About this file
This document is a mechanical piping plan for the Veterans Home in Holyoke, a Massachusetts state agency seeking HVAC preventive maintenance services under the Massachusetts Operational Services Division TRD01 contract. The plan represents Revision 4 with markup annotations and serves as a technical schematic detailing the overall mechanical piping infrastructure at the facility. The document functions as a supporting exhibit to the HVAC Preventive Maintenance RFQ TRD001, which solicits qualified vendors to provide preventive maintenance, inspection, testing, and related services for the facility's HVAC systems. Bidders are directed to review the scope document and participate in a bidder walkthrough to understand the full extent of services required and facility conditions.
The mechanical piping plan provides the technical specifications and layout necessary for vendors to assess the scope of work, develop accurate proposals, and understand the complexity of the HVAC system requiring maintenance. As a supporting exhibit rather than a pricing or contractual document, this plan does not directly address pricing terms, contract duration, or award information. Vendors utilizing this document must cross-reference the primary scope of work document to understand response deadlines, evaluation criteria, and other procurement specifics related to the RFQ.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TT
TT
T
T T
T TT
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
CO2
CO2
CO2
CO2
CO2
T
T
T
T
CO2
T
T T
T T
T T
T
T T
T
T
T
T
T
T
T
CO2
CO2
CO2
T
T
T
T
CO2
T T
T T
T T
T
T
T T
T T
T
T
T
T
T
CO2
CO2
SPM SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
T
BW CW
DW
EW
FW
GW
HW
JW
KW
LW
BE
CE
DE
EE
FE
GE
HE
JE
CS
GL
ES FS
GS
HS
JS
KS
LS
3E
2W
3N
4N
4E
1W
3W
2N
2E
1E
4W
1N
AW
AS
2W.2
AE
NW
MS
KE
BS
5N
4N.1
MATCH LINE
SEE 1/M2.05W1
MATCH LINE
SEE 1/M2.05W2
MATCH LINE
SEE 1/M2.05N2
MATCH LINE
SEE 1/M2.05N1
MATCH LINE
SEE 1/M2.05E2
MATCH LINE
SEE 1/M2.05E1
N1
W1
E1
W2
N2
E2
S1
0'
Project Name:
DCAMM Project Number:
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
F ile
P a th
Original Issue Date
Revisions
Drawing Title:
Drawing Number:
Project Consultant
HLY2102
Payette Associates Inc.
290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 www.payette.com
Project Number:
40158.00
10' 20' 40'
HLY 00
N/A
256 HLY 0010
E.O.H.H.S
BR+A CONSULTING ENGINEERS
10 Guest Street, 4th Floor
Boston, MA 02135
617.254.0016 brplusa.com
B
IM
/H o ly o k e S o ld ie rs
H o m e /3
H
S H
C
S B
R
A H
V A
C
R .r v t
LEVEL 5 - OVERALL
MECHANICAL PIPING PLAN
M2.05
01/10/2023
SOLDIERS' HOME
IN HOLYOKE
LONG-TERM
CARE PROJECT
110 Cherry Street Holyoke, MA 01040
Level 5 -...
BR+A HVAC Tag Equipment Type
WCCU-5-01 A4
WCCU-5-02 B4
WCCU-5-03 B4
WCCU-5-04 C4
WCCU-5-05 B4
WCCU-5-06 B4
1/16" = 1'-0"
LEVEL 5 - OVERALL MECHANICAL PIPING PLAN
Level 5 - Branch Selector Schedule
BR+A HVAC Tag Unit Type WCCU
BS-5-01 D6 WCCU-5-01
BS-5-02 D6 WCCU-5-02
BS-5-03 D6 WCCU-5-03
BS-5-04 C6 WCCU-5-04
BS-5-05 C6 WCCU-5-05
BS-5-06 D6 WCCU-5-06
Level 5 - VRF...
BR+A HVAC
Tag Equipment
Type Outside Air
(CFM)
Actual Supply
Airflow (CFM)
FCU-5-34 E1 100 350
FCU-5-35 F1 175 565
FCU-5-36 A1 200 200
FCU-5-37 C1 300 300
FCU-5-38 D1 50 205
FCU-5-39 A1 175 280
FCU-5-40 A1 100 125
FCU-5-41 I1 250 1050
FCU-5-42 A1 100 150
FCU-5-43 A1 50 150
FCU-5-44 A1 200 225
FCU-5-45 A1 50 125
FCU-5-46 A1 100 200
FCU-5-47 G1 175 665
FCU-5-48 H1 375 800
FCU-5-49 H1 150 775
FCU-5-50 I1 175 850
FCU-5-51 A1 100 175
FCU-5-52 A1 205 205
FCU-5-53 C2 0 280
FCU-5-54 C2 0 280
FCU-5-55 D1 175 325
FCU-5-56 A1 110 200
FCU-5-57 A1 110 200
FCU-5-58 A1 110 200
FCU-5-59 K1 300 1200
FCU-5-60 A1 110 200
FCU-5-61 A1 110 200
FCU-5-62 A1 110 200
FCU-5-63 A1 110 200
FCU-5-64 A1 110 200
FCU-5-65 A1 110 200
FCU-5-66 A1 110 200
FCU-5-67 A1 110 200
FCU-5-68 E1 110 425
Level 5 - VRF...
BR+A HVAC
Tag Equipment
Type Outside Air
(CFM)
Actual Supply
Airflow (CFM)
FCU-5-01 I1 200 925
FCU-5-02 E1 110 350
FCU-5-03 A1 110 200
FCU-5-04 A1 110 200
FCU-5-05 A1 110 200
FCU-5-06 A1 110 200
FCU-5-07 A1 110 200
FCU-5-08 A1 110 200
FCU-5-09 A1 110 200
FCU-5-09B D2 0 500
FCU-5-10 A1 110 200
FCU-5-11 A1 110 200
FCU-5-12 A1 110 200
FCU-5-13 F1 175 550
FCU-5-14 A1 225 225
FCU-5-15 A1 25 100
FCU-5-16 A1 250 275
FCU-5-17 E1 200 500
FCU-5-18 K1 550 1275
FCU-5-19 K1 525 1275
FCU-5-20 G1 250 650
FCU-5-21 A1 125 250
FCU-5-22 A1 110 200
FCU-5-23 A1 110 200
FCU-5-24 A1 110 200
FCU-5-25 A1 110 200
FCU-5-26 K1 275 1150
FCU-5-27 E1 110 350
FCU-5-28 A1 110 200
FCU-5-29 A1 110 200
FCU-5-30 A1 110 200
FCU-5-31 A1 110 200
FCU-5-32 A1 110 200
FCU-5-33 A1 110 200
No. Description Date
1 Bulletin #008 09/26/2023
2 BULLETIN #039 04/19/2024
3 BULLETIN #088 12/23/2024
4 BULLETIN #141 09/26/2025
https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441014 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441035 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441043 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441048 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441135 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441081
File details come from the government source that posted it. Updated .