M2.03_ LEVEL 3 - OVERALL MECHANICAL PIPING PLAN Rev.4 markup (1).pdf
PDF 2 MB Posted
- Attached to
- HVAC Preventive Maintenance RFQ TRD001
- Solicitation number
- BD-27-1053-1053C-CSR-132434
- Issued by
- Hampden County, Massachusetts
About this file
This is a Level 3 Overall Mechanical Piping Plan document for the Soldiers' Home in Holyoke Long-Term Care Project located at 110 Cherry Street in Holyoke, Massachusetts. The plan, prepared by Payette Associates Inc. and BR+A Consulting Engineers, provides comprehensive mechanical piping design specifications for the third floor of the facility's HVAC systems. The document includes detailed equipment schedules for multiple HVAC components, including six Water-Source Heat Pump units (WCCU), 68 Fan Coil Units (FCU) with varying outside air and actual supply airflow capacities ranging from 0 to 550 CFM outside air and 100 to 1,275 CFM supply airflow, and six Branch Selector units. The plan is drawn at a scale of 1/16" = 1'-0" and indicates match lines for integration with adjacent sections (N1, N2, E1, E2, W1, W2, and S1). The document has undergone four revisions, with the original issue date of January 10, 2023, and subsequent bulletins issued on September 26, 2023; April 19, 2024; December 23, 2024; and September 26, 2025.
The mechanical piping plan serves as a technical design document supporting the HVAC Preventive Maintenance RFQ (TRD001) issued by the Veterans Home in Holyoke, a Massachusetts state agency. This plan provides the foundational specifications and equipment layout necessary for qualified vendors to develop comprehensive preventive maintenance, inspection, and testing proposals under the Massachusetts Operational Services Division TRD01 contract. The detailed equipment schedules and piping configurations shown in this document enable bidders to understand the scope and complexity of the facility's HVAC systems and formulate accurate maintenance service proposals.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPM SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
TT
TT
T
T T
T TT
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
CO2
CO2
CO2
CO2
CO2
CO2
T
T T
T T
T T
T
T T
T
T
T
T
T
T
T T
T T
T T
T
T
T T
T T
T
T
T
T
T
T
CO2
CO2
CO2
CO2
CO2
CO2
BW CW
DW
EW
FW
GW
HW
JW
KW
LW
BE
CE
DE
EE
FE
GE
HE
JE
CS
GL
ES FS
GS
HS
JS
KS
LS
3E
2W
3N
4N
4E
1W
3W
2N
2E
1E
4W
1N
AW
AS
2W.2
AE
NW
MS
KE
BS
5N
4N.1
MATCH LINE
SEE 1/M2.03W1
MATCH LINE
SEE 1/M2.03W2
MATCH LINE
SEE 1/M2.03N2
MATCH LINE
SEE 1/M2.03N1
MATCH LINE
SEE 1/M2.03E2
MATCH LINE
SEE 1/M2.03E1
N1
W1
E1
W2
N2
E2
S1
0'
Project Name:
DCAMM Project Number:
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
F ile
P a th
Original Issue Date
Revisions
Drawing Title:
Drawing Number:
Project Consultant
HLY2102
Payette Associates Inc.
290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 www.payette.com
Project Number:
40158.00
10' 20' 40'
HLY 00
N/A
256 HLY 0010
E.O.H.H.S
BR+A CONSULTING ENGINEERS
10 Guest Street, 4th Floor
Boston, MA 02135
617.254.0016 brplusa.com
B
IM
/H o ly o k e S o ld ie rs
H o m e /3
H
S H
C
S B
R
A H
V A
C
R .r v t
LEVEL 3 - OVERALL
MECHANICAL PIPING PLAN
M2.03
01/10/2023
SOLDIERS' HOME
IN HOLYOKE
LONG-TERM
CARE PROJECT
110 Cherry Street Holyoke, MA 01040
Level 3 - WCCU Schedule
BR+A HVAC Tag Equipment Type
WCCU-3-01 A4
WCCU-3-02 B4
WCCU-3-03 B4
WCCU-3-04 C4
WCCU-3-05 B4
WCCU-3-06 B4
Level 3 - VRF Schedule
BR+A HVAC
Tag
Equipment Type
Outside Air
(CFM)
Actual Supply
Airflow (CFM)
FCU-3-34 E1 100 350
FCU-3-35 F1 175 565
FCU-3-36 A1 200 200
FCU-3-37 C1 300 300
FCU-3-38 D1 50 205
FCU-3-39 A1 175 280
FCU-3-40 A1 100 125
FCU-3-41 I1 250 1050
FCU-3-42 A1 100 150
FCU-3-43 A1 50 150
FCU-3-44 A1 200 225
FCU-3-45 A1 50 125
FCU-3-46 A1 100 200
FCU-3-47 G1 175 665
FCU-3-48 H1 375 800
FCU-3-49 H1 150 775
FCU-3-50 I1 175 850
FCU-3-51 A1 100 175
FCU-3-52 A1 205 205
FCU-3-53 C2 0 280
FCU-3-54 C2 0 280
FCU-3-55 D1 175 325
FCU-3-56 A1 110 200
FCU-3-57 A1 110 200
FCU-3-58 A1 110 200
FCU-3-59 K1 300 1200
FCU-3-60 A1 110 200
FCU-3-61 A1 110 200
FCU-3-62 A1 110 200
FCU-3-63 A1 110 200
FCU-3-64 A1 110 200
FCU-3-65 A1 110 200
FCU-3-66 A1 110 200
FCU-3-67 A1 110 200
FCU-3-68 E1 110 425
Level 3 - VRF Schedule
BR+A HVAC
Tag
Equipment Type
Outside Air
(CFM)
Actual Supply
Airflow (CFM)
FCU-3-01 I1 200 925
FCU-3-02 E1 110 350
FCU-3-03 A1 110 200
FCU-3-04 A1 110 200
FCU-3-05 A1 110 200
FCU-3-06 A1 110 200
FCU-3-07 A1 110 200
FCU-3-08 A1 110 200
FCU-3-09 A1 110 200
FCU-3-09B D2 0 500
FCU-3-10 A1 110 200
FCU-3-11 A1 110 200
FCU-3-12 A1 110 200
FCU-3-13 F1 175 550
FCU-3-14 A1 225 225
FCU-3-15 A1 25 100
FCU-3-16 A1 250 275
FCU-3-17 E1 200 500
FCU-3-18 K1 550 1275
FCU-3-19 K1 525 1275
FCU-3-20 G1 250 650
FCU-3-21 A1 125 250
FCU-3-22 A1 110 200
FCU-3-23 A1 110 200
FCU-3-24 A1 110 200
FCU-3-25 A1 110 200
FCU-3-26 K1 275 1150
FCU-3-27 E1 110 350
FCU-3-28 A1 110 200
FCU-3-29 A1 110 200
FCU-3-30 A1 110 200
FCU-3-31 A1 110 200
FCU-3-32 A1 110 200
FCU-3-33 A1 110 200
Level 3 - Branch Selector Schedule
BR+A HVAC Tag Unit Type WCCU
BS-3-01 D6 WCCU-3-01
BS-3-02 D6 WCCU-3-02
BS-3-03 D6 WCCU-3-03
BS-3-04 C6 WCCU-3-04
BS-3-05 C6 WCCU-3-05
BS-3-06 D6 WCCU-3-06
1/16" = 1'-0"
LEVEL 3 - OVERALL MECHANICAL PIPING PLAN
No. Description Date
1 Bulletin #008 09/26/2023
2 BULLETIN #039 04/19/2024
3 BULLETIN #088 12/23/2024
4 BULLETIN #141 09/26/2025
https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441091 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441122 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441013 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441113 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441044 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441059
File details come from the government source that posted it. Updated .