M2.02_ LEVEL 2 - OVERALL MECHANICAL PIPING PLAN Rev.3 markup.pdf
PDF 2 MB Posted
- Attached to
- HVAC Preventive Maintenance RFQ TRD001
- Solicitation number
- BD-27-1053-1053C-CSR-132434
- Issued by
- Hampden County, Massachusetts
About this file
This is a mechanical piping plan document for the Soldiers' Home in Holyoke Long-Term Care Project in Massachusetts, prepared by Payette Associates Inc. and BR+A Consulting Engineers. The drawing, dated January 10, 2023, presents the Level 2 Overall Mechanical Piping Plan with a scale of 1/16" = 1'-0" and references the facility located at 110 Cherry Street in Holyoke, MA 01040. The document includes comprehensive HVAC schedules detailing 70 fan coil units (FCU-2-01 through FCU-2-70), six branch selector units (BS-2-01 through BS-2-06), and six water-cooled condenser units (WCCU-2-01 through WCCU-2-06). Each fan coil unit is identified with its equipment type designation and corresponding outside air and actual supply airflow measurements in CFM. The plan incorporates match line references to six related detailed drawings (M2.02W1, M2.02W2, M2.02N1, M2.02N2, M2.02E1, and M2.02E2) and indicates the document has been revised three times, with three bulletins issued between September 2023 and September 2025.
The document serves as a technical specification drawing supporting the HVAC Preventive Maintenance RFQ (TRD001) issued by the Veterans Home in Holyoke, a Massachusetts state agency. This plan provides the baseline mechanical infrastructure documentation necessary for vendors to develop comprehensive preventive maintenance, inspection, and testing service proposals for the facility's HVAC systems. The detailed equipment schedules and piping layout facilitate accurate scope development and cost estimation for qualified vendors responding to the Massachusetts Operational Services Division TRD01 contract opportunity.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T T T
T T
T T
T T
T
T
T
T
T T
T T
T
T
T T
T
T
T
T
T
T
T
T
T T
T
T
T T
T
T
T T
T T
T
T
T
T
T
T
T
T
T
TT
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
CO2
CO2
CO2
CO2
CO2
CO2
CO2
CO2
CO2
CO2
CO2
CO2
CO2
CO2
CO2
SPM SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
SPM
T
CO2
CO2
CO2
BW CW
DW
EW
FW
GW
HW
JW
KW
LW
BE
CE
DE
EE
FE
GE
HE
JE
CS
GL
ES FS
GS
HS
JS
KS
LS
3E
2W
3N
4N
4E
1W
3W
2N
2E
1E
4W
1N
AW
AS
2W.2
AE
NW
MS
KE
BS
5N
4N.1
CORRIDOR
W201
MATCH LINE
SEE 1/M2.02W1
MATCH LINE
SEE 1/M2.02W2
MATCH LINE
SEE 1/M2.02N2
MATCH LINE
SEE 1/M2.02N1
MATCH LINE
SEE 1/M2.02E2
MATCH LINE
SEE 1/M2.02E1
N1
W1
E1
W2
N2
E2
S1
0'
Project Name:
DCAMM Project Number:
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
F ile
P a th
Original Issue Date
Revisions
Drawing Title:
Drawing Number:
Project Consultant
HLY2102
Payette Associates Inc.
290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 www.payette.com
Project Number:
40158.00
10' 20' 40'
HLY 00
N/A
256 HLY 0010
E.O.H.H.S
BR+A CONSULTING ENGINEERS
10 Guest Street, 4th Floor
Boston, MA 02135
617.254.0016 brplusa.com
B
IM
/H o ly o k e S o ld ie rs
H o m e /3
H
S H
C
S B
R
A H
V A
C
R .r v t
LEVEL 2 - OVERALL
MECHANICAL PIPING PLAN
M2.02
01/10/2023
SOLDIERS' HOME
IN HOLYOKE
LONG-TERM
CARE PROJECT
110 Cherry Street Holyoke, MA 01040
1/16" = 1'-0"
LEVEL 2 - OVERALL MECHANICAL PIPING PLAN
Level 2 - VRF Schedule
BR+A HVAC
Tag
Equipment Type
Outside Air
(CFM)
Actual Supply
Airflow (CFM)
FCU-2-35 F1 175 575
FCU-2-36 E1 275 425
FCU-2-38 C1 200 300
FCU-2-39 A1 100 100
FCU-2-40 A1 50 75
FCU-2-41 K1 275 1275
FCU-2-42 A1 100 150
FCU-2-43 A1 50 150
FCU-2-44 F1 550 575
FCU-2-45 A1 50 200
FCU-2-46 A1 175 175
FCU-2-47 A1 100 100
FCU-2-48 I1 725 1075
FCU-2-49 I1 175 850
FCU-2-50 I1 175 850
FCU-2-51 A1 250 250
FCU-2-52 A1 200 200
FCU-2-53 C2 0 280
FCU-2-54 C2 0 280
FCU-2-55 D1 175 325
FCU-2-56 A1 100 200
FCU-2-57 A1 100 200
FCU-2-58 A1 100 200
FCU-2-59 L1 275 1650
FCU-2-60 A1 100 200
FCU-2-61 A1 100 200
FCU-2-62 E1 125 400
FCU-2-63 A1 100 200
FCU-2-64 A1 100 200
FCU-2-65 A1 100 200
FCU-2-66 A1 100 200
FCU-2-67 A1 100 200
FCU-2-69 F1 150 550
FCU-2-70 E1 150 395
Level 2 - VRF Schedule
BR+A HVAC
Tag
Equipment Type
Outside Air
(CFM)
Actual Supply
Airflow (CFM)
FCU-2-01 I1 200 1025
FCU-2-02 A1 100 200
FCU-2-03 A1 100 200
FCU-2-04 A1 100 200
FCU-2-05 E1 125 400
FCU-2-06 A1 100 200
FCU-2-07 A1 100 200
FCU-2-08 A1 100 200
FCU-2-09 A1 100 200
FCU-2-09B D2 0 500
FCU-2-10 A1 100 200
FCU-2-11 A1 100 200
FCU-2-12 A1 100 200
FCU-2-13 E1 125 450
FCU-2-14 A1 215 215
FCU-2-15 A1 100 175
FCU-2-16 A1 230 230
FCU-2-17 E1 200 400
FCU-2-18 A1 100 250
FCU-2-19 K1 725 1200
FCU-2-20 G1 75 625
FCU-2-21 A1 100 175
FCU-2-22 A1 100 200
FCU-2-23 A1 100 200
FCU-2-24 A1 100 200
FCU-2-25 A1 100 200
FCU-2-26 K1 200 1350
FCU-2-28 A1 100 200
FCU-2-29 A1 100 200
FCU-2-30 A1 100 200
FCU-2-31 A1 100 200
FCU-2-32 E1 125 400
FCU-2-33 A1 100 200
FCU-2-34 A1 100 200
Level 2 - Branch Selector Schedule
BR+A HVAC Tag Unit Type WCCU
BS-2-01 D6 WCCU-2-01
BS-2-02 D6 WCCU-2-02
BS-2-03 D6 WCCU-2-03
BS-2-04 C6 WCCU-2-04
BS-2-05 D6 WCCU-2-05
BS-2-06 D6 WCCU-2-06
Level 2 - WCCU Schedule
BR+A HVAC Tag Equipment Type
WCCU-2-01 A4
WCCU-2-02 B4
WCCU-2-03 A4
WCCU-2-04 C4
WCCU-2-05 B4
WCCU-2-06 A4
No. Description Date
1 Bulletin #008 09/26/2023
2 BULLETIN #039 04/19/2024
3 BULLETIN #141 09/26/2025
https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441097 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441040 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441047 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441056 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441068 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/363441054