M12-16472 Addendum No 1.pdf

PDF 511 KB Posted

Attached to
751/16198. RAA Fort Wilkins SP Lighthouse Masonry Repairs
Solicitation number
RFQ-171-190000000534-2
Issued by
Isabella County, Michigan

About this file

This is Addendum No. 1 issued by U.P. Engineers & Architects, Inc. for the Michigan Department of Natural Resources (MDNR) Parks and Recreation project at Fort Wilkins Historic State Park for Lighthouse and Residence Masonry Repairs (File Number 751/16198.RAA, Index Number 51023). The addendum was issued on July 16, 2019 following a mandatory pre-bid meeting held on July 10, 2019. The document includes two key specification revisions: 1) The DNR will clear brush from the north side of the lighthouse in the area identified by the contractor, and 2) Contractors may utilize lake water as a water source if they can demonstrate compliance with specifications, modifying the original requirement for contractors to provide their own water.

The document includes a sign-in sheet from the mandatory pre-bid meeting and requires bidders to acknowledge receipt of the addendum on their bid form. No specific pricing terms, funding details, or contract duration information is provided in this addendum. The second page shows a partially visible sign-in sheet from the pre-bid meeting with attendee information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100 Portage Street Houghton, MI 49931

906-482-4810 • 800-562-7684 • Fax: 906-482-9799

Offices also in:

Ishpeming

Iron Mountain Sault Ste Marie

Marinette

U.P. Engineers & Architects, Inc.

www.UPEA.com

[M12-16472]

ADDENDUM No. 1

Project: MDNR – Parks and Recreation – Fort Wilkins Historic State Park Agency: Michigan Department of Natural Resources Project Name: Lighthouse and Residence Masonry Repairs File Number: 751/16198.RAA Index Number: 51023

This ADDENDUM NO. 1, issued on July 16, 2019, is to clarify, modify and/or change the original plans and specifications issued by U.P. Engineers & Architects, Inc., and is hereby made a part of the bidding documents.

Bidders shall acknowledge receipt of this ADDENDUM No. 1 on the appropriate place on the Bid Form.

The specification revisions may be presented with new words in bold, and existing words to be omitted by striking out.

General:

Attached is the Sign-In Sheet from the Mandatory Pre-bid Meeting on 7/10/19.

Specifications:

1. Add: Appendix II, Special Working Conditions, § 2.2.c. The DNR will clear brush from the north side of the lighthouse in area identified by contractor.

2. Revise: Appendix II, Special Working Conditions, § 3.6 The contractor shall provide their own water may utilize lake water as a source if the contractor can demonstrate to the satisfaction of the owner and Architect that the water used in the work is in compliance with the requirements in specifications.

Attachments:

1. Mandatory Pre-bid Meeting Sign-In Sheet

END OF ADDENDUM NO. 1