STATEMENT OF WORK

M93070-12-SS-00048

This purchase and replacement of existing equipment located in HP411, 411 “L” Street, Camp Lejeune, NC, 28542. Purchase of Qty (1) Waste System, Pulper in pot shack. Request vendor come to a site visit to verifier that a Waste System, Pulper can removed and a new can be installed pot shack room.

The Scope of Work is as follows for an OCCUPIED BUILDING:

Operating Hours: Normal operating hours for mess hall for meals Monday through Friday Breakfast 05:30am-07:30am, Lunch 11:00am-1:00pm, Dinner 4:00pm-6:00pm. Saturday and Sunday Breakfast 08:30am-11:00am and Dinner 3:30pm-5:00pm.

A Pre-Installation meeting will be scheduled no later than 3 working days after Award of the Contract to discuss sequence of delivery/installation (e. g., removal date, and reinstall date). All issues and scheduling concerns for the building/site will be addressed at this meeting.

Delivery: Coordinate with Base Food Service (request delivery notification minimum of one week). The Contractor should provide a Manager to be on site throughout the entire project. The Project Manager should have authority to coordinate all services and issues through the Contracting and Base Food Service Office. All work will not be conducted during the above stated hours of operation.

Product/ Service Requirement:

Line Item 0001: Hobart Model 2010 Model WPS-1200 Waste Pulper System. Quantity 1 each.

Electrical:

-Pulper Motor: 6.0 horsepower, Total Enclosed Fan Cooled (TEFC) -Water press Motor: 2.0 horsepower, TEFC -Recirculating Pump Motor: 3.0Horsepower, TEFC Controls:

-Remote “Start-Stop” push –button station.

-Chemical pump standard -Prewired electrical control panel.

-NEMA 4 stainless steel enclosure.

-Magnetic-type motor contactors.

-Overload protection.

-Nominal 115 volt control circuit transformer. Junction box with terminal strips mounted on drive motor housing for easy access.

Salient characteristics:

-Pulper tank 25 ½ “investment cast with vibration isolation gasket -Pulper Tank Minimum gauge 316 stainless steel -Pulping disc made of stainless steel, minimum pulping disc diameter is 5 ½ “ -to include rotating delta shearing cutters for shearing action -tubular stainless steel legs, adjustable in either direction to level to uneven floor -Requirements for water consumption in 0 to 4 GPM with 25 psi line pressure -To include empty cycle that sprays hot water on the screen to reduce cleaning up time by 60%, as minimum labor is provided by ability one employees.

-12 o clock water press position -motorized drain valve with straight drain valve position -Straight chute position -Chemical pump, standard with system -12 inch trough to attach to existing dump station -to include trough magnet to collect silverware and components from going into puling system and damaging the system -Remote “Start-Stop” push button for ease of use for ability one employees -Hot and Cold water hose bibs required for daily cleaning of unit -supplied by vendor: heavy duty hose and squeeze valve

Line Item 0002: Installation Coordinate/schedule with a Base Food Service representative. The following is to be provided by the vendor who receives the contract: Remove existing Waste System Pulper Qty (1), Install new Waste System Pulper: Waste Pro Self-contained pulper Qty (1).

Installation requires all dimensions to be taken from floor lines and be made to fit to existing trough. Installation includes providing piping from fresh water supply to pulper, and from pulper to drain line to floor drain. Survey required to measure water pressure and determine if a pressure regulating valve is required to be installed in the water line. Recommend piping to be “M” copper. Trough return piping to be “L” copper; PVC piping not acceptable. Installation includes terminating fresh water line and trough connections with union or flange type. Hot and Cold water hose bibs to be installed accessible to unit with a heavy duty hose and squeeze valve; supplied by vendor. Installation must be so as to keep all floor drains cleared and accessible; plumbing must run uphill to trough connection; no external strain is acceptable to be exerted on pulper waste system. Additional electrical notes are provided in public works waiver.

Disconnect utilities and remove existing equipment from mess hall HP411 and return old equipment to Building 914 for government to dispose of. Uncrate new equipment set in place and connect to existing utilities. Make final connections within 5 feet of connection points.

Remove and discard all packing materials from install site. Load and transport new equipment from Bldg 914 warehouse to HP411. Distance from HP411 to Bldg 914 is approximately 5 miles.

1. Installation includes labor and picking up new equipment at Bldg 914 and transport to install site; Materials to disconnect existing equipment and re-install new equipment; Uncrate, set in place, Install and make final connections. Remove and discard all packing materials. Start up ensures equipment is working operating properly. Request site visit for electrical work for Installation at Mess Hall HP411. Includes for Waste System, Pulper has a 60amp disconnect switch and requires a 35 or 40 amp breaker on the customer wall panel.

2. Facility Damages: The contractor will be responsible for all damages to buildings and all grounds when installing the items/furnishings. Damages will be repaired by contractor before final inspection/invoicing.

3. Removal: Contractor is responsible for removal of all packing materials, debris, and trash associated with delivery and installation of said items. Items need to be installed and set up as functional—all plastics, tape, card board packaging, zip ties, and Styrofoam to be removed from the furniture. Once a week (maximum), some debris may be taken to the Materials Recycling Facility (MRF)/Landfill located on Piney Green Road (materials must be sorted as cardboard, plastic, and wood). Driver must have a copy of the contract and placard provided by Base Property to enter the site.

Salient characteristics:

Must be Hobart certified technician