21Q1081 Amendment.docx
DOCX document 34 KB Posted
- Attached to
- Gantry Cranes Federal contract opportunity
- Solicitation number
- M6700121Q1081
- Issued by
- United States Marine Corps
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 21Q1081.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M6700121Q1081
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 19-Mar-2021 11:00 AM to 26-Mar-2021 11:00 AM.
The following have been added by full text:
QUESTIONS AND ANSWERS
4000lb Gantry Crane
RFQ M6700121Q1081
Questions Received and the Government Response
1. To achieve Navy compliance as required by the NAVFAC P-307 Appendix O Item 16, the RFQ is required to reference the standards outlined in the NAVCRANECEN Instruction 11450.1C. The Standing Crane Alteration, referenced in the RFQ, only contains requirements for the hoist and does not include the rest of the gantry crane design.
Gov’t response: There are no Standing Alt from NCC with regard to the gantry crane.
1. This RFQ contains references to design criteria inferring an ordnance handling and a National Electric Code (NEC) hazardous environment rating.
1. If this crane is ordnance handling, the Navy design standards will very from a General Purpose Service crane as defined by the Navy Crane Center; therefore, please state this as a requirement if applicable. See NAVCRANCEN Inst 11540.2A for ordnance handling design criteria for Navy cranes. For example, ordnance handling cranes must meet CMAA Class D service class for built-up designs and ASME HST-4 for COTS hoists.
Gov’t response: This gantry crane will not be used to lift ordnance.
1. If there is an applicable NEC hazard requirement, the RFQ/solicitation should state this to avoid getting a design that doesn’t comply with the NEC. Specifying detailed component design criteria increases the risk of missing a requirement applicable to the entire crane design.
Gov’t response: There are no electrical components on the Gantry crane. The gantry crane, with wheels will be manually moved and not require any electrical devices.
1. The RFQ does not specify all required submittals for a Navy compliant crane. Please see the attached UFGS-41 22 13.15 for the required submittals for Navy certification.
Gov’t response: The government will provide required submittals for this requirement.
1. The part 3.1.3 c), d), and e) are somewhat contradictory. The hoist that is asked for is a pneumatic hoist. There will be no wires or power cord. Can you explain exactly what is needed here?
Gov’t response: This is a Gantry crane, like an engine hoist. There are two parts, the hoist and the hook. This is not electric. The pneumatic hoist is able to be used with Air.
The following have been modified:
ADDENDUM 52.212-1
SUBMISSION OF QUOTES.
1. The vendor is responsible for ensuring that quotes are received in the Contracting Office no later than 26 March 2021 at 11:00 am as indicated on page one (1) of this solicitation. Failure of vendor’s quote to be received prior to the hour and date specified may result in rejection of the quote.
1. Quotes shall be submitted electronically via e-mail to ann.sanford@usmc.mil .
1. RFQ Number M6700121Q1081 must be clearly shown in the subject line.
2) INSTRUCTIONS FOR THE PREPARATION OF QUOTES: The vendor shall submit the following as part of their quote:
1. Information that demonstrates the vendor’s ability to perform the services in accordance with the requirements of the Purchase Description within the required period of performance.
1. Proposed completion schedule.
1. Quoted firm-fixed price for each line item shown - for completion of all services in accordance with the requirements of the Purchase Description.
1. Completed SF1449 to include:
i) Signed/completed page 1 (Blocks 17 and 30)
ii) Completed Representations and Certifications: The following representations and certifications must be completed and returned as part of the vendor’s quote
FAR 52.212-3 ( Note that vendor is only required to complete paragraph (b) if they have completed annual representations and certifications via the System for Award Management (SAM) website.)
1. Past Performance Information, to include the following:
i) Vendors may submit at least three (3) relevant past performance references. Relevant past performance is defined as performance of contracts similar in technical complexity to this requirement. Include the following information for each contract listed:
(a) Agency or company name.
(b) Contract number (if applicable).
(c) Point of Contact name, phone number and fax number.
(d) Brief description of contract and relevance to this requirement.
(e) Total contract value.
(f) Period of performance.
ii) If a vendor has no relevant past performance history, a vendor must affirmatively state that it possesses no relevant past performance history.
3) SYSTEM FOR AWARD MANAGEMENT/WIDE AREA WORKFLOW: Contractors interested in doing business with the government must be registered in the System for Award Management (SAM) at https://www.beta.sam.gov and the Wide Area Workflow (WAWF) invoicing system at https://piee.eb.mil.