This amendment to a solicitation provides updated specifications and extends the response deadline for a loading ramp procurement. The United States Marine Corps seeks a portable, single-unit heavy duty loading ramp with a minimum weight capacity of 100,000 pounds to transport between railcars and vehicles. Updates include requiring fork entries accessible from both sides compatible with 30,000-pound forklifts, a maximum ramp weight of 15,000 pounds, cutouts to protect rail tracks and couplers, and a response deadline extension to August 30, 2023. Awards will be made to the lowest-priced, technically acceptable offerors meeting requirements for ramp dimensions, weight capacity, materials, and safety markings.

View the file

Other files for this federal contract opportunity

Other files attached to Loading Ramp, newest first.
File Type Posted
Sample Photos- M0068123Q00600002.docx DOCX document
E1- Amendment 0001.pdf PDF
D1- Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M330003315091

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this ammendmen is to provide answ ers to questions submitted by interested vendors, to provide updated minimum requirements, and to extend solicitation closing date to 30 Aug 2023. See summary of amendment for updated specifications, see attached external document for sample photos.

1. Q: What is the purpose of the cutout at the approach of the ramp?

A: To protect the rail tracks from contact w ith the ramp.

2. Q: What is the purpose of the cutout at the top of the ramp?

A: To protect the pretruding railcar coupler from contact w ith the ramp.

3. Q: Does the ramp need to be 46 feet high, is this an error?

A: The correct height is 46 inches, 46 feet w as a typo.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Aug-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M0068123Q0060

X 9B. DATED (SEE ITEM 11)

03-Aug-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Aug-2023

CODE

REGIONAL CONTRACTING OFFICE-MCIWEST

BLDG 22180 REGIONAL CONTRACTS

CAMP PENDLETON CA 92055-5027

M00681 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

M0068123Q0060

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 18-Aug-2023 12:00 PM to 30-Aug-2023 12:00 PM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

• Heavy duty loading ramp• Portable single unit with forklift entries.• Weight capacity: Minimum 100,000 pounds.• Overall weight: Maximum 9,400 pounds.• Overall Height: 45’ feet, 0” inches with mechanism for precision height adjustment.• Overall length: Minimum 20’ feet, 0” inches and Maximum 24’ feet, 0” inches.• Overall width: 11’ feet, 0” inches • Traction: Steel serrated grating • Approach: Beveled edge transition from ramp to ground with center cutout of 40” inches wide and 18” inches deep.• Landing: Top landing with level-off platform and center cutout of 40” inches wide and 18” inches deep.• Paint: Corrosion resistant finish and brightly colored for safety.

To:

• Portable single unit heavy duty loading ramp• Fork entries accesible from both sides and compatable with standard 30k forklift.• Lift points: Minimum four (4) lifting points for overhead transport of the ramp.• Weight capacity: Minimum 100,000 pounds.• Overall weight: Maximum 15,000 pounds to allow transport by vehicles as light as 15k forklift. • Overall Height: 45” inches with mechanism for precision height adjustment to match railcar height.• Overall length: Minimum 20’ feet, 0” inches and Maximum 24’ feet, 0” inches.• Overall width: 11’ feet, 0” inches • Traction: Steel grating • Landing: Landing at top portion of ramp for ease of transition to and from railcar. • Approach: Maximum transition height from ground to the approaching end of the ramp to be 5” inches for ease of entry and exit.• Center cutout at approach: 64” inches wide and 21” inches long to ensure rail tracks are not damaged by the ramp. • Center cutout at top landing: 40” inches wide and 18” inches long to ensure space for the pretruding railcar coupler at point where ramp meets railcar. • Paint: Corrosion resistant finish and brightly colored for safety.

The following have been added by full text:

SUMMARY OF CHANGES

Summary of Changes

1. Solicitation closing date has been extended to 30 August 2023.

2. The following questions by interested vendors have been answered:

Q: What is the purpose of the cutout at the approach of the ramp?

A: To protect the rail tracks from contact with the ramp.

Q: What is the purpose of the cutout at the top of the ramp?

A: To protect the pretruding railcar coupler from contact with the ramp.

Q: Does the ramp need to be 46 feet high, is this an error?

A: The correct height is 46 inches, 46 feet was a typo.

3. Sample photos are now included in external attachment document.

4. The minimum requirements have been updated as follows:

Portable single unit heavy duty loading ramp Fork entries accesible from both sides and compatable with standard 30k forklift.

Lift points: Minimum four (4) lifting points for overhead transport of the ramp.

Weight capacity: Minimum 100,000 pounds.

Overall weight: Maximum 15,000 pounds to allow transport by vehicles as light as 15k forklift.

Overall Height: 45” inches with mechanism for precision height adjustment to match railcar height.

Overall length: Minimum 20’ feet, 0” inches and Maximum 24’ feet, 0” inches.

Overall width: 11’ feet, 0” inches Traction: Steel grating Landing: Landing at top portion of ramp for ease of transition to and from railcar.

Approach: Maximum transition height from ground to the approaching end of the ramp to be 5” inches for ease of entry and exit.

Center cutout at approach: 64” inches wide and 21” inches long to ensure rail tracks are not damaged by the ramp.

Center cutout at top landing: 40” inches wide and 18” inches long to ensure space for the pretruding railcar coupler at point where ramp meets railcar.

The following have been modified:

52.212-2 ADDENDUM

Regional Contracting Office, Camp Pendleton, CA, is issuing Request For Quotation (RFQ) to heavy duty loading ramp. This procurement is conducted in accordance with FAR Part 12 (Acquisition of Commercial Items) utilizing FAR Part 13 (Simplified Acquisition Procedures).

Incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2023-04, effective 06/02/23 and DFARS Change Notice (DCN) 06/09/23, effective 06/09/23.

BASIS FOR AWARD. Award will be the capability of the quoter to meet or exceed the technically specifications and best pricing determined to be fair and reasonable. The resulting award will be a Firm-Fixed Priced purchase order, all or none, to provide heavy duty loading ramp.

EVALUATION. The Government intends to make a single Firm Fixed Price award to satisfy this requirement.

Award will be made on the initial evaluation of quotes received in response to this RFQ. Therefore, quoters are cautioned to ensure that initial quotes contain your best terms from a technical and price standpoint. The following factors will be used to evaluate quotes:

1. TECHNICAL: Minimum specifications:

Portable single unit heavy duty loading ramp Fork entries accesible from both sides and compatable with standard 30k forklift.

Lift points: Minimum four (4) lifting points for overhead transport of the ramp.

Weight capacity: Minimum 100,000 pounds.

Overall weight: Maximum 15,000 pounds to allow transport by vehicles as light as 15k forklift.

Overall Height: 45” inches with mechanism for precision height adjustment to match railcar height.

Overall length: Minimum 20’ feet, 0” inches and Maximum 24’ feet, 0” inches.

Overall width: 11’ feet, 0” inches Traction: Steel grating Landing: Landing at top portion of ramp for ease of transition to and from railcar.

Approach: Maximum transition height from ground to the approaching end of the ramp to be 5” inches for ease of entry and exit.

Center cutout at approach: 64” inches wide and 21” inches long to ensure rail tracks are not damaged by the ramp.

Center cutout at top landing: 40” inches wide and 18” inches long to ensure space for the pretruding railcar coupler at point where ramp meets railcar.

(Sufficient information shall be provided to support capability to meet the required brand name products and services requested, to include but not limited to, product literature, product number, authorized service provider letter, etc…)

Rating will be in accordance with: Rating Description Acceptable Quotation meets the requirements of the solicitation.

Unacceptable Quotation does not meet the requirement of the solicitation

2. PRICE: All quotes must be the Contractor’s Best Pricing. Price analysis shall be used to verify that the overall price offered is fair and reasonable. The Offeror shall input the unit price and total in all the line items present in the SF1449. The total evaluated price is calculated using the prices proposed for all line items.

3. EVALUATION PROCESS: The evaluation will proceed as follows:

Step 1 – The Contracting Officer will review offers to determine if each offeror has submitted a responsive quote. To be responsive, quoters must submit all the documentation identified above, by the RFQ close date/time shown in block 8 of the SF1449. A quote may be eliminated from the competition without further consideration if it does not meet the responsiveness requirements.

Step 2 – Quotes that have been determined responsive will then be evaluated and receive a rating of

Acceptable or Unacceptable based on the technical acceptability criteria above. Offerors must receive an “Acceptable” rating on each technical element to be determined technically “Acceptable”.

Step 3 – Remaining technically acceptable quotes will be ranked in in order from lowest to highest based on submitted CLIN prices. All CLIN prices will be evaluated and determined to be fair and reasonable using one or more of the techniques set forth in FAR 15.404-1(b)(2). The assessment of price will consider the overall quoted price. Quotes containing only partial pricing will not be evaluated.

Step 4 – The three lowest price, technically acceptable quotes will be reviewed for delivery acceptability in accordance with terms specified above. Those Offerors that do quote delivery or period of performance as requested will not be evaluated.

Step 5 – If the three lowest price, technically acceptable quotes are judged to have an

“acceptable” delivery, those quotes represent the best value for the government and the evaluation process stops at this point. Award shall be made to the lowest quoter without further consideration of any other quotes. If the Government cannot assess acceptable delivery among the initial three lowest price, technically acceptable quotes, it may (at the Contracting Officer’s discretion) conduct an assessment on the next higher priced quotes until one or more selections can be made.

The Government reserves the right to award no contract, depending on the quality of the quotes submitted and availability of funds for the requirement. The Government intends to evaluate quotes and award a single contract without requesting or accepting revised quotes. Therefore, the Offerors will be advised that their initial quote should contain the most favorable terms and reflect it’s best possible performance potential. The Government does reserve the right to clarify aspects of the quotes and hold discussions.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .