M2.08_ LEVEL 8 - OVERALL MECHANICAL PIPING PLAN Rev.4 markup.pdf

PDF 2 MB Posted

Attached to
HVAC Preventive Maintenance RFQ TRD001
Solicitation number
BD-27-1053-1053C-CSR-132434
Issued by
Hampden County, Massachusetts

About this file

This is a mechanical piping plan document for the Veterans Home in Holyoke, a Massachusetts state agency, in support of an HVAC Preventive Maintenance RFQ (TRD001) issued through the Massachusetts Operational Services Division. The document presents a detailed Level 8 overall mechanical piping plan with markup revisions (Revision 4), which appears to serve as a technical reference for the facility's HVAC system configuration. The plan is intended to provide bidders with comprehensive information regarding the existing piping infrastructure and mechanical systems that require preventive maintenance, inspection, testing, and related services. The document functions as a supporting exhibit to aid qualified vendors in understanding the scope and complexity of the HVAC systems at the facility and in developing accurate proposals for the maintenance services outlined in the primary scope of work.

The mechanical piping plan provides essential technical documentation that allows prospective bidders to assess the scale and specifications of the HVAC systems requiring maintenance services. As a technical exhibit supporting the RFQ process, this document enables vendors to evaluate site conditions, system complexity, and service requirements prior to submitting proposals. The plan's revision history (Revision 4) indicates ongoing refinement of facility documentation and ensures that bidders work from the most current technical specifications available for the Holyoke Veterans Home facility.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPM SPM

SPM

SPM

TT

TT

T

T T

T TT

T

T T

T

T

T

T

T

T

T

T

CO2

CO2

T

SPM

SPM

SPM

SPM

T

T

T

T

T

CO2

CO2

T

T T

T T

T T

T

T T

T

T

T

T

T

T

CO2

T

T

T

T

T

T

T

T

T

T

T

TT

T

CO2

T

T

T

T

T

BW CW

DW

EW

FW

GW

HW

JW

KW

LW

BE

CE

DE

EE

FE

GE

HE

JE

CS

GL

ES FS

GS

HS

JS

KS

LS

3E

2W

3N

4N

4E

1W

3W

2N

2E

1E

4W

1N

AW

AS

2W.2

AE

NW

MS

KE

BS

5N

4N.1

MATCH LINE

SEE 1/M2.08W1

MATCH LINE

SEE 1/M2.08W2

MATCH LINE

SEE 1/M2.08N2

MATCH LINE

SEE 1/M2.08N1

MATCH LINE

SEE 1/M2.08E2

MATCH LINE

SEE 1/M2.08E1

WCCU-8-01

AHU-S.1

N1

W1

E1

W2

N2

E2

S1

0'

Project Name:

DCAMM Project Number:

Project Location

Project Architect

Site Number:

CAMIS Number:

Building Number:

Secretariat:

F ile

P a th

Original Issue Date

Revisions

Drawing Title:

Drawing Number:

Project Consultant

HLY2102

Payette Associates Inc.

290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 www.payette.com

Project Number:

40158.00

10' 20' 40'

HLY 00

N/A

256 HLY 0010

E.O.H.H.S

BR+A CONSULTING ENGINEERS

10 Guest Street, 4th Floor

Boston, MA 02135

617.254.0016 brplusa.com

B

IM

/H o ly o k e S o ld ie rs

H o m e /3

H

S H

C

S B

R

A H

V A

C

R .r v t

LEVEL 8 - OVERALL

MECHANICAL PIPING PLAN

M2.08

01/10/2023

SOLDIERS' HOME

IN HOLYOKE

LONG-TERM

CARE PROJECT

110 Cherry Street Holyoke, MA 01040

Level 8 - WCCU Schedule

BR+A HVAC Tag Equipment Type

WCCU-8-01 B4

WCCU-8-02 C4

WCCU-8-03 C4

WCCU-8-04 C4

WCCU-8-05 B4

WCCU-8-06 B4

1/16" = 1'-0"

LEVEL 8 - OVERALL MECHANICAL PIPING PLAN

Level 8 - Branch Selector Schedule

BR+A HVAC Tag BRA Equipment Type Identifier WCCU

BS-8-01 D6 WCCU-8-01

BS-8-02 C6 WCCU-8-02

BS-8-03 D6 WCCU-8-03

BS-8-04 C6 WCCU-8-04

BS-8-05 C6 WCCU-8-05

BS-8-06 D6 WCCU-8-06

Level 8 - VRF Schedule

BR+A HVAC

Tag

Equipment Type

Outside Air

(CFM)

Actual Supply

Airflow (CFM)

FCU-8-34 E1 100 350

FCU-8-35 F1 175 550

FCU-8-36 A1 200 200

FCU-8-37 C1 300 300

FCU-8-38 D1 250 325

FCU-8-40 A1 100 125

FCU-8-41 I1 250 875

FCU-8-42 A1 100 150

FCU-8-43 A1 50 150

FCU-8-44 A1 0 250

FCU-8-45 D1 50 250

FCU-8-46 A1 75 150

FCU-8-48 H1 375 800

FCU-8-49 H1 150 750

FCU-8-50 I1 175 850

FCU-8-51 A1 100 100

FCU-8-52 A1 200 200

FCU-8-53 C2 0 280

FCU-8-54 C2 0 280

FCU-8-55 D1 175 325

FCU-8-56 A1 100 200

FCU-8-57 A1 100 200

FCU-8-58 A1 200 200

FCU-8-59 K1 300 1200

FCU-8-60 A1 110 200

FCU-8-61 A1 110 200

FCU-8-62 A1 110 200

FCU-8-63 A1 110 200

FCU-8-64 A1 110 200

FCU-8-65 A1 110 200

FCU-8-66 A1 110 200

FCU-8-67 A1 110 200

FCU-8-68 E1 110 425

FCU-8-69 G1 175 675

FCU-8-70 A1 175 280

Level 8 - VRF Schedule

BR+A HVAC

Tag

Equipment Type

Outside Air

(CFM)

Actual Supply

Airflow (CFM)

FCU-8-01 E1 200 300

FCU-8-02 E1 125 650

FCU-8-03 E1 500 500

FCU-8-04 A1 50 150

FCU-8-05 A1 100 200

FCU-8-06 E1 375 925

FCU-8-07 F1 475 975

FCU-8-08 I1 575 875

FCU-8-09 E1 100 375

FCU-8-09B D2 0 500

FCU-8-17 E1 275 500

FCU-8-18 K1 550 1275

FCU-8-19 K1 525 1250

FCU-8-20 G1 250 650

FCU-8-21 D1 125 175

FCU-8-22 A1 110 200

FCU-8-23 A1 110 200

FCU-8-24 A1 110 200

FCU-8-25 A1 200 200

FCU-8-26 K1 275 1150

FCU-8-27 E1 110 350

FCU-8-28 A1 110 200

FCU-8-29 A1 110 200

FCU-8-30 A1 110 200

FCU-8-31 A1 110 200

FCU-8-32 A1 110 200

FCU-8-33 A1 110 200

No. Description Date

1 Bulletin #008 09/26/2023

2 BULLETIN #039 04/19/2024

3 BULLETIN #118 05/16/2025

4 BULLETIN #141 09/26/2025

https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441134 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441116 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441137 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441105 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441132 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441095

File details come from the government source that posted it. Updated .