About this file
This document is a mechanical piping plan revision for the Veterans Home in Holyoke, a Massachusetts state agency, prepared as supporting technical documentation for an HVAC Preventive Maintenance RFQ (TRD001) under the Massachusetts Operational Services Division contract framework. The plan represents Level 7 overall mechanical piping design and is marked as Revision 4, indicating an iterative design development process. The document serves as a technical reference for qualified vendors responding to the preventive maintenance, inspection, testing, and related services solicitation for the facility's HVAC systems. This plan provides vendors with detailed specifications and system layouts necessary to understand the scope of mechanical work and piping configurations they will be responsible for maintaining and servicing.
The mechanical piping plan establishes the baseline system configuration that bidders must comprehend to develop accurate proposals for preventive maintenance scope and pricing. As a technical specification document rather than a pricing or contractual instrument, it does not contain explicit pricing terms, set-asides, award dates, or contract duration information. However, prospective vendors should reference this plan in conjunction with the scope of work document to ensure their maintenance proposals align with the facility's actual mechanical piping infrastructure, system complexity, and operational requirements. Vendors are directed to review all attachment materials and utilize the bidder walkthrough details provided in the primary scope document to develop comprehensive and competitive proposals.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TT
TT
T
T T
T TT
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
CO2
CO2
CO2
CO2
CO2
T
T
T
T
CO2
T
T T
T T
T T
T
T T
T
T
T
T
T
T
T
CO2
CO2
CO2
T
T
T
T
CO2
T T
T T
T T
T
T
T T
T T
T
T
T
T
T
CO2
CO2
SPM SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
T
BW CW
DW
EW
FW
GW
HW
JW
KW
LW
BE
CE
DE
EE
FE
GE
HE
JE
CS
GL
ES FS
GS
HS
JS
KS
LS
3E
2W
3N
4N
4E
1W
3W
2N
2E
1E
4W
1N
AW
AS
2W.2
AE
NW
MS
KE
BS
5N
4N.1
MATCH LINE
SEE 1/M2.07W1
MATCH LINE
SEE 1/M2.07W2
MATCH LINE
SEE 1/M2.07N2
MATCH LINE
SEE 1/M2.07N1
MATCH LINE
SEE 1/M2.07E2
MATCH LINE
SEE 1/M2.07E1
N1
W1
E1
W2
N2
E2
S1
0'
Project Name:
DCAMM Project Number:
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
F ile
P a th
Original Issue Date
Revisions
Drawing Title:
Drawing Number:
Project Consultant
HLY2102
Payette Associates Inc.
290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 www.payette.com
Project Number:
40158.00
10' 20' 40'
HLY 00
N/A
256 HLY 0010
E.O.H.H.S
BR+A CONSULTING ENGINEERS
10 Guest Street, 4th Floor
Boston, MA 02135
617.254.0016 brplusa.com
B
IM
/H o ly o k e S o ld ie rs
H o m e /3
H
S H
C
S B
R
A H
V A
C
R .r v t
LEVEL 7 - OVERALL
MECHANICAL PIPING PLAN
M2.07
01/10/2023
SOLDIERS' HOME
IN HOLYOKE
LONG-TERM
CARE PROJECT
110 Cherry Street Holyoke, MA 01040
Level 7 -...
BR+A HVAC Tag Equipment Type
WCCU-7-01 A4
WCCU-7-02 B4
WCCU-7-03 B4
WCCU-7-04 C4
WCCU-7-05 B4
WCCU-7-06 B4
1/16" = 1'-0"
LEVEL 7 - OVERALL MECHANICAL PIPING PLAN
Level 7 - Branch Selector Schedule
BR+A HVAC Tag Unit Type WCCU
BS-7-01 D6 WCCU-7-01
BS-7-02 D6 WCCU-7-02
BS-7-03 D6 WCCU-7-03
BS-7-04 C6 WCCU-7-04
BS-7-05 C6 WCCU-7-05
BS-7-06 D6 WCCU-7-06
Level 7 - VRF...
BR+A HVAC
Tag Equipment
Type Outside Air
(CFM)
Actual Supply
Airflow (CFM)
FCU-7-34 E1 100 350
FCU-7-35 F1 175 565
FCU-7-36 A1 200 200
FCU-7-37 C1 300 300
FCU-7-38 D1 50 205
FCU-7-39 A1 175 280
FCU-7-40 A1 100 125
FCU-7-41 I1 250 1050
FCU-7-42 A1 100 150
FCU-7-43 A1 50 150
FCU-7-44 A1 200 225
FCU-7-45 A1 50 125
FCU-7-46 A1 100 200
FCU-7-47 G1 175 665
FCU-7-48 H1 375 800
FCU-7-49 H1 150 775
FCU-7-50 I1 175 850
FCU-7-51 A1 100 175
FCU-7-52 A1 205 205
FCU-7-53 C2 0 280
FCU-7-54 C2 0 280
FCU-7-55 D1 175 325
FCU-7-56 A1 110 200
FCU-7-57 A1 110 200
FCU-7-58 A1 110 200
FCU-7-59 K1 300 1200
FCU-7-60 A1 110 200
FCU-7-61 A1 110 200
FCU-7-62 A1 110 200
FCU-7-63 A1 110 200
FCU-7-64 A1 110 200
FCU-7-65 A1 110 200
FCU-7-66 A1 110 200
FCU-7-67 A1 110 200
FCU-7-68 E1 110 425
Level 7 - VRF...
BR+A HVAC
Tag Equipment
Type Outside Air
(CFM)
Actual Supply
Airflow (CFM)
FCU-7-01 I1 200 925
FCU-7-02 E1 110 350
FCU-7-03 A1 110 200
FCU-7-04 A1 110 200
FCU-7-05 A1 110 200
FCU-7-06 A1 110 200
FCU-7-07 A1 110 200
FCU-7-08 A1 110 200
FCU-7-09 A1 110 200
FCU-7-09B D2 0 500
FCU-7-10 A1 110 200
FCU-7-11 A1 110 200
FCU-7-12 A1 110 200
FCU-7-13 F1 175 550
FCU-7-14 A1 225 225
FCU-7-15 A1 25 100
FCU-7-16 A1 250 275
FCU-7-17 E1 200 500
FCU-7-18 K1 550 1275
FCU-7-19 K1 525 1275
FCU-7-20 G1 250 650
FCU-7-21 A1 125 250
FCU-7-22 A1 110 200
FCU-7-23 A1 110 200
FCU-7-24 A1 110 200
FCU-7-25 A1 110 200
FCU-7-26 K1 275 1150
FCU-7-27 E1 110 350
FCU-7-28 A1 110 200
FCU-7-29 A1 110 200
FCU-7-30 A1 110 200
FCU-7-31 A1 110 200
FCU-7-32 A1 110 200
FCU-7-33 A1 110 200
No. Description Date
1 Bulletin #008 09/26/2023
2 BULLETIN #039 04/19/2024
3 BULLETIN #088 12/23/2024
4 BULLETIN #141 09/26/2025
https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441038 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441115 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441083 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441072 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441027 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441124
File details come from the government source that posted it. Updated .