M12-16472 Addendum No 1.pdf

PDF 511 KB Posted

Attached to
751/16198. RAA Fort Wilkins SP Lighthouse Masonry Repairs
Solicitation number
RFQ 171 190000000534 2
Issued by
Jackson County, Michigan

About this file

This is Addendum No. 1 to a bidding document issued by U.P. Engineers & Architects, Inc. for the Michigan Department of Natural Resources regarding masonry repairs at Fort Wilkins Historic State Park. The project involves lighthouse and residence masonry repairs at the park located in Houghton, Michigan. The addendum was issued on July 16, 2019, and references a mandatory pre-bid meeting held on July 10, 2019, with an attached sign-in sheet documenting attendees. Bidders were required to acknowledge receipt of this addendum on the bid form as part of the formal bidding process.

The addendum contains two specification revisions to the original plans and specifications. The first revision clarifies that the DNR will clear brush from the north side of the lighthouse in an area identified by the contractor. The second revision modifies the water sourcing requirement, allowing the contractor to provide their own water or utilize lake water as a source provided the contractor can demonstrate to the satisfaction of the owner and architect that the water used complies with specification requirements. These clarifications and modifications became binding conditions of the contract bid documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100 Portage Street Houghton, MI 49931

906-482-4810 • 800-562-7684 • Fax: 906-482-9799

Offices also in:

Ishpeming

Iron Mountain Sault Ste Marie

Marinette

U.P. Engineers & Architects, Inc.

www.UPEA.com

[M12-16472]

ADDENDUM No. 1

Project: MDNR – Parks and Recreation – Fort Wilkins Historic State Park Agency: Michigan Department of Natural Resources Project Name: Lighthouse and Residence Masonry Repairs File Number: 751/16198.RAA Index Number: 51023

This ADDENDUM NO. 1, issued on July 16, 2019, is to clarify, modify and/or change the original plans and specifications issued by U.P. Engineers & Architects, Inc., and is hereby made a part of the bidding documents.

Bidders shall acknowledge receipt of this ADDENDUM No. 1 on the appropriate place on the Bid Form.

The specification revisions may be presented with new words in bold, and existing words to be omitted by striking out.

General:

Attached is the Sign-In Sheet from the Mandatory Pre-bid Meeting on 7/10/19.

Specifications:

1. Add: Appendix II, Special Working Conditions, § 2.2.c. The DNR will clear brush from the north side of the lighthouse in area identified by contractor.

2. Revise: Appendix II, Special Working Conditions, § 3.6 The contractor shall provide their own water may utilize lake water as a source if the contractor can demonstrate to the satisfaction of the owner and Architect that the water used in the work is in compliance with the requirements in specifications.

Attachments:

1. Mandatory Pre-bid Meeting Sign-In Sheet

END OF ADDENDUM NO. 1