Vendor_Submitted_Questions_-_GOVERNMENT_RESPONSES.pdf

PDF 6 KB Posted

Attached to
Telecommunication Maintenance Federal contract opportunity
Solicitation number
M6700417Q1071
Issued by
United States Marine Corps

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Telecommunication Maintenance, newest first.
File Type Posted
M67004-17-Q-1071_0001.docx DOCX document
M67004-17-Q-1071.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M00146-17-Q-1071 Attachment 01

GOVERNMENT RESPONSES TO VENDOR SUBMITTED QUESTIONS

1. The PWS requires the Contractor to hold a CNCI Certification. Request that the Government remove the requirement.

Government Response: This certification is not required to be considered acceptable. This is being removed from the RFQ.

2. The PWS also requires that the Contractor hold a BICSI Certification, but does not clarify WHICH BICSI

Certification is required, and if the Certification is required at the Company or Installer Level. For this type of effort, there is no directly relevant BICSI Technician Certification, therefore, we request that this requirement be removed from the RFQ. Instead, a requirement that the Contractor have at least one BICSI Registered Communications

Distribution Designer (RCDD) on staff, who will be in responsible control of this Project, would be more appropriate.

Government Response: The Government agrees that one BICSI Registered Communications Distribution Designer

(RCDD) on staff, who will be in responsible control of this Project is acceptable.

3. What are the model numubers for the two power strips?

Government Response:

On Rack: APC AP7862

On Ladder Rack: APC AP7868

4. What are the security requirements for base access? Specifically, are background checks required?

Government Response: I verified with the front gate that RapidGate is the sole requirement for access to the installation. Please consult www.rapidgate.com for access requirements.

5. Per the project 1.1.3, will a copper tracer wire be required when installing the OSP fiber from bldgs. 104 to 112?

If so, please specify type and AWG.

Government Response: MAXCELL 2" 3 cell with tracer.