Waste Water Treatment Plant SOW.docx

DOCX document 15 KB Posted

Attached to
Waste Water Treatment Plant Services
Solicitation number
M33610-12-T-0009
Issued by

About this file

Statement of Work for Waste Water Treatment Plant Services

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Marine Corps Mountain Warfare Training Center Waste Water Treatment Plant Statement of Work

1.0 Introduction

The mission of the Marine Corps Mountain Warfare Training Center (MCMWTC) is to provide the support required to enable our war fighters to succeed in their national defense mission. We are responsible for leadership in facilities acquisition, installation engineering/support and Seabees. Contingency engineering required by the Navy and Marine Corps team. With a commitment to delivering products and services interdependently, we offer customers a single focal point for a range of cost-effective choices to achieve their desired outcomes.

The primary work of this position is technical assistance to professional disciplines and the operations of the organization unit to which the incumbent is assigned. The incumbent performs specialized duties in specific functional or program areas involving a wide variety of problems and situations. The work involves identifying interrelationships, and taking action consistent with the objectives of the function or program supported. The work is of moderate difficulty and responsibility related to technical and professional lines.

2.0 Scope

The scope for this order is to provide the necessary employee level of expertise for performance of the tasks described in paragraph 7.0, and provide support for the overall operational objectives of the Marine Corps Mountain Warfare Training Center.

3.0 Period of Performance

The period of performance is 1 Sep 2012 through 31 Aug 2013. The period of performance may be extended or decreased as necessary to facilitate MCMWTC’s compliance (i.e. all reports and reporting and standard operational procedures) with regional, state and/or federal requirements for waste water treatment and potable water production.

4.0 Hours of Operation

Work is not expected to exceed 400 hours a year. Contractor’s performance will be certified by a Government representative each time the contractor provides the services. Invoices will not be processed without Government certification of services provided.

5.0 Place of Performance

The place of performance is the MCMWTC Waste Water Treatment Plant, Bldg 6010, potable water wells and associated facilities for onsite work as well as the Waste Water Treatment Plant, Water Productions Facilities and Storm Water Facilities at Coleville Family. Offsite work shall take place where needed as decided upon by the contractor at no additional cost to the Government.

6.0 Technical Point of Contact and Inspection and Acceptance

The Contracting Officer’s Technical Assistant under this performance based contract and the person(s) responsible for performing inspection an acceptance of the contractor’s performance at MCMWTC (i.e., destination) is/are:

TBD at time of contract award.

7.0 Tasks to be performed.

Contractor will provide oversight of the MCMWTC Wastewater and Potable Water Operations. Ensure the accurate and timely submittal of required reports to official agencies to ensure compliance of officially mandated time schedule orders. The Contractor must be able to respond on site within two hours should an emergency require their presents Contractor is expected to work mostly independently and carry out assignments in accordance with accepted practices, resolving most conflicts that arise. Completed work is evaluated for appropriateness and conformance to policy. Tasks may include, but are not limited to the following:

· Provide consulting services for all Waste Water and Potable Water operations and keep the Command informed of any potential problems making recommendations as to solutions. This requires a minimum of a California Class III wastewater operator license, a Grade II potable water treatment license and a Grade I potable water distribution system license, plus experience in operating activated sludge wastewater treatment systems, specifically sequencing batch reactors (SBRs).

· Submit regional, state, federal and DoD reports as needed and required, via Deputy Director Installation Logistics and Environmental Officer.

· Inform the command of issues related to operational readiness of the wastewater and potable water treatment processes, progress of report submittals and any correspondence with the regional, state and or federal regulatory agencies.

· Provide training as requested to plant employees, including laboratory analyses.

· Provide a technical review of wastewater/water construction and maintenance project submittals, and attend related on-site meetings as requested.

· Develop / make available operational manuals, documents and Training Center Orders needed to operate and maintain Waste Water and Potable Water Systems.

· Provide information for data calls required by outside agencies and higher headquarters.

· Provide Assistance for the Storm Water Management Program by advising and assisting the Command with development of a Storm Water Management Plan, compliance issues to include capturing samples, and testing as required.

· A minimum of one site visit per month.

8.0 Non Personal Service Statement

Contractor employees performing services under this order will be controlled, directed, and supervised at all times by management personnel of the contractor. Contractor management will ensure that employees properly comply with the performance work standards outlined in the statement of work. Contractor employees will perform their duties independent of, and without the supervision of, any Government official or other Defense Contractor. The tasks, duties, and responsibilities set forth in the task order may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying Federal policy, obligating the appropriate funds of the United States Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR). The Government will control access to the facility and will perform the inspection and acceptance of the completed work.

9.0 Invoicing Instructions

Invoices shall be processed in Wide Area Work Flow (WAWF).

File details come from the government source that posted it. Updated .