This is a mechanical piping plan document for the Veterans Home in Holyoke, a Massachusetts state agency, in support of an HVAC Preventive Maintenance RFQ (TRD001) issued through the Massachusetts Operational Services Division. The document presents a detailed Level 8 overall mechanical piping plan with markup revisions (Revision 4), which appears to serve as a technical reference for the facility's HVAC system configuration. The plan is intended to provide bidders with comprehensive information regarding the existing piping infrastructure and mechanical systems that require preventive maintenance, inspection, testing, and related services. The document functions as a supporting exhibit to aid qualified vendors in understanding the scope and complexity of the HVAC systems at the facility and in developing accurate proposals for the maintenance services outlined in the primary scope of work.
The mechanical piping plan provides essential technical documentation that allows prospective bidders to assess the scale and specifications of the HVAC systems requiring maintenance services. As a technical exhibit supporting the RFQ process, this document enables vendors to evaluate site conditions, system complexity, and service requirements prior to submitting proposals. The plan's revision history (Revision 4) indicates ongoing refinement of facility documentation and ensures that bidders work from the most current technical specifications available for the Holyoke Veterans Home facility.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPM SPM
SPM
SPM
TT
TT
T
T T
T TT
T
T T
T
T
T
T
T
T
T
T
CO2
CO2
T
SPM
SPM
SPM
SPM
T
T
T
T
T
CO2
CO2
T
T T
T T
T T
T
T T
T
T
T
T
T
T
CO2
T
T
T
T
T
T
T
T
T
T
T
TT
T
CO2
T
T
T
T
T
BW CW
DW
EW
FW
GW
HW
JW
KW
LW
BE
CE
DE
EE
FE
GE
HE
JE
CS
GL
ES FS
GS
HS
JS
KS
LS
3E
2W
3N
4N
4E
1W
3W
2N
2E
1E
4W
1N
AW
AS
2W.2
AE
NW
MS
KE
BS
5N
4N.1
MATCH LINE
SEE 1/M2.08W1
MATCH LINE
SEE 1/M2.08W2
MATCH LINE
SEE 1/M2.08N2
MATCH LINE
SEE 1/M2.08N1
MATCH LINE
SEE 1/M2.08E2
MATCH LINE
SEE 1/M2.08E1
WCCU-8-01
AHU-S.1
N1
W1
E1
W2
N2
E2
S1
0'
Project Name:
DCAMM Project Number:
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
F ile
P a th
Original Issue Date
Revisions
Drawing Title:
Drawing Number:
Project Consultant
HLY2102
Payette Associates Inc.
290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 www.payette.com
Project Number:
40158.00
10' 20' 40'
HLY 00
N/A
256 HLY 0010
E.O.H.H.S
BR+A CONSULTING ENGINEERS
10 Guest Street, 4th Floor
Boston, MA 02135
617.254.0016 brplusa.com
B
IM
/H o ly o k e S o ld ie rs
H o m e /3
H
S H
C
S B
R
A H
V A
C
R .r v t
LEVEL 8 - OVERALL
MECHANICAL PIPING PLAN
M2.08
01/10/2023
SOLDIERS' HOME
IN HOLYOKE
LONG-TERM
CARE PROJECT
110 Cherry Street Holyoke, MA 01040
Level 8 - WCCU Schedule
BR+A HVAC Tag Equipment Type
WCCU-8-01 B4
WCCU-8-02 C4
WCCU-8-03 C4
WCCU-8-04 C4
WCCU-8-05 B4
WCCU-8-06 B4
1/16" = 1'-0"
LEVEL 8 - OVERALL MECHANICAL PIPING PLAN
Level 8 - Branch Selector Schedule
BR+A HVAC Tag BRA Equipment Type Identifier WCCU
BS-8-01 D6 WCCU-8-01
BS-8-02 C6 WCCU-8-02
BS-8-03 D6 WCCU-8-03
BS-8-04 C6 WCCU-8-04
BS-8-05 C6 WCCU-8-05
BS-8-06 D6 WCCU-8-06
Level 8 - VRF Schedule
BR+A HVAC
Tag
Equipment Type
Outside Air
(CFM)
Actual Supply
Airflow (CFM)
FCU-8-34 E1 100 350
FCU-8-35 F1 175 550
FCU-8-36 A1 200 200
FCU-8-37 C1 300 300
FCU-8-38 D1 250 325
FCU-8-40 A1 100 125
FCU-8-41 I1 250 875
FCU-8-42 A1 100 150
FCU-8-43 A1 50 150
FCU-8-44 A1 0 250
FCU-8-45 D1 50 250
FCU-8-46 A1 75 150
FCU-8-48 H1 375 800
FCU-8-49 H1 150 750
FCU-8-50 I1 175 850
FCU-8-51 A1 100 100
FCU-8-52 A1 200 200
FCU-8-53 C2 0 280
FCU-8-54 C2 0 280
FCU-8-55 D1 175 325
FCU-8-56 A1 100 200
FCU-8-57 A1 100 200
FCU-8-58 A1 200 200
FCU-8-59 K1 300 1200
FCU-8-60 A1 110 200
FCU-8-61 A1 110 200
FCU-8-62 A1 110 200
FCU-8-63 A1 110 200
FCU-8-64 A1 110 200
FCU-8-65 A1 110 200
FCU-8-66 A1 110 200
FCU-8-67 A1 110 200
FCU-8-68 E1 110 425
FCU-8-69 G1 175 675
FCU-8-70 A1 175 280
Level 8 - VRF Schedule
BR+A HVAC
Tag
Equipment Type
Outside Air
(CFM)
Actual Supply
Airflow (CFM)
FCU-8-01 E1 200 300
FCU-8-02 E1 125 650
FCU-8-03 E1 500 500
FCU-8-04 A1 50 150
FCU-8-05 A1 100 200
FCU-8-06 E1 375 925
FCU-8-07 F1 475 975
FCU-8-08 I1 575 875
FCU-8-09 E1 100 375
FCU-8-09B D2 0 500
FCU-8-17 E1 275 500
FCU-8-18 K1 550 1275
FCU-8-19 K1 525 1250
FCU-8-20 G1 250 650
FCU-8-21 D1 125 175
FCU-8-22 A1 110 200
FCU-8-23 A1 110 200
FCU-8-24 A1 110 200
FCU-8-25 A1 200 200
FCU-8-26 K1 275 1150
FCU-8-27 E1 110 350
FCU-8-28 A1 110 200
FCU-8-29 A1 110 200
FCU-8-30 A1 110 200
FCU-8-31 A1 110 200
FCU-8-32 A1 110 200
FCU-8-33 A1 110 200
No. Description Date
1 Bulletin #008 09/26/2023
2 BULLETIN #039 04/19/2024
3 BULLETIN #118 05/16/2025
4 BULLETIN #141 09/26/2025
https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441134 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441116 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441137 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441105 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441132 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441095
File details come from the government source that posted it. Updated .