This document package includes an attachment to a federal contract data requirements list and the related federal contract opportunity notice. The contract data requirements list attachment outlines 35 required Navy reports related to logistics services for the Marine Corps Prepositioning Program. The reports include items like consolidated memorandum receipts, calibration reports, load plan changes, fiber and wire rope inspection data, and completion notices. They must be submitted electronically and adhere to specified Navy formats and submission deadlines ranging from 5 to 90 days.

The related federal contract opportunity is a notice for solicitation number M67004-18-R-0014, seeking end-to-end management and operation logistics support services for the Marine Corps Prepositioning Program at Blount Island Command. The government intends to award an indefinite delivery, indefinite quantity contract using FAR Part 15 procedures and will conduct a tradeoff evaluation. The solicitation will be posted on March 26, 2018. Interested parties must register in SAM and WAWF and ensure representations and certifications are current. The response deadline is not provided and contract award is anticipated on December 1, 2018. Questions are due by March 19.

Attachment 8 CDRLS

View the file

Other files

File Type Posted
M67004-18-R-0014_0006_RFP_Amendment.docx DOCX document
M67004-18-R-0014_0005_RFP_Amendment.pdf PDF
M67004-18-R-0014_0005_Conform_Copy_RFP_Amendment.pdf PDF
Attachment_2R_-_Manning_-_Revised_Mod_P00037.xlsx XLSX spreadsheet
Attachment_2R_-_DOL_Wage_Determination.docx DOCX document
Additional_Questions_and_Government_Responses_25_July_2018.docx DOCX document
MMC-12_NAVY_CAPABILITY_SPREAD_Feb_27_2017.pdf PDF
USNavySpreadload_MMC_13_draft.pdf PDF
USNavySpreadload_MMC_12_1_June_18.pdf PDF
SUR.xlsx XLSX spreadsheet
M67004-18-R-0014_0004_Comparison_to_Amendment_0003.docx DOCX document
Attachment_17_Additional_Questions_and_Answers_6.25.18.pdf PDF
MMC-13_NAVY_CAPABILITY_SPREAD_PROJECTION_.pdf PDF
MAJOR_SYSALT_COMPLETIONS.PDF PDF
M67004-18-R-0014_0004_RFP_Amendment.pdf PDF
M67004-18-R-0014_0004_Conform_Copy_RFP_Amendment.pdf PDF
M67004-18-R-0014_0003_RFP_Amendment.pdf PDF
M67004-18-R-0014_0002_Conform_Copy_RFP_Amendment.pdf PDF
2018-0617.001.001.001_MCO_11240.106C_Draft.docx DOCX document
M67004-18-R-0014_0002_RFP_Amendment.pdf PDF
C.1-8_Proposed_MMC-14_and_-15_schedule.xlsx XLSX spreadsheet
Preproposal_Conference_22_May_2018.pdf PDF
LOGDIV_Pre_Proposal_Conference_22_May_2018.pdf PDF
Site_Visit_Attendees_Combined.pdf PDF
M67004-18-R-0014_0002_Comparison_to_Amendment_0001.docx DOCX document
LOGDIV_Pre_Proposal_Conference_7_June_2018.pdf PDF
USW-CBA_MOA_3.12.18.pdf PDF
C.1-9_Navy_Watercraft_Plan.xlsx XLSX spreadsheet
Preproposal_Conference_7_Jun_18.pdf PDF
Questions_and_Answers.pdf PDF
Trans_Trans_MCO_P11240[1].106B_GARRISON_MOBILE_EQUIPMENT.pdf PDF
MOA_for_SB_Bonus_Increase_5-16-18.pdf PDF
Attachment_12_-_Non-Disclosure_Template_GFI.doc DOC document
Attachment_7_-_GFF.docx DOCX document
Copy_of_Attachment_2R_-_Manning_-_Revised_Mod_P00037.xlsx XLSX spreadsheet
M67004-18-R-0014_0001_Conform_Copy_RFP_Amendment.pdf PDF
M67004-18-R-0014_0001_RFP_Amendment.pdf PDF
Attachment_7_-_GFE.docx DOCX document
M67004-18-R-0014_0001_Comparison_to_Original_RFP.docx DOCX document
Attachment_4_-_Past_Performance_Package.docx DOCX document
Attachment_12_-_Non-Disclosure_Template_GFI.doc DOC document
Attachment_4_-_Past_Performance_Package.docx DOCX document
Attachment_7_-_GFE.docx DOCX document
Attachment_7_-_GFF.docx DOCX document
Attachment_5_-_DD-254.pdf PDF
Attachment_3_-_CBA_Wage_Determination.docx DOCX document
Attachment_8_-_C.11_IT_dd1423-1.pdf PDF
Attachment_8_-_C.7_Shipboard_dd1423-1.pdf PDF
Attachment_8_-_C.6_Navy_CLIN_5-2_Navy_Ops_dd1423-1.pdf PDF
Attachment_8_-_C.6_Navy_CLIN_3-1_Lighterage_and_Supply_dd1423-1.pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: 6024-6035
title: Navy Reports
sub:
auth: See Block 16
ref: Section C.6 of the SOW
req_ofc: Blount Island Command
dd250: N/A
appcode: N/A
dist: No
freq: See Blk 16
asof: See Blk 16
firstsub: See Blk 16
subsub: See Blk 16
addressee1: Navy COTR
draft1:
reg1: 1
repro1:
addressee2: Navy Branch QAR
draft2:
reg2: 1
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 2
total_repro: 0
remarks: Block 4: Format in accordance with SOW Attachments C.6-001 through C.6-048 and/or contractor format if not specified in SOW. Submit electronically via email.

Navy Reports shall address requirements prescribed in SOW Section C.6:

*6024: Navy Consolidated Memorandum Receipt (CMR) (SOW 6.D.6.f), Block 4: SOW Attachment C.6-021 Navy Consolidated Memorandum Receipt (CMR). Block 10 through 13: On island assets - no later than 5th business day of each quarter. NAVMC 2907 assets - no later than E+10.

*6025: Navy Calibration Report (SOW 6.D.7), Block 4: SOW Attachment C.6-022 Navy Calibration Report. Block 10 through 13: No later the E+10 in accordance C.2 Maintenance Management and CmdO 4790.1.

*6026: Navy Spread Load Plans Change (SOW 6.A.14.a) Block 4: Contractor format acceptable in accordance with SOW requirements. Block 10 through 13: Within one busine

*6027: Fibrous and Wire Rope Service Life Data Sheet (SOW 6.F.19) Block 4: SOW Attachment C.6-030 and written report IAW SOW requirements. Block 10 through 13: Due NLT E-day

*6028: Navy OPTEST Form (SOW 6.F.50) Block 4: OPTEST Form will be provided. Block 10 through 13: Due within 5 calendar days after completion. Block 4: Format in accordance with SOW Attachments C.6-001 through C.6-048 and/or contractor format if not specified in SOW. Submit electronically via email.

*6029: Navy Watercraft Care In Stores (SOW6.F.44) Block 4: IAW C.6-041 Watercraft Monitoring Requirements. Block 10 through 13: Upon request by NSMB.

*6030: Control System Support Monthly TR Inventory, Kitting and Delivery Status Report (SOW 6.H.1.d) Block 4: Contractor format acceptable. Block 10 through 13: Due NLT the fifth business day of every month.

group:
total_price:
prep_name:
prep_sign:
prep_date:
app_by:
app_sign:
app_date:
Page:
app: Adobe Professional 7.0
line_item: X003
exhibit: A
xtdp: Off
xtm: Off
othercat:
system: Marine Corps Prepositioning Program
ctr_no:
contr:
remarksb: *6031 Notice of Completion and Craft Condition Found Report for CONUS fleet concentration areas. (SOW 6.H.1.e) Block 4: SOW Attachment C.6-038 NOC (NOTICE OF COMPLETION) Form with Instructions_rev04 and C.6-6-048 Craft Condition Found Report. Block 10 through 13: NOC due NLT 5 business days after testing. CFR due as required IAW SOW requirements.

*6032: Navy Watercraft TR Control System Support Material Cost Estimate (SOW 6.H.l.i) Block 4: Contractor format acceptable. Block 10 through 13: Due NLT 1 June each year.

*6033: Navy Watercraft TR Control System Support Material Cost Estimate for CONUS fleet concentration areas.(SOW 6.H.l.j) Block 4: Contractor format acceptable. Block 10 through 13: Due NLT 90 calendar days prior to period of performance.

*6034: Control System Support Notice of Completion (NOC) (SOW 6.H.1.e) Block 4: IAW C.6-038 Notice of Completion (NOC). Block 10 through 13: NLT 5 business days after testing is complete.

*6035: Notice of Completion and Craft Condition Found Report (SOW 6H.1.f) Block 4: SOW Attachment C.6-038 NOC (Notice of Completion Form with Insturcitons_rev04 and SOW Attachment C.6-048 Craft Condition Found Report. Block 10 through 13: NOC due NLT 5 business days after testing. CFR due as required IAW SOW requirements.