FAR Subpart 8.4 Limited Sources Justification.pdf
PDF 1 MB Posted
- Attached to
- Intent to Sole Source to DODESI
- Solicitation number
- M6700125Q1005
- Issued by
-
United States Marine Corps
About this file
This is a Limited Sources Justification document under FAR Subpart 8.4 for the Department of the Navy, Marine Corps Installation and Logistics (HQMC, I&L) at Cherry Point, NC. The justification is for software subscription renewal licenses from Nutanix for their Cloud Infrastructure and Cloud Management products, specifically license numbers LIC-02404058 through LIC-02404066.
The justification is based on "Items Peculiar to One Manufacturer" (FAR 8.405-6(b)), as Nutanix is deemed fundamental to the mission and is a proprietary product where no other manufacturer can sell or renew these licenses. The document explains that failure to renew these licenses would require shutting down all virtual servers, including critical infrastructure like Water and Wastewater Treatment Plants, High Voltage, and Fire Alarm reporting services. Alternative solutions would require new hardware plus license costs exceeding $400,000, which is deemed prohibitively expensive. The procurement will be conducted under the Multiple-Award Schedule Program, and pricing will be determined using DoD Class Deviation 2014-O0011 and FAR 15.404-1 analysis techniques.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
FAR Subpart 8.4 Limited Sources Justification
CUI
V 1.4 (29 Nov 2023)
1. Date on which the requirement was first identified:
2. Required delivery date/period of performance:
3. Explanation of why delivery/commencement of services by the date mentioned above is required:
4. Market research:
5. If appropriate, include any additional pertinent information.
B. ___ ONLY ONE SOURCE IS CAPABLE OF PROVIDING THE SUPPLIES OR SERVICES
REQUIRED AT THE LEVEL OF QUALITY REQUIRED BECAUSE THE SUPPLIES OR
SERVICES ARE UNIQUE OR HIGHLY SPECIALIZED (FAR 8.405-6(a)(1)(i)(B)) (select all that apply):
1. ___ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.
2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.
3. ___ OTHER REASONS.
C. ___ IN THE INTEREST OF ECONOMY AND EFFICIENCY, THE NEW WORK IS A
LOGICAL FOLLOW-ON TO AN ORIGINAL FEDERAL SUPPLY SCHEDULE ORDER
(FAR 8.405-6(a)(1)(i)(C)):
The original order was placed in accordance with the applicable Federal Supply Schedule ordering procedures. The original order or BPA was not issued under sole-source or limited-sources procedures.
D. _X__ ITEMS PECULIAR TO ONE MANUFACTURER (FAR 8.405-6(b)):
Nutanix is fundamental to our mission. Nutanix is a proprietary product and no other manufacturer is authorized to sell or renew Nutanix licenses. Justifying the continued use of this software rests upon the irreplaceable nature of its existing design. If the Nutanix branded licenses are not renewed the installation will be required to shut down all virtual servers which includes the Water and Wastewater Treatment Plants, High Voltage, and Fire Alarm reporting services.
Alternatives require all new hardware plus license costs which is prohibitively expensive, in excess of $400,000.
CUI
FAR Subpart 8.4 Limited Sources Justification
CUI
V 1.4 (29 Nov 2023)
VI. DETERMINATION THAT THE ORDER OR BPA REPRESENTS THE BEST VALUE:
The Contracting Officer has determined that the order or BPA covered by this justification will represent the best value to the Government. Fair and reasonable pricing will be determined in accordance with DoD Class Deviation 2014-O0011 using the proposal analysis techniques at
FAR 15.404-1.
VII. DESCRIPTION OF THE MARKET RESEARCH CONDUCTED AMONG SCHEDULE
HOLDERS:
A discussion of the market research conducted among schedule holders and the results, or a reason market research was not conducted, is included in Section V, above.
VIII. ACTIONS TAKEN TO REMOVE OR OVERCOME BARRIERS:
For the reasons set forth in Part III, the activity has no plans at this time to take action to eliminate the barriers that led to restricted consideration for the types of supplies/services covered by this justification; however, this will be reassessed during follow-on acquisition planning.
VIII. CERTIFICATIONS, REVIEWS, AND APPROVALS:
TECHNICAL/REQUIREMENTS CERTIFICATION
I certify that the supporting data under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.
CONTRACTING OFFICER CERTIFICATION AND APPROVAL
File details come from the government source that posted it. Updated .