Solicitation Q-A_16FEB21.pdf
PDF 429 KB Posted
- Attached to
- SHOOTING RANGE TRAINING DEVICES - STEEL FOLDABLE BARRICADE SYSTEM Federal contract opportunity
- Solicitation number
- M0068121Q0024
- Issued by
- United States Marine Corps
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| M0068121Q0021-0001 Amendment.pdf | ||
| Rev 1 Barricade Dimension Requirements.pdf | ||
| Solicitation M0068121Q0024.pdf | ||
| Synopsis.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Solicitation: M0068121Q0024 Title of Requirement: SHOOTING RANGE TRAINING DEVICES - STEEL FOLDABLE BARRICADE
SYSTEM
Q&A #1-7 as of 12 February 2021 Q&A #1-7 do not require a Solicitation amendment. These are answers are for clarification purposes.
Questions Answers 1 The current sketch didn’t specify, a steel product to be use. Are we able to use square tubing?
YES, Square Tubing
2 Can you tell me the composition of the 11 ga. steel? YES, On page 3 of 33 of the Solicitation M0068121Q0024, CLIN 0001 states “11 gauge US Standard Steel - Heavy duty construction.”
3 Is it angle or tube? YES, Square Tubing 4 Also what size is the tube? 1.5" x 1.5" or similar? Square Tubing is as follows: Outside is 1x2 .095, Center 1x1 0.95, Base 2x4 .120 5 I would like to confirm when quotes are due:
SAM says 2/16 at 1000 EST Block 8, page 1, per in the SF 1449 says 2/19 at 1000
PDT
Quotes are due 22 February 2021 at 3:00 pm PDT per the SF 1449. Amended SF 1149 will be posted to beta.Sam, Extended Offer Due Date
An extension will be provided to the date specified.
6 Block 17a. asks for offeror code and facility code. What code would I need to use in this block?
This is your contractor/vendor’s Cage Code
7 The Barricade Dimension Requirements Sheet is not in line with SF 1449 CLIN 0001 Description Text. Which is correct?
The dimension requirements on the SF 1449 CLIN 0001 description Text is correct. Attached is the corrected Rev 1 Barricade Dimension Requirements Sheet.
File details come from the government source that posted it. Updated .