This is a Statement of Work (SOW) for scissor lift repair services at MCB Camp Pendleton, California. The objective is to repair a single Autoquip-manufactured scissor lift (72" travel carousel model) that accesses horizontal carousels used to store Marine Corps equipment repair parts. The lift requires repair or replacement due to damage to the leg assembly and hydraulic components.
The contractor must conduct a site visit to confirm required repairs, furnish and install replacement materials including leg assembly, base frame, cylinders, and hosing, and test the lift to ensure proper operation. All work shall be performed at building 2251 on MCB Camp Pendleton. The contractor is responsible for removing damaged parts and placing them outside the building, while the government will provide building access, power access, and removal of damaged parts from the job site. The contractor must provide a repair start date to the Technical Point of Contact (TPOC) upon receipt of required repair parts. Quality will be measured based on contractors quoted materials at time of solicitation. The TPOC, identified as Steve Elggren (760-725-3172, steven.elggren@usmc.mil), will inspect the completed work but has no authority to authorize contract changes; only the Contracting Officer from Regional Contracting Office MCI-WEST can authorize modifications. The scissor lift specifications include a 6' x 14' platform, 2,000 lb. lifting capacity, 20 FPM raising/lowering speed, and operates with electrohydraulic power and NEMA-12 controls.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
SCISSOR LIFT REPAIR
Background
MCB Camp Pendleton utilizes horizontal carousels to store thousands of Marine Corps equipment repair parts. The carousels are accessed multiple times daily utilizing scissor lifts manufactured by Autoquip - see the attached. The equipment maintenance contractor has indicated that one lift either needs to be repaired or replaced as soon as possible.
Objectives
To repair a scissor lift.
Scope
To provide and install the required parts needed to return the lift to a fully operational status.
Tasks
Task Number
Work Milestones
Projected Completion Date
2.1 Site Visit TBD
2.2 Furnish materials TBD
2.3 Installation TBD
2.4 The TPOC will inspect the job when completed TBD
1. Upon award, the contractor is to provide a repair start date to the TPOC once the contractor has received the required repair parts.
2. Place Of Performance:
The job site location is aboard MCB Camp Pendleton, Ca in building 2251.
2.1 - Site Visit:
Contractors are to attend a site visit to confirm required repairs
2.2 - Furnish Materials:
The contractor will provide the materials required as indicated below:
Leg assembly and hydraulics (base frame, cylinders, hosing)
2.3 - Installation:
The contractor is to repair the scissor lift.
Contractor Responsibilities:
DISTRIBUTION: DoW COMMUNITY ONLY steven.elggren Cross-Out
Generic SOW Temp'ate
Remove damaged parts and place them outside of the building 2251
Install the new parts
Test the lift to ensure proper operation
Government Responsibilities:
Provide access to the building
Provide access to available power
Remove the damaged parts from the job site
2.4 - Completed Job Inspection:
The contract does not contain a Quality Assurance Survellance Plan (QASP); however, the TPOC will inspect the job for quality upon completion. Quality will be measured in accordance with the following:
Description Of Work
Contractors quoted materials at the time of the solicitation
3. Government Tecliiiical Point Of Contact:
The Contracting Officer will designate a Government Technical Point Of Contact ( TPOC) during the term of the contract. The TPOC will provide assistance in identifying and resolving problems and provide technical clarification and assistance in support of the contract. The TPOC
DOES NOT have the authority to make changes and/or give direction under this contract. The only person that can authorize the above is the Contracting Office from the Regional Contracting
Office MCI-WEST, Camp Pendleton, Ca.
Steve Elggren 760 725-3172 steven.e1ggren@usmc.mil
4. Base Access
DISTRtBUTION: DoW COMMUNITY ONLY steven.elggren Cross-Out rn b --.-.
I - - N
I -- I 9
I.
MATERIALS: 1/4' Thick Smooth Flat Steel with Fine Oxide Grit Finish
LiFTING CAPACIEY: 2,000 lbs, 1,000 lb. Side load, and 500 lb. End load
TRAVEL: 72 -
LOWERED HEIGHT: B, Approximately 4" of toe clearance when lift in lowered posion rs
F' ' S j 1IJ
IISXA1;4I1LIi
' ''-' '"I- 'I"
S - I- .i. - - I S - 5-. 5 I - - --
III
I
S.,-, - - - - I. - - S.. :. -- IS I.
" II S - S - - - - S -e . - - S - -
; 5 " - S S - S " 51.15
II I I
5" I S - - I - S - "SIS - - -
"'.I
.! LLt S 'S"S ';A:j!; ;\ "S "_O
E STOP
CHAIN ACROSS
ACCESS OPENING
FRONT
V8EW
Ii.1I111LI ANYWHERE REAR VIEW (FROM CAROUSEL SftDE)
ON CENTER
RAILING
14-0"
T
REAR VEW 4"
- rLt"L UP/DOWH I 0 SWTCH & ELECTRICAL 77.5"
OUTLETS ANYWHERE ON HAND RAIL
RGHT VIEW
3cIearPf- (
POWER SOURCE
0> ii(iIYkI1
L
ELECTRICAL OUTLET
MOU NTED
ON KICK PLATE.
ADDITIONAL POWER
STRIP TO BE ADDED.
FRONT VIEW
6-0" H 6-0" H 6-0" H in TET 48"
48'
I. .I IIIi*TiI q4" 88.5" 31.5" 13"
File details come from the government source that posted it. Updated .