Amendment of Solicitation - CLINs.pdf

PDF 25 KB Posted

Attached to
Water Chemistry Controllers Federal contract opportunity
Solicitation number
M6700123Q1168
Issued by
United States Marine Corps

About this file

This amendment modifies two contract line items (CLINs) under a federal solicitation for water chemistry controllers. CLIN 0001 is updated to require a BECSys7 Equipment Room Controller with filtration control capabilities, along with sensors to enable monitoring and control functions. The line item now includes a lighted flow cell, CP-1 chlorine sensor, pH and ORP sensors, temperature sensors, and circuitry for additional sensors. CLIN 0002 is similarly updated to require a BECSys5 Chemical Controller with demand-based proportional feed, pH interlock of oxidant feed, and four 4-20mA input circuits. Both line items cover installation and require professional startup and operator training by a factory certified technician, along with a five-year warranty. The solicitation is issued by the United States Marine Corps for water chemistry controllers and associated services.

View the file

Other files for this federal contract opportunity

Other files attached to Water Chemistry Controllers, newest first.
File Type Posted
Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MMP1003313112

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment issued to reflect corrected part number and line item descriptions.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Aug-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M6700123Q1168

X 9B. DATED (SEE ITEM 11)

14-Aug-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Aug-2023

CODE

M67001MARINE CORPS FIELD CONTRACTING SYS

ATTN: TIFFANY MORRIS

PO BOX 8368 BLDG 316

CAMP LEJEUNE NC 28547

M67001 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

M6700123Q1168

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

Flow Switch integrated into Lighted Flow Cell Short (36in) Probe Wires115 VAC Input Power (standard)1 Gbit

Ethernet with EZConnect and USB port (standard)Platinum Band (standard)Circuit for CP-1 Chlorine SensorFour 4-

20mA Outputs (1 Board), 4 Loop Power Supplies FOR 4-20mA InputsHigh/low alarm settings, and are recorded in integral data logs.pH sensor featuring inorganic electrolyte for extended sensor lifeORP sensor featuring inorganic electrolyte and solid platinum sensing elementRTD temperature sensorTotal chlorine and free chlorine sensors, with high and low alarm settingsDerives combined chlorine, with high alarm setting, from total chlorine and free chlorine readingsValues recorded in internal data logs

To:

BECSys7 Equipment Room Controller- Gbit Ethernet-VFD-CP-1 Complete, with Filtration Control.Complete

Interactive System capable of controlling Chemistry, Water Level, Heaters, pumps (via MCC-VFD) andMonitoring of Chlorine Tank levels, Strainers and Turbidity. Filtration Control programming only - No Interface unless listed in line itemsMust be equipped with pertinent sensors to activate control & sensing featuresIncludes Lighted Flow Cell with integrated safety flow switch & BECS PVC mounting backplate,CP-1 PPM sensor for direct reading of

Chlorine residual, and 485 Circuit for expandability,BECS pH & ORP Sensors, Temperature Sensors.Features ultra fast GBit Communications with EZ Connect, TLS encryption and 1 year on board data storage.Open Architecture

Remote Monitoring, Remote Control, and Alert Notifications via available wired Ethernet or Wireless network.Digital flow sensor and saddle are not included, but available at an additional cost.Factory 5-year Factory

Electronics Warranty.115/230VAC, 50/60Hz, 32.25A full load (.25A controller, 32A for 9 relays -- 3A x 8. 8A x

1)Professional Start Up on BECSys7 Controller 1with filtration systemby Factory Certified Technician5 year

Factory WarrantyPSW7F Professional Start Up, Operator Training and Manufacturer's Warranty Administration on

BECSys7 Mechanical Room Controller with Filter InterfaceConnectionsStandard Installation of BECSys7

Mechanical Room 1Control SystemINST-7FStandard Installation of BECSys7 Mechanical Room Control System

(with Filtration) including sample stream for flow cell, with flow sensor and up to3 transducers, flow meter and saddle up to 50 ft. if purchased (up to five Filter Controller connections included) Maximum 25 ft. flow cell run.No wall penetrations included.Electrical By Others

CLIN 0002

The CLIN extended description has changed from:

Flow Switch Type: Integrated into Lighted Flow Cell Sensor Wire Length: Short (36 inch) Probe Wires4-20 mA

Inputs (4 standard): 16 bit analog to digital converterInput Voltage Selection: 115 VAC input powerPhase:

SingleCommunications: Gbit Ethernet with EZConnectEthernet (standard): 1gigabit (100BaseT and 10BaseT compatible)ORP Range/Resoultion: -1000 to +1000 mV/1mVORP Sensor Tip Material: Platinum BandChlorine

Sensor Circuitry: CP-1 Chlorine Sensor circuitry in controllerOption Board: Four 4-20mA outputs AND four loop power supplies for 4-20mA inputsFlow Cell: Lighted Flow Cell (pH, ORP, temp and CP-1) sensorFlow Volume:

M6700123Q1168

Records up to 999 trillion gallons or litersBack Panel: Preassembled on backpanelConductivity Sensot: No conductivity sensorpH Range/Resolution: 0 to 14 pH/User Selectable: 0.1 pH units or 0.01 pH unitsTemp

Range/Resolution: 32 to 212F / 1F or CFailsafe Overfeed Timer: Programmable in 1 min increments up to

18hrsSolid State Relay Outputs (4), each jumper selectable to: 1) "Line" setting: same as Controller Input Voltage:

115 VAC or 230 VAC2) "Common" Setting: Supports 24 to 280 VAC; Each Solid State Relay hasits own Common position provided to bring in Solid State Relay output voltage

To:

BECSys5 Chemical Controller Gbit Ethernet VFD CP-1 CompleteComplete Interactive System capable of controlling Chemistry, Water Level, Heaters, pumps (via MCC-VFD) andMonitoring of Chlorine Tank levels, Strainers and Turbidity.Must be equipped with pertinent sensors to activate control & sensing featuresIncludes

Lighted Flow Cell with integrated safety flow switch & BECS PVC mounting backplate, and CP-1 PPM sensor for direct reading of ChlorineresidualFeatures ultra fast GBit Communications with EZ Connect, TLS encryption and 1 year on board data storage.Open Architecture Remote Monitoring, Remote Control, and Alert Notifications via available wired Ethernet or Wireless network.Demand Based Proportional Feed and Failsafe Circuits, pH Interlock of Oxidant Feed for Failsafe and ProtectionBECS pH & ORP Sensors, Temperature Sensors, and (4) 4-20 circuits for monitoring and control of vac & press readings, autofill, TDS, etc.Digital flow sensor and saddle are not included, but available at an additional cost.Factory 5-year Factory Electronics Warranty115/230VAC, 50/60Hz, 12.25A full load (.25A controller, 12A for 3 relays -- 3A x 4)Standard Installation of BECSys5-PPM Chemical

Control 2SystemINST5PPMStandard Installation of BECSys5-PPM Chemical Control Systemincluding sample stream tubing for flow cell (25 feet maximum run)(Materials included if not listed under separate line item)No wall penetrations included.No Electrical IncludedProfessional Start Up & Operator Training on BECSys5

2ControllerPSW5-FVProfessional Start Up, Operator Training and Warranty Administration on BECSys5

Controller with, PPM Flow and VFD (if included) by FactoryCertified Technician.5 year Factory Warranty

(End of Summary of Changes)

File details come from the government source that posted it. Updated .