Amendment 0001.docx
DOCX document 29 KB Posted
- Attached to
- Fill Dirt Federal contract opportunity
- Solicitation number
- M6700120Q1306
- Issued by
- United States Marine Corps
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M6700120Q1306
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS
Question 1- Clean Fill Dirt can be screen topsoil or screen fill dirt however screen topsoil is suitable for growth which one is requested ?
Answer 1- Screened structural fill dirt
Question 2- Is the Vendor responsible for stockpiling material once delivered to site or spreading material on landscape, what is the application ?
Answer 2- Contractor will be required to off load in the designated location on the range.
The government will have the material handling equipment to stock pile
Question 3- What is the ratio conversion tonnage to yardage some suppliers used cubic yards for purchase and weighing material ? (for example 1.1, 1.2, 1.3, conversion).
Answer 3- We calculated 1.35 ton per CuYd
(End of Summary of Changes) image1.wmf