP CRANE
Schedule TotalERROR:#VALUE!
Ordering Period 1 - SCHEDULE OF RATES
MISCELLANEOUS HOURLY RATES (RATES PER HOUR)
SCHEDULE II - EXTRA LABOR - AUTOMATED RATES (STRAIGHT TIME)
ITEMDESCRIPTIONEST QTYMT OR EACHUNIT COSTTOTAL COST
1HEADER / FOREMAN186EA$ERROR:#VALUE!
2LONGSHOREMAN837EA$ERROR:#VALUE!
3MECHANIC / DRIVER837EA$ERROR:#VALUE!
4CHECKER / CLERK372EA$ERROR:#VALUE!
5CRANE OP / FLG MAN279EA$ERROR:#VALUE!
Sub TotalERROR:#VALUE!
SCHEDULE IIA - EXTRA LABOR - AUTOMATED EXPLOSIVE DIFFERENTIAL
ITEMDESCRIPTIONEST QTYMT OR EACHUNIT COSTTOTAL COST
1HEADER / FOREMAN95EA$ERROR:#VALUE!
2LONGSHOREMAN427EA$ERROR:#VALUE!
3MECHANIC / DRIVER427EA$ERROR:#VALUE!
4CHECKER / CLERK191EA$ERROR:#VALUE!
5CRANE OP / FLG MAN143EA$ERROR:#VALUE!
Sub TotalERROR:#VALUE!
MISCELLANEOUS HOURLY RATES (RATES PER HOUR)
SCHEDULE III - DETENTION TIME - AUTOMATED (STANDBY TIME, HOURLY RATE)
ITEMDESCRIPTIONEST QTYMT OR EACHUNIT COSTTOTAL COST
1HEADER / FOREMAN78EA$ERROR:#VALUE!
2LONGSHOREMAN350EA$ERROR:#VALUE!
3MECHANIC / DRIVER350EA$ERROR:#VALUE!
4CHECKER / CLERK156EA$ERROR:#VALUE!
5CRANE OP / FLG MAN117EA$ERROR:#VALUE!
Sub TotalERROR:#VALUE!
SCHEDULE IIIA - DETENTION TIME - AUTOMATED EXPLOSIVE DIFFERENTIAL (STANDBY TIME, HOURLY RATE)
ITEMDESCRIPTIONEST QTYMT OR EACHUNIT COSTTOTAL COST
1HEADER / FOREMAN36EA$ERROR:#VALUE!
2LONGSHOREMAN162EA$ERROR:#VALUE!
3MECHANIC / DRIVER162EA$ERROR:#VALUE!
4CHECKER / CLERK82EA$ERROR:#VALUE!
5CRANE OP / FLG MAN54EA$ERROR:#VALUE!
Sub TotalERROR:#VALUE!
SCHEDULE V - EQUIPMENT RENTAL RATES
HOURLY RATES TO BE PAID TO THE CONTRACTOR AS COMPENSATION FOR THE RENTAL OF EQUIPMENT USED IN CONNECTION WITH SERVICES PERFORMED ON A EXTRA LABOR BASIS. CONTRACTOR SHALL FURNISH FUEL, LUBRICANT, AND MAINTENANCE.
ITEMDESCRIPTIONEST QTYMT OR EACHUNIT COSTTOTAL COST
1TRUCKS, FORKLIFT, WITH RATE THREE (3) TONS BUT LESS THAN SEVEN AND ONE-HALF (7 1/2) TONS AT 24 INCH LOAD CENTER, WITH LOW MAST FOR WORK IN (6) FOOT HIGH RESTRICTED AREAS.1HR$ERROR:#VALUE!
2TRUCKS, FORKLIFT, WITH RATE CAPACITY GREATER THAN SEVEN AND ONE-HALF (7 1/2) TON BUT LESS THAN NINE (9) TONS AT 24 INCH LOAD CENTER.1HR$ERROR:#VALUE!
3TRUCKS, FORKLIFT, WITH RATE CAPACITY GREATER THAN NINE (9) TONS BUT LESS THAN 15 TONS AT 24 INCH LOAD CENTER.1HR$ERROR:#VALUE!
4TOP LOADER1HR$ERROR:#VALUE!
5YARD HUSTLERS1HR$ERROR:#VALUE!
620 FOOT CONTAINER CHASSIS1HR$ERROR:#VALUE!
7FLAT BED TRAILERS1HR$ERROR:#VALUE!
Schedule TotalSub TotalERROR:#VALUE!
Ordering Period 1 - SCHEDULE OF RATES
ItemDescriptionTotal Cost
IA1LOAD VESSELSERROR:#VALUE!
IA1aLOAD VESSELS –ERROR:#VALUE!
EXPL DIFF
IA2DISCHARGE VESSELSERROR:#VALUE!
IA2aDISCHARGE VESSELS - EXPL DIFFERROR:#VALUE!
IB1LOAD AND DISCH RAILCARSERROR:#VALUE!
I IXL AUTOMATEDERROR:#VALUE!
I IAXL AUTOMATED –ERROR:#VALUE!
EXPL DIFF
I I IDET AUTOMATEDERROR:#VALUE!
I I IADET AUTOMATED –ERROR:#VALUE!
EXPL DIFF
VEquipment Rental RatesERROR:#VALUE!
Total of All SchedulesERROR:#VALUE!

Ordering Period 2

Ordering Period 2 - SCHEDULE OF RATES
Any order started during an ordering period will retain the same pricing of that ordering period throughout the performance of the offload/backload even if the performance crosses ordering periods.
The contractor will be paid in accordance with the commodity and man-hour rates enumerated in the following schedules:
SCHEDULE IA1 - LOADING VESSELS -
Rates for loading shall be based on non-Explosive Rates. Explosive differentials, in Schedules IA1a, will apply to items 40 thru 67 when explosives are present, when adjacent to a vessel, or on the vessel.
ItemDescriptionQuantityMT or EachUnit PriceTotal
40eGENERAL CARGO PRE-UNITIZED638.23MT$ -ERROR:#VALUE!
45CARGO TRANSPORTERS, TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY.581EA$ -ERROR:#VALUE!
60WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING, BLOCKING & BRACING13EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON, PATENTED LASHING479EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON PATENTED LASHING13EA$ -ERROR:#VALUE!
61WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS,
TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF
CRADLE), ETC.
a.LO/LO, LIFT-ON, STANDARD AND PATENTED LASHING.3EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON757EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON448EA$ -ERROR:#VALUE!
67TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS
VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.LO/LO, LIFT-ON12EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON142EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON1EA$ -ERROR:#VALUE!
Schedule TotalERROR:#VALUE!
(1) The Contractor shall be responsible for the laying and removal of protective material.
(2) Vessels in this class do not have container cell guides.
(3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).
(4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.
(5) The Contractor shall stow containers in accordance with government provided stow plan..
(6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates.
Ordering Period 2 - SCHEDULE OF RATES
SCHEDULE IA1a - LOADING VESSELS -
EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA1
ItemDescriptionQuantityMT or EachUnit PriceTotal
25EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: GANTRY OR SHIP CRANE329EA$ -ERROR:#VALUE!
40eGENERAL CARGO PRE-UNITIZED40.82MT$ -ERROR:#VALUE!
45CARGO TRANSPORTERS TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY.180EA$ -ERROR:#VALUE!
60WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON, STANDARD AND PATENTED LASHING, BLOCKING & BRACING PATENTED LASHING1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON50EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON PATENTED LASHING8EA$ -ERROR:#VALUE!
61WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING.1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON16EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON6EA$ -ERROR:#VALUE!
67TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.LO/LO, LIFT-ON1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON58EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON1EA$ -ERROR:#VALUE!
Schedule TotalERROR:#VALUE!
(1) The Contractor shall be responsible for the laying and removal of protective material.
(2) Vessels in this class do not have container cell guides.
(3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).
(4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.
(5) The Contractor shall stow containers in accordance with government provided stow plan..
(6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates
Ordering Period 2 - SCHEDULE OF RATES
The contractor will be paid in accordance with the commodity and man-hour rates enumerated in the following schedules:
SCHEDULE IA2 - DISCHARGING VESSELS
Rates for loading shall be based on non-Explosive Rates. Explosive differentials, in Schedules IA2a, will apply to items 40 thru 67 when explosives are present, when adjacent to a vessel, or on the vessel.
ItemDescriptionQuantityMT or EachUnit PriceTotal
40eGENERAL CARGO PRE-UNITIZED1MT$ -ERROR:#VALUE!
45CARGO TRANSPORTERS223EA$ -ERROR:#VALUE!
TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY.
60WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING. BLOCKING & BRACING1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON1EA$ -ERROR:#VALUE!
PATENTED LASHING
d.TOW/TOW, TOW-ON PATENTED LASHING1EA$ -ERROR:#VALUE!
61WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON1EA$ -$ -
STANDARD AND PATENTED LASHING.
c.RO/RO, ROLL-ON1EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON1EA$ -ERROR:#VALUE!
67TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.LO/LO, LIFT-ON1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON1EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON1EA$ -ERROR:#VALUE!
Schedule TotalERROR:#VALUE!
(1) The Contractor shall be responsible for the laying and removal of protective material.
(2) Vessels in this class do not have container cell guides.
(3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).
(4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.
(5) The Contractor shall stow containers in accordance with government provided stow plan..
(6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates
Ordering Period 2 - SCHEDULE OF RATES
SCHEDULE IA2a - DISCHARGING VESSELS
EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA2
ItemDescriptionQuantityMT or EachUnit PriceTotal
25EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: GANTRY OR SHIP CRANE3531EA$ -ERROR:#VALUE!
40eGENERAL CARGO PRE-UNITIZED1MT$ -ERROR:#VALUE!
45CARGO TRANSPORTERS223EA$ -ERROR:#VALUE!
TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY.
60WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING, BLOCKING & BRACING1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON PATENTED LASHING1EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON PATENTED LASHING1EA$ -ERROR:#VALUE!
61WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING.1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON1EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON1EA$ -ERROR:#VALUE!
67TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.LO/LO, LIFT-ON1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON13EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON1EA$ -ERROR:#VALUE!
Schedule TotalERROR:#VALUE!
(1) The Contractor shall be responsible for the laying and removal of protective material.
(2) Vessels in this class do not have container cell guides.
(3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).
(4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.
(5) The Contractor shall stow containers in accordance with government provided stow plan..
(6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates
Ordering Period 2 - SCHEDULE OF RATES
SCHEDULE IB1 - LOADING AND DISCHARGING RAILCARS
ItemDescriptionQuantityMT or Each
Unit PriceTotal
25EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY:660EA$ -ERROR:#VALUE!
GANTRY OR SHIP CRANE
Schedule TotalERROR:#VALUE!
Ordering Period 2 - SCHEDULE OF RATES
MISCELLANEOUS HOURLY RATES (RATES PER HOUR)
SCHEDULE II - EXTRA LABOR - AUTOMATED RATES (STRAIGHT TIME)
ITEMDESCRIPTIONEST QTYMT OR EACHUNIT COSTTOTAL COST
1HEADER / FOREMAN186EA$ERROR:#VALUE!
2LONGSHOREMAN837EA$ERROR:#VALUE!
3MECHANIC / DRIVER837EA$ERROR:#VALUE!
4CHECKER / CLERK372EA$ERROR:#VALUE!
5CRANE OP / FLG MAN279EA$ERROR:#VALUE!
Sub TotalERROR:#VALUE!
SCHEDULE IIA - EXTRA LABOR - AUTOMATED EXPLOSIVE DIFFERENTIAL
ITEMDESCRIPTIONEST QTYMT OR EACHUNIT COSTTOTAL COST
1HEADER / FOREMAN95EA$ERROR:#VALUE!
2LONGSHOREMAN427EA$ERROR:#VALUE!
3MECHANIC / DRIVER427EA$ERROR:#VALUE!
4CHECKER / CLERK191EA$ERROR:#VALUE!
5CRANE OP / FLG MAN143EA$ERROR:#VALUE!
Sub TotalERROR:#VALUE!
MISCELLANEOUS HOURLY RATES (RATES PER HOUR)
SCHEDULE III - DETENTION TIME - AUTOMATED (STANDBY TIME, HOURLY RATE)
ITEMDESCRIPTIONEST QTYMT OR EACHUNIT COSTTOTAL COST
1HEADER / FOREMAN78EA$ERROR:#VALUE!
2LONGSHOREMAN350EA$ERROR:#VALUE!
3MECHANIC / DRIVER350EA$ERROR:#VALUE!
4CHECKER / CLERK156EA$ERROR:#VALUE!
5CRANE OP / FLG MAN117EA$ERROR:#VALUE!
Sub TotalERROR:#VALUE!
SCHEDULE IIIA - DETENTION TIME - AUTOMATED EXPLOSIVE DIFFERENTIAL (STANDBY TIME, HOURLY RATE)
ITEMDESCRIPTIONEST QTYMT OR EACHUNIT COSTTOTAL COST
1HEADER / FOREMAN36EA$ERROR:#VALUE!
2LONGSHOREMAN162EA$ERROR:#VALUE!
3MECHANIC / DRIVER162EA$ERROR:#VALUE!
4CHECKER / CLERK82EA$ERROR:#VALUE!
5CRANE OP / FLG MAN54EA$ERROR:#VALUE!
Sub TotalERROR:#VALUE!
SCHEDULE V - EQUIPMENT RENTAL RATES
HOURLY RATES TO BE PAID TO THE CONTRACTOR AS COMPENSATION FOR THE RENTAL OF EQUIPMENT USED IN CONNECTION WITH SERVICES PERFORMED ON A EXTRA LABOR BASIS. CONTRACTOR SHALL FURNISH FUEL, LUBRICANT, AND MAINTENANCE.
ITEMDESCRIPTIONEST QTYMT OR EACHUNIT COSTTOTAL COST
1TRUCKS, FORKLIFT, WITH RATE THREE (3) TONS BUT LESS THAN SEVEN AND ONE-HALF (7 1/2) TONS AT 24 INCH LOAD CENTER, WITH LOW MAST FOR WORK IN (6) FOOT HIGH RESTRICTED AREAS.1HR$ERROR:#VALUE!
2TRUCKS, FORKLIFT, WITH RATE CAPACITY GREATER THAN SEVEN AND ONE-HALF (7 1/2) TON BUT LESS THAN NINE (9) TONS AT 24 INCH LOAD CENTER.1HR$ERROR:#VALUE!
3TRUCKS, FORKLIFT, WITH RATE CAPACITY GREATER THAN NINE (9) TONS BUT LESS THAN 15 TONS AT 24 INCH LOAD CENTER.1HR$ERROR:#VALUE!
4TOP LOADER1HR$ERROR:#VALUE!
5YARD HUSTLERS1HR$ERROR:#VALUE!
620 FOOT CONTAINER CHASSIS1HR$ERROR:#VALUE!
7FLAT BED TRAILERS1HR$ERROR:#VALUE!
Schedule TotalSub TotalERROR:#VALUE!

Ordering Period 2 - SCHEDULE OF RATES

ItemDescriptionTotal Cost
IA1LOAD VESSELSERROR:#VALUE!
IA1aLOAD VESSELS –ERROR:#VALUE!
EXPL DIFF
IA2DISCHARGE VESSELSERROR:#VALUE!
IA2aDISCHARGE VESSELS - EXPL DIFFERROR:#VALUE!
IB1LOAD AND DISCH RAILCARSERROR:#VALUE!
I IXL AUTOMATEDERROR:#VALUE!
I IAXL AUTOMATED –ERROR:#VALUE!
EXPL DIFF
I I IDET AUTOMATEDERROR:#VALUE!
I I IADET AUTOMATED –ERROR:#VALUE!
EXPL DIFF
VEquipment Rental RatesERROR:#VALUE!
Total of All SchedulesERROR:#VALUE!

Ordering Period 3

Ordering Period 3 - SCHEDULE OF RATES
Any order started during an ordering period will retain the same pricing of that ordering period throughout the performance of the offload/backload even if the performance crosses ordering periods.
The contractor will be paid in accordance with the commodity and man-hour rates enumerated in the following schedules:
SCHEDULE IA1 - LOADING VESSELS -
Rates for loading shall be based on non-Explosive Rates. Explosive differentials, in Schedules IA1a, will apply to items 40 thru 67 when explosives are present, when adjacent to a vessel, or on the vessel.
ItemDescriptionQuantityMT or EachUnit PriceTotal
40eGENERAL CARGO PRE-UNITIZED4011.74MT$ -ERROR:#VALUE!
45CARGO TRANSPORTERS, TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY.970EA$ -ERROR:#VALUE!
60WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING, BLOCKING & BRACING34EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON, PATENTED LASHING270EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON PATENTED LASHING1EA$ -ERROR:#VALUE!
61WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS,
TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF
CRADLE), ETC.
a.LO/LO, LIFT-ON, STANDARD AND PATENTED LASHING.8EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON777EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON539EA$ -ERROR:#VALUE!
67TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS
VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.LO/LO, LIFT-ON3EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON183EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON5EA$ -ERROR:#VALUE!
Schedule TotalERROR:#VALUE!
(1) The Contractor shall be responsible for the laying and removal of protective material.
(2) Vessels in this class do not have container cell guides.
(3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).
(4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.
(5) The Contractor shall stow containers in accordance with government provided stow plan..
(6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates.
Ordering Period 3 - SCHEDULE OF RATES
SCHEDULE IA1a - LOADING VESSELS -
EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA1
ItemDescriptionQuantityMT or EachUnit PriceTotal
25EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: GANTRY OR SHIP CRANE525EA$ -ERROR:#VALUE!
40eGENERAL CARGO PRE-UNITIZED345.84MT$ -ERROR:#VALUE!
45CARGO TRANSPORTERS632EA$ -ERROR:#VALUE!
TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY.
60WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON, STANDARD AND PATENTED LASHING, BLOCKING & BRACING14EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON143EA$ -ERROR:#VALUE!
PATENTED LASHING
d.TOW/TOW, TOW-ON PATENTED LASHING7EA$ -ERROR:#VALUE!
61WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING.1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON66EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON74EA$ -ERROR:#VALUE!
67TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.LO/LO, LIFT-ON3EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON93EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON3EA$ -ERROR:#VALUE!
Schedule TotalERROR:#VALUE!
(1) The Contractor shall be responsible for the laying and removal of protective material.
(2) Vessels in this class do not have container cell guides.
(3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).
(4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.
(5) The Contractor shall stow containers in accordance with government provided stow plan..
(6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates
Ordering Period 3 - SCHEDULE OF RATES
The contractor will be paid in accordance with the commodity and man-hour rates enumerated in the following schedules:
SCHEDULE IA2 - DISCHARGING VESSELS
Rates for loading shall be based on non-Explosive Rates. Explosive differentials, in Schedules IA2a, will apply to items 40 thru 67 when explosives are present, when adjacent to a vessel, or on the vessel.
ItemDescriptionQuantityMT or EachUnit PriceTotal
40eGENERAL CARGO PRE-UNITIZED3558.66MT$ -ERROR:#VALUE!
45CARGO TRANSPORTERS694EA$ -ERROR:#VALUE!
TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY.
60WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING. BLOCKING & BRACING7EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON209EA$ -ERROR:#VALUE!
PATENTED LASHING
d.TOW/TOW, TOW-ON PATENTED LASHING12EA$ -ERROR:#VALUE!
61WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON5EA$ -ERROR:#VALUE!
STANDARD AND PATENTED LASHING.
c.RO/RO, ROLL-ON592EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON434EA$ -ERROR:#VALUE!
67TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.LO/LO, LIFT-ON5EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON177EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON8EA$ -ERROR:#VALUE!
Schedule TotalERROR:#VALUE!
(1) The Contractor shall be responsible for the laying and removal of protective material.
(2) Vessels in this class do not have container cell guides.
(3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).
(4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.
(5) The Contractor shall stow containers in accordance with government provided stow plan..
(6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates
Ordering Period 3 - SCHEDULE OF RATES
SCHEDULE IA2a - DISCHARGING VESSELS
EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA2
ItemDescriptionQuantityMT or EachUnit PriceTotal
25EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY:388EA$ -ERROR:#VALUE!
GANTRY OR SHIP CRANE
40eGENERAL CARGO PRE-UNITIZED29.36MT$ -ERROR:#VALUE!
45CARGO TRANSPORTERS271EA$ -ERROR:#VALUE!
TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY.
60WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING, BLOCKING & BRACING1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON PATENTED LASHING37EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON PATENTED LASHING1EA$ -ERROR:#VALUE!
61WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING.1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON72EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON1EA$ -ERROR:#VALUE!
67TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.LO/LO, LIFT-ON1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON37EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON4EA$ -ERROR:#VALUE!
Schedule TotalERROR:#VALUE!
(1) The Contractor shall be responsible for the laying and removal of protective material.
(2) Vessels in this class do not have container cell guides.
(3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).
(4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.
(5) The Contractor shall stow containers in accordance with government provided stow plan..
(6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates
Ordering Period 3 - SCHEDULE OF RATES
SCHEDULE IB1 - LOADING AND DISCHARGING RAILCARS
ItemDescriptionQuantityMT or Each
Unit PriceTotal
25EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY:913EA$ -ERROR:#VALUE!
GANTRY OR SHIP CRANE
Schedule TotalERROR:#VALUE!
Ordering Period 3 - SCHEDULE OF RATES
MISCELLANEOUS HOURLY RATES (RATES PER HOUR)
SCHEDULE II - EXTRA LABOR - AUTOMATED RATES (STRAIGHT TIME)
ITEMDESCRIPTIONEST QTYMT OR EACHUNIT COSTTOTAL COST
1HEADER / FOREMAN186EA$ERROR:#VALUE!
2LONGSHOREMAN837EA$ERROR:#VALUE!
3MECHANIC / DRIVER837EA$ERROR:#VALUE!
4CHECKER / CLERK372EA$ERROR:#VALUE!
5CRANE OP / FLG MAN279EA$ERROR:#VALUE!
Sub TotalERROR:#VALUE!
SCHEDULE IIA - EXTRA LABOR - AUTOMATED EXPLOSIVE DIFFERENTIAL
ITEMDESCRIPTIONEST QTYMT OR EACHUNIT COSTTOTAL COST
1HEADER / FOREMAN95EA$ERROR:#VALUE!
2LONGSHOREMAN427EA$ERROR:#VALUE!
3MECHANIC / DRIVER427EA$ERROR:#VALUE!
4CHECKER / CLERK191EA$ERROR:#VALUE!
5CRANE OP / FLG MAN143EA$ERROR:#VALUE!
Sub TotalERROR:#VALUE!
MISCELLANEOUS HOURLY RATES (RATES PER HOUR)
SCHEDULE III - DETENTION TIME - AUTOMATED (STANDBY TIME, HOURLY RATE)
ITEMDESCRIPTIONEST QTYMT OR EACHUNIT COSTTOTAL COST
1HEADER / FOREMAN78EA$ERROR:#VALUE!
2LONGSHOREMAN350EA$ERROR:#VALUE!
3MECHANIC / DRIVER350EA$ERROR:#VALUE!
4CHECKER / CLERK156EA$ERROR:#VALUE!
5CRANE OP / FLG MAN117EA$ERROR:#VALUE!
Sub TotalERROR:#VALUE!
SCHEDULE IIIA - DETENTION TIME - AUTOMATED EXPLOSIVE DIFFERENTIAL (STANDBY TIME, HOURLY RATE)
ITEMDESCRIPTIONEST QTYMT OR EACHUNIT COSTTOTAL COST
1HEADER / FOREMAN36EA$ERROR:#VALUE!
2LONGSHOREMAN162EA$ERROR:#VALUE!
3MECHANIC / DRIVER162EA$ERROR:#VALUE!
4CHECKER / CLERK82EA$ERROR:#VALUE!
5CRANE OP / FLG MAN54EA$ERROR:#VALUE!
Sub TotalERROR:#VALUE!
SCHEDULE V - EQUIPMENT RENTAL RATES
HOURLY RATES TO BE PAID TO THE CONTRACTOR AS COMPENSATION FOR THE RENTAL OF EQUIPMENT USED IN CONNECTION WITH SERVICES PERFORMED ON A EXTRA LABOR BASIS. CONTRACTOR SHALL FURNISH FUEL, LUBRICANT, AND MAINTENANCE.
ITEMDESCRIPTIONEST QTYMT OR EACHUNIT COSTTOTAL COST
1TRUCKS, FORKLIFT, WITH RATE THREE (3) TONS BUT LESS THAN SEVEN AND ONE-HALF (7 1/2) TONS AT 24 INCH LOAD CENTER, WITH LOW MAST FOR WORK IN (6) FOOT HIGH RESTRICTED AREAS.1HR$ERROR:#VALUE!
2TRUCKS, FORKLIFT, WITH RATE CAPACITY GREATER THAN SEVEN AND ONE-HALF (7 1/2) TON BUT LESS THAN NINE (9) TONS AT 24 INCH LOAD CENTER.1HR$ERROR:#VALUE!
3TRUCKS, FORKLIFT, WITH RATE CAPACITY GREATER THAN NINE (9) TONS BUT LESS THAN 15 TONS AT 24 INCH LOAD CENTER.1HR$ERROR:#VALUE!
4TOP LOADER1HR$ERROR:#VALUE!
5YARD HUSTLERS1HR$ERROR:#VALUE!
620 FOOT CONTAINER CHASSIS1HR$ERROR:#VALUE!
7FLAT BED TRAILERS1HR$ERROR:#VALUE!
Schedule TotalSub TotalERROR:#VALUE!

Ordering Period 3 - SCHEDULE OF RATES

ItemDescriptionTotal Cost
IA1LOAD VESSELSERROR:#VALUE!
IA1aLOAD VESSELS –ERROR:#VALUE!
EXPL DIFF
IA2DISCHARGE VESSELSERROR:#VALUE!
IA2aDISCHARGE VESSELS - EXPL DIFFERROR:#VALUE!
IB1LOAD AND DISCH RAILCARSERROR:#VALUE!
I IXL AUTOMATEDERROR:#VALUE!
I IAXL AUTOMATED –ERROR:#VALUE!
EXPL DIFF
I I IDET AUTOMATEDERROR:#VALUE!
I I IADET AUTOMATED –ERROR:#VALUE!
EXPL DIFF
VEquipment Rental RatesERROR:#VALUE!
Total of All SchedulesERROR:#VALUE!

Ordering Period 4

Ordering Period 4 - SCHEDULE OF RATES
Any order started during an ordering period will retain the same pricing of that ordering period throughout the performance of the offload/backload even if the performance crosses ordering periods.
The contractor will be paid in accordance with the commodity and man-hour rates enumerated in the following schedules:
SCHEDULE IA1 - LOADING VESSELS -
Rates for loading shall be based on non-Explosive Rates. Explosive differentials, in Schedules IA1a, will apply to items 40 thru 67 when explosives are present, when adjacent to a vessel, or on the vessel.
ItemDescriptionQuantityMT or EachUnit PriceTotal
40eGENERAL CARGO PRE-UNITIZED3484.09MT$ -ERROR:#VALUE!
45CARGO TRANSPORTERS, TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY.644EA$ -ERROR:#VALUE!
60WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING, BLOCKING & BRACING26EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON, PATENTED LASHING226EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON PATENTED LASHING34EA$ -ERROR:#VALUE!
61WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS,
TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF
CRADLE), ETC.
a.LO/LO, LIFT-ON, STANDARD AND PATENTED LASHING.5EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON665EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON461EA$ -ERROR:#VALUE!
67TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS
VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.LO/LO, LIFT-ON10EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON180EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON3EA$ -ERROR:#VALUE!
Schedule TotalERROR:#VALUE!
(1) The Contractor shall be responsible for the laying and removal of protective material.
(2) Vessels in this class do not have container cell guides.
(3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).
(4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.
(5) The Contractor shall stow containers in accordance with government provided stow plan..
(6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates.
Ordering Period 4 - SCHEDULE OF RATES
SCHEDULE IA1a - LOADING VESSELS -
EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA1
ItemDescriptionQuantityMT or EachUnit PriceTotal
25EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: GANTRY OR SHIP CRANE355EA$ -ERROR:#VALUE!
40eGENERAL CARGO PRE-UNITIZED164.32MT$ -ERROR:#VALUE!
45CARGO TRANSPORTERS371EA$ -ERROR:#VALUE!
TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY.
60WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON, STANDARD AND PATENTED LASHING, BLOCKING & BRACING3EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON97EA$ -ERROR:#VALUE!
PATENTED LASHING
d.TOW/TOW, TOW-ON PATENTED LASHING5EA$ -ERROR:#VALUE!
61WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING.1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON33EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON15EA$ -ERROR:#VALUE!
67TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.LO/LO, LIFT-ON1EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON56EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON3EA$ -ERROR:#VALUE!
Schedule TotalERROR:#VALUE!
(1) The Contractor shall be responsible for the laying and removal of protective material.
(2) Vessels in this class do not have container cell guides.
(3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).
(4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.
(5) The Contractor shall stow containers in accordance with government provided stow plan..
(6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates
Ordering Period 4 - SCHEDULE OF RATES
The contractor will be paid in accordance with the commodity and man-hour rates enumerated in the following schedules:
SCHEDULE IA2 - DISCHARGING VESSELS
Rates for loading shall be based on non-Explosive Rates. Explosive differentials, in Schedules IA2a, will apply to items 40 thru 67 when explosives are present, when adjacent to a vessel, or on the vessel.
ItemDescriptionQuantityMT or EachUnit PriceTotal
40eGENERAL CARGO PRE-UNITIZED486.62MT$ -ERROR:#VALUE!
45CARGO TRANSPORTERS783EA$ -ERROR:#VALUE!
TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY.
60WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON STANDARD AND PATENTED LASHING. BLOCKING & BRACING28EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON451EA$ -ERROR:#VALUE!
PATENTED LASHING
d.TOW/TOW, TOW-ON PATENTED LASHING471EA$ -ERROR:#VALUE!
61WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC.
a.LO/LO, LIFT-ON8EA$ -ERROR:#VALUE!
STANDARD AND PATENTED LASHING.
c.RO/RO, ROLL-ON759EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON568EA$ -ERROR:#VALUE!
67TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.LO/LO, LIFT-ON14EA$ -ERROR:#VALUE!
c.RO/RO, ROLL-ON222EA$ -ERROR:#VALUE!
d.TOW/TOW, TOW-ON2EA$ -ERROR:#VALUE!
Schedule TotalERROR:#VALUE!
(1) The Contractor shall be responsible for the laying and removal of protective material.
(2) Vessels in this class do not have container cell guides.
(3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).
(4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.
(5) The Contractor shall stow containers in accordance with government provided stow plan..
(6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates
Ordering Period 4 - SCHEDULE OF RATES
SCHEDULE IA2a - DISCHARGING VESSELS
EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA2
ItemDescriptionQuantityMT or EachUnit PriceTotal
25EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY:504EA$ -ERROR:#VALUE!

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .