UNITAS TOT MHE SCHEDULE V2.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
UNITAS 21 MHE - TOT
Solicitation number
M2710021Q1203
Issued by

View the file

Other files

File Type Posted
21Q1203 Amendment 0002.pdf PDF
21Q1203 Amend 0001.pdf PDF
21Q1203 MHE Solicitation R.pdf PDF
UNITAS TOT MHE SCHEDULE.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOT TOP

MHE TOT Schedule$ - 0
Line #ComponentLocationService/Supply RequiredQty per dayUnit of IssueRequest StartRequest EndEstimated Unit Price (USD)# of Days/ DeliveriesTotal QtyEstimated Total Price (USD)Notes
1HMLAGrupo OchoForkLift 10K2Day9/209/22[$USD] 0.0036$ - 0On load and offload of supplies
2HMLAGrupo OchoTOW TRACTOR1Day9/2010/10[$USD] 0.002121$ - 0Tows aircraft and support equipment up to 80,000lbs with a max speed of 15mph. It has a tow hitch that can attach to any SE and requires a towbar specific to UH-1Y (PN: 1479AS500-1)
3HMLAGrupo OchoTow Tractor Trailer1Day9/2010/10[$USD] 0.002121$ - 0Compatible with Tow Tractor
4HMLAGrupo OchoK-Loader1Day9/209/22[$USD] 0.0033$ - 09/20-9/22 will be the window for (2) C17
5HMLAGrupo OchoCrane TEREX1Day9/2310/10[$USD] 0.001818$ - 0Heavy maintenance crane that is used only for removing and replacing aircraft components. The max rated load for the outriggers at full length(61ft) is 29,000lbs, with the boom angle at 71.5 degrees, and the load radius at a maximum 15 degrees.POP Change adding 4 days
6LCE main bodyAnconForkLift 10K1Day9/239/29[$USD] 0.0077$ - 0general support during the exercise
7LAR IquitosIquitosForkLift 10K1Day9/279/27[$USD] 0.0011$ - 0LAR bringing Recon QuadConCanceled
8SBTIquitosCrane1Day9/289/28[$USD] 0.0011$ - 0The craft weights 10Tons; Crane will have to be at least 20 ton minimum for safety requirements if possibleDate Change to 9/28
9SBTIquitosTT1Day9/289/28[$USD] 0.0011$ - 0Moving 10ton boat from local airport to Amazon River entry pointDate Change to 9/28
10LAR Main BodyAncon to SalinasTT5Day9/289/28[$USD] 0.0015$ - 0From Ancon to Salinas; To transport (4) LAV's (1) JLTV. Morning transportAdding transport back via line 10A
10ALAR Main BodySalinas to AnconTT5Day9/289/28[$USD] 0.0015$ - 0From Salinas to ancon; To transport (4) LAV's (1) JLTV. Evening TransportAdding transport back via line 10A
11SBTIquitosForkLift 10K1Day9/289/28[$USD] 0.0011$ - 0On load and offload of suppliesDate Change to 9/28
12LCE main bodyAnconCrane0Day9/299/29[$USD] 0.0000$ - 0loading 120 PAX troops on ship at Ancon (prep for D Day)Canceled
13LCE main bodyAnconTT0Day9/299/29[$USD] 0.0000$ - 0loading 120 PAX troops on ship at Ancon (prep for D Day)Canceled
14LCE main bodySalinasForkLift 10K2Day10/210/4[$USD] 0.0036$ - 0MHE on Salinas for general support (MRE, Bottled Water, Quadcons, Fuel, etc) required to go on sand
15LCE main bodySalinasCrane0Day10/410/4[$USD] 0.0000$ - 0On load and offload of suppliesCanceled
16HMLAGrupo OchoForkLift 10K2Day10/410/10[$USD] 0.00714$ - 0On load and offload of suppliesPOP Change adding 4 days
17HMLAGrupo OchoK-Loader1Day10/410/10[$USD] 0.0077$ - 0Will be used for the window for (2) C17POP Change adding 4 days
18SBTIquitosCrane1Day10/510/5[$USD] 0.0011$ - 0The craft weights 10Tons; Crane will have to be at least 20 ton minimum for safety requirements if possible
19SBTIquitosForkLift 10K1Day10/510/5[$USD] 0.0011$ - 0On load and offload of supplies
20SBTIquitosTT1Day10/510/5[$USD] 0.0011$ - 0Moving 10ton boat from Amazon River point to local airport

File details come from the government source that posted it. Updated .