M2.04_ LEVEL 4 - OVERALL MECHANICAL PIPING PLAN Rev.4 markup.pdf
PDF 2 MB Posted
- Attached to
- HVAC Preventive Maintenance RFQ TRD001
- Solicitation number
- BD-27-1053-1053C-CSR-132434
- Issued by
- Hampden County, Massachusetts
About this file
Summary
This is an architectural drawing document for the Soldiers' Home in Holyoke Long-Term Care Project in Massachusetts, specifically a Level 4 Overall Mechanical Piping Plan prepared by Payette Associates Inc. and BR+A Consulting Engineers. The drawing, numbered M2.04 and originally issued on January 10, 2023, details the HVAC systems for the fourth floor of the facility located at 110 Cherry Street, Holyoke, MA 01040. The plan includes comprehensive schedules for mechanical equipment including six Water-Cooled Condenser Units (WCCU), six Branch Selectors (BS), and sixty-eight Fan Coil Units (FCU) with specified outside air intake and actual supply airflow capacities ranging from 0 to 1,275 CFM. The drawing has undergone four revisions, with the most recent bulletin (Bulletin #141) dated September 26, 2025. The document includes detailed piping layouts, equipment locations, and match line references for adjacent building sections.
The drawing serves as a technical reference document for the HVAC preventive maintenance, inspection, and testing services solicitation referenced in the related Massachusetts contract opportunity. This architectural plan provides the baseline mechanical system design and specifications that contractors responding to the HVAC Preventive Maintenance RFQ would use to understand the scope and complexity of systems requiring maintenance at the facility. The document contains no pricing information, contract terms, or financial requirements, as it functions solely as a technical specification and planning document for the capital project's mechanical systems.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TT
TT
T
T T
T TT
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
CO2
CO2
CO2
CO2
CO2
T
T
T
T
CO2
T
T T
T T
T T
T
T T
T
T
T
T
T
T
T
CO2
CO2
CO2
T
T
T
T
CO2
T T
T T
T T
T
T
T T
T T
T
T
T
T
T
CO2
CO2
SPM SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
T
BW CW
DW
EW
FW
GW
HW
JW
KW
LW
BE
CE
DE
EE
FE
GE
HE
JE
CS
GL
ES FS
GS
HS
JS
KS
LS
3E
2W
3N
4N
4E
1W
3W
2N
2E
1E
4W
1N
AW
AS
2W.2
AE
NW
MS
KE
BS
5N
4N.1
MATCH LINE
SEE 1/M2.04W1
MATCH LINE
SEE 1/M2.04W2
MATCH LINE
SEE 1/M2.04N2
MATCH LINE
SEE 1/M2.04N1
MATCH LINE
SEE 1/M2.04E2
MATCH LINE
SEE 1/M2.04E1
N1
W1
E1
W2
N2
E2
S1
0'
Project Name:
DCAMM Project Number:
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
F ile
P a th
Original Issue Date
Revisions
Drawing Title:
Drawing Number:
Project Consultant
HLY2102
Payette Associates Inc.
290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 www.payette.com
Project Number:
40158.00
10' 20' 40'
HLY 00
N/A
256 HLY 0010
E.O.H.H.S
BR+A CONSULTING ENGINEERS
10 Guest Street, 4th Floor
Boston, MA 02135
617.254.0016 brplusa.com
B
IM
/H o ly o k e S o ld ie rs
H o m e /3
H
S H
C
S B
R
A H
V A
C
R .r v t
LEVEL 4 - OVERALL
MECHANICAL PIPING PLAN
M2.04
01/10/2023
SOLDIERS' HOME
IN HOLYOKE
LONG-TERM
CARE PROJECT
110 Cherry Street Holyoke, MA 01040
Level 4 - WCCU Schedule
BR+A HVAC Tag Equipment Type
WCCU-4-01 A4
WCCU-4-02 B4
WCCU-4-03 B4
WCCU-4-04 C4
WCCU-4-05 B4
WCCU-4-06 B4
1/16" = 1'-0"
LEVEL 4 - OVERALL MECHANICAL PIPING PLAN
Level 4 - Branch Selector Schedule
BR+A HVAC Tag Unit Type WCCU
BS-4-01 D6 WCCU-4-01
BS-4-02 D6 WCCU-4-02
BS-4-03 D6 WCCU-4-03
BS-4-04 C6 WCCU-4-04
BS-4-05 C6 WCCU-4-05
BS-4-06 D6 WCCU-4-06
Level 4 - VRF Schedule
BR+A HVAC
Tag
Equipment Type
Outside Air
(CFM)
Actual Supply
Airflow (CFM)
FCU-4-34 E1 100 350
FCU-4-35 F1 175 565
FCU-4-36 A1 200 200
FCU-4-37 C1 300 300
FCU-4-38 D1 50 205
FCU-4-39 A1 175 280
FCU-4-40 A1 100 125
FCU-4-41 I1 250 1050
FCU-4-42 A1 100 150
FCU-4-43 A1 50 150
FCU-4-44 A1 200 225
FCU-4-45 A1 50 125
FCU-4-46 A1 100 200
FCU-4-47 G1 175 665
FCU-4-48 H1 375 800
FCU-4-49 H1 150 775
FCU-4-50 I1 175 850
FCU-4-51 A1 100 175
FCU-4-52 A1 205 205
FCU-4-53 C2 0 280
FCU-4-54 C2 0 280
FCU-4-55 D1 175 325
FCU-4-56 A1 110 200
FCU-4-57 A1 110 200
FCU-4-58 A1 110 200
FCU-4-59 K1 300 1200
FCU-4-60 A1 110 200
FCU-4-61 A1 110 200
FCU-4-62 A1 110 200
FCU-4-63 A1 110 200
FCU-4-64 A1 110 200
FCU-4-65 A1 110 200
FCU-4-66 A1 110 200
FCU-4-67 A1 110 200
FCU-4-68 E1 110 425
Level 4 - VRF Schedule
BR+A HVAC
Tag
Equipment Type
Outside Air
(CFM)
Actual Supply
Airflow (CFM)
FCU-4-01 I1 200 925
FCU-4-02 E1 110 350
FCU-4-03 A1 110 200
FCU-4-04 A1 110 200
FCU-4-05 A1 110 200
FCU-4-06 A1 110 200
FCU-4-07 A1 110 200
FCU-4-08 A1 110 200
FCU-4-09 A1 110 200
FCU-4-09B D2 0 500
FCU-4-10 A1 110 200
FCU-4-11 A1 110 200
FCU-4-12 A1 110 200
FCU-4-13 F1 175 550
FCU-4-14 A1 225 225
FCU-4-15 A1 25 100
FCU-4-16 A1 250 275
FCU-4-17 E1 200 500
FCU-4-18 K1 550 1275
FCU-4-19 K1 525 1275
FCU-4-20 G1 250 650
FCU-4-21 A1 125 250
FCU-4-22 A1 110 200
FCU-4-23 A1 110 200
FCU-4-24 A1 110 200
FCU-4-25 A1 110 200
FCU-4-26 K1 275 1150
FCU-4-27 E1 110 350
FCU-4-28 A1 110 200
FCU-4-29 A1 110 200
FCU-4-30 A1 110 200
FCU-4-31 A1 110 200
FCU-4-32 A1 110 200
FCU-4-33 A1 110 200
No. Description Date
1 Bulletin #008 09/26/2023
2 BULLETIN #039 04/19/2024
3 BULLETIN #088 12/23/2024
4 BULLETIN #141 09/26/2025
https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441112 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441067 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441123 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441125 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441033 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441036
File details come from the government source that posted it. Updated .