M2.00_ LEVEL 0 - OVERALL MECHANICAL PIPING PLAN Rev.5 markup.pdf
PDF 2 MB Posted
- Attached to
- HVAC Preventive Maintenance RFQ TRD001
- Solicitation number
- BD-27-1053-1053C-CSR-132434
- Issued by
- Hampden County, Massachusetts
About this file
This is a mechanical piping plan drawing for the Soldiers' Home in Holyoke Long-Term Care Project located at 110 Cherry Street in Holyoke, Massachusetts. The drawing, designated M2.00 and titled "Level 0 - Overall Mechanical Piping Plan," was originally issued on January 10, 2023, and represents Revision 5 with markup. Prepared by Payette Associates Inc. as the project architect and BR+A Consulting Engineers as the project consultant, the plan illustrates the HVAC systems layout for the facility's ground level. The drawing identifies multiple Water-source Condenser Unit (WCCU) systems, Variable Refrigerant Flow (VRF) fan coil units (FCU), and branch selector units distributed across the facility. The document has undergone six revisions documented through project bulletins issued between September 26, 2023, and December 23, 2025, indicating ongoing design refinement and coordination throughout the project timeline.
The mechanical piping plan provides detailed specifications for the HVAC infrastructure, including 49 VRF fan coil units with designated outside air and actual supply airflow measurements ranging from 50 CFM to 1,375 CFM, six WCCU systems, and six branch selector units distributed throughout Level 0. The equipment schedule tabulates each unit's location designation, equipment type, and performance specifications to support the facility's heating, ventilation, and air conditioning requirements. The drawing utilizes a scale of 1/16 inch equals 1 foot and includes match line references to four related detailed drawings (M2.00W1, M2.00W2, M2.00N1, M2.00N2, M2.00E2, and M2.00W3), facilitating coordination with other sections of the mechanical design. This technical documentation supports the long-term care facility's operational requirements and infrastructure planning.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T
CO2
CO2
CO2
CO2
CO2
T
T
T
T
T
M
M
M
M
M
O2
BW CW
DW
EW
FW
GW
HW
JW
KW
LW
BE
CE
DE
EE
FE
GE
HE
JE
CS
GL
ES FS
GS
HS
JS
KS
LS
3E
2W
3N
4N
4E
1W
3W
2N
2E
1E
4W
1N
AW
AS
2W.2
AE
NW
MS
KE
BS
5N
4N.1
MATCH LINE
SEE 1/M2.00W1
MATCH LINE
SEE 1/M2.00W2
MATCH LINE
SEE 1/M2.00N2
MATCH LINE
SEE 1/M2.00N1
MATCH LINE
SEE 1/M2.00E2
MATCH LINE
SEE 1/M2.00W3
N1
W1
E1
W2
N2
E2
S1
0'
Project Name:
DCAMM Project Number:
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
F ile
P a th
Original Issue Date
Revisions
Drawing Title:
Drawing Number:
Project Consultant
HLY2102
Payette Associates Inc.
290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 www.payette.com
Project Number:
40158.00
10' 20' 40'
HLY 00
N/A
256 HLY 0010
E.O.H.H.S
BR+A CONSULTING ENGINEERS
10 Guest Street, 4th Floor
Boston, MA 02135
617.254.0016 brplusa.com
B
IM
/H o ly o k e S o ld ie rs
H o m e /3
H
S H
C
S B
R
A H
V A
C
R .r v t
LEVEL 0 - OVERALL
MECHANICAL PIPING PLAN
M2.00
01/10/2023
SOLDIERS' HOME
IN HOLYOKE
LONG-TERM
CARE PROJECT
110 Cherry Street Holyoke, MA 01040
Level 0 - WCCU Schedule
BR+A HVAC Tag Type
WCCU-0-01 C4
WCCU-0-02 C4
WCCU-0-03 C4
WCCU-0-04A B4
WCCU-0-04B B4
WCCU-0-05 C4
WCCU-0-06A B4
WCCU-0-06B A4
Level 0 - VRF Schedule
BR+A HVAC
Tag
Equipment Type
Outside Air
(CFM)
Actual Supply
Airflow (CFM)
FCU-0-25 B1 200 200
FCU-0-26 G1 150 650
FCU-0-27 I1 450 850
FCU-0-28 C1 150 225
FCU-0-29 B1 100 100
FCU-0-30A J1 350 1300
FCU-0-30B B3 0 315
FCU-0-31A K1 1375 1375
FCU-0-31B E3 0 1215
FCU-0-31C E3 0 1215
FCU-0-31D E3 0 1215
FCU-0-32 I1 850 850
FCU-0-33 A1 100 200
FCU-0-34 F1 575 575
FCU-0-37 L1 400 1900
FCU-0-38 D1 175 325
FCU-0-39 F1 300 600
FCU-0-41 A1 250 250
FCU-0-43 K1 1225 1225
FCU-0-44 J1 1250 1250
FCU-0-45 F1 500 550
FCU-0-46A C3 0 775
FCU-0-46B C3 0 775
FCU-0-48A C3 0 775
FCU-0-48B C3 0 775
FCU-0-49 A1 100 150
Level 0 - VRF Schedule
BR+A HVAC
Tag
Equipment Type
Outside Air
(CFM)
Actual Supply
Airflow (CFM)
FCU-0-01A E3 0 1215
FCU-0-01B E3 0 1215
FCU-0-03 F1 525 525
FCU-0-04 A1 50 275
FCU-0-05 I1 0 900
FCU-0-06 I1 0 1125
FCU-0-07 C1 0 275
FCU-0-07B N1 0 1300
FCU-0-08A F1 100 350
FCU-0-08B B3 0 315
FCU-0-10A E1 225 375
FCU-0-10B B3 0 315
FCU-0-11 E1 150 375
FCU-0-12 F1 550 550
FCU-0-13 E1 125 350
FCU-0-14 A1 150 250
FCU-0-16 C1 75 300
FCU-0-17 A1 50 100
FCU-0-18 A1 100 150
FCU-0-19 A1 150 250
FCU-0-20 I1 350 950
FCU-0-21 D1 200 325
FCU-0-22 H1 700 700
FCU-0-23 I1 925 925
FCU-0-24 H1 750 750
Level 0 - Branch Selector Schedule
BR+A HVAC Tag Unit Type WCCU
BS-0-01 A6 WCCU-0-01
BS-0-02 D6 WCCU-0-02
BS-0-03 B6 WCCU-0-03
BS-0-04 A6 WCCU-0-04
BS-0-05 C6 WCCU-0-05
BS-0-06 B6 WCCU-0-06
1/16" = 1'-0"
LEVEL 0 - OVERALL MECHANICAL PIPING PLAN
No. Description Date
1 Bulletin #008 09/26/2023
2 BULLETIN #028R1 03/08/2024
3 BULLETIN #039 04/19/2024
4 BULLETIN #141 09/26/2025
5 BULLETIN #155 11/18/2025
6 BULLETIN #162 12/23/2025
3 3
3 3
2 2
2 2 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/371234536 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/371234542 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/371234533 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/375186450 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/375186451 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/371234534
File details come from the government source that posted it. Updated .