M2.00_ LEVEL 0 - OVERALL MECHANICAL PIPING PLAN Rev.5 markup.pdf

PDF 2 MB Posted

Attached to
HVAC Preventive Maintenance RFQ TRD001
Solicitation number
BD-27-1053-1053C-CSR-132434
Issued by
Hampden County, Massachusetts

About this file

This is a mechanical piping plan drawing for the Soldiers' Home in Holyoke Long-Term Care Project located at 110 Cherry Street in Holyoke, Massachusetts. The drawing, designated M2.00 and titled "Level 0 - Overall Mechanical Piping Plan," was originally issued on January 10, 2023, and represents Revision 5 with markup. Prepared by Payette Associates Inc. as the project architect and BR+A Consulting Engineers as the project consultant, the plan illustrates the HVAC systems layout for the facility's ground level. The drawing identifies multiple Water-source Condenser Unit (WCCU) systems, Variable Refrigerant Flow (VRF) fan coil units (FCU), and branch selector units distributed across the facility. The document has undergone six revisions documented through project bulletins issued between September 26, 2023, and December 23, 2025, indicating ongoing design refinement and coordination throughout the project timeline.

The mechanical piping plan provides detailed specifications for the HVAC infrastructure, including 49 VRF fan coil units with designated outside air and actual supply airflow measurements ranging from 50 CFM to 1,375 CFM, six WCCU systems, and six branch selector units distributed throughout Level 0. The equipment schedule tabulates each unit's location designation, equipment type, and performance specifications to support the facility's heating, ventilation, and air conditioning requirements. The drawing utilizes a scale of 1/16 inch equals 1 foot and includes match line references to four related detailed drawings (M2.00W1, M2.00W2, M2.00N1, M2.00N2, M2.00E2, and M2.00W3), facilitating coordination with other sections of the mechanical design. This technical documentation supports the long-term care facility's operational requirements and infrastructure planning.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

CO2

CO2

CO2

CO2

CO2

T

T

T

T

T

M

M

M

M

M

O2

BW CW

DW

EW

FW

GW

HW

JW

KW

LW

BE

CE

DE

EE

FE

GE

HE

JE

CS

GL

ES FS

GS

HS

JS

KS

LS

3E

2W

3N

4N

4E

1W

3W

2N

2E

1E

4W

1N

AW

AS

2W.2

AE

NW

MS

KE

BS

5N

4N.1

MATCH LINE

SEE 1/M2.00W1

MATCH LINE

SEE 1/M2.00W2

MATCH LINE

SEE 1/M2.00N2

MATCH LINE

SEE 1/M2.00N1

MATCH LINE

SEE 1/M2.00E2

MATCH LINE

SEE 1/M2.00W3

N1

W1

E1

W2

N2

E2

S1

0'

Project Name:

DCAMM Project Number:

Project Location

Project Architect

Site Number:

CAMIS Number:

Building Number:

Secretariat:

F ile

P a th

Original Issue Date

Revisions

Drawing Title:

Drawing Number:

Project Consultant

HLY2102

Payette Associates Inc.

290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 www.payette.com

Project Number:

40158.00

10' 20' 40'

HLY 00

N/A

256 HLY 0010

E.O.H.H.S

BR+A CONSULTING ENGINEERS

10 Guest Street, 4th Floor

Boston, MA 02135

617.254.0016 brplusa.com

B

IM

/H o ly o k e S o ld ie rs

H o m e /3

H

S H

C

S B

R

A H

V A

C

R .r v t

LEVEL 0 - OVERALL

MECHANICAL PIPING PLAN

M2.00

01/10/2023

SOLDIERS' HOME

IN HOLYOKE

LONG-TERM

CARE PROJECT

110 Cherry Street Holyoke, MA 01040

Level 0 - WCCU Schedule

BR+A HVAC Tag Type

WCCU-0-01 C4

WCCU-0-02 C4

WCCU-0-03 C4

WCCU-0-04A B4

WCCU-0-04B B4

WCCU-0-05 C4

WCCU-0-06A B4

WCCU-0-06B A4

Level 0 - VRF Schedule

BR+A HVAC

Tag

Equipment Type

Outside Air

(CFM)

Actual Supply

Airflow (CFM)

FCU-0-25 B1 200 200

FCU-0-26 G1 150 650

FCU-0-27 I1 450 850

FCU-0-28 C1 150 225

FCU-0-29 B1 100 100

FCU-0-30A J1 350 1300

FCU-0-30B B3 0 315

FCU-0-31A K1 1375 1375

FCU-0-31B E3 0 1215

FCU-0-31C E3 0 1215

FCU-0-31D E3 0 1215

FCU-0-32 I1 850 850

FCU-0-33 A1 100 200

FCU-0-34 F1 575 575

FCU-0-37 L1 400 1900

FCU-0-38 D1 175 325

FCU-0-39 F1 300 600

FCU-0-41 A1 250 250

FCU-0-43 K1 1225 1225

FCU-0-44 J1 1250 1250

FCU-0-45 F1 500 550

FCU-0-46A C3 0 775

FCU-0-46B C3 0 775

FCU-0-48A C3 0 775

FCU-0-48B C3 0 775

FCU-0-49 A1 100 150

Level 0 - VRF Schedule

BR+A HVAC

Tag

Equipment Type

Outside Air

(CFM)

Actual Supply

Airflow (CFM)

FCU-0-01A E3 0 1215

FCU-0-01B E3 0 1215

FCU-0-03 F1 525 525

FCU-0-04 A1 50 275

FCU-0-05 I1 0 900

FCU-0-06 I1 0 1125

FCU-0-07 C1 0 275

FCU-0-07B N1 0 1300

FCU-0-08A F1 100 350

FCU-0-08B B3 0 315

FCU-0-10A E1 225 375

FCU-0-10B B3 0 315

FCU-0-11 E1 150 375

FCU-0-12 F1 550 550

FCU-0-13 E1 125 350

FCU-0-14 A1 150 250

FCU-0-16 C1 75 300

FCU-0-17 A1 50 100

FCU-0-18 A1 100 150

FCU-0-19 A1 150 250

FCU-0-20 I1 350 950

FCU-0-21 D1 200 325

FCU-0-22 H1 700 700

FCU-0-23 I1 925 925

FCU-0-24 H1 750 750

Level 0 - Branch Selector Schedule

BR+A HVAC Tag Unit Type WCCU

BS-0-01 A6 WCCU-0-01

BS-0-02 D6 WCCU-0-02

BS-0-03 B6 WCCU-0-03

BS-0-04 A6 WCCU-0-04

BS-0-05 C6 WCCU-0-05

BS-0-06 B6 WCCU-0-06

1/16" = 1'-0"

LEVEL 0 - OVERALL MECHANICAL PIPING PLAN

No. Description Date

1 Bulletin #008 09/26/2023

2 BULLETIN #028R1 03/08/2024

3 BULLETIN #039 04/19/2024

4 BULLETIN #141 09/26/2025

5 BULLETIN #155 11/18/2025

6 BULLETIN #162 12/23/2025

3 3

3 3

2 2

2 2 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/371234536 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/371234542 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/371234533 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/375186450 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/375186451 https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/371234534

File details come from the government source that posted it. Updated .