M0068120Q0048 14-A ug-2020

b. TELEPHONE NUMBER

760-725-1938

8. OFF ER DUE DAT E/LOCAL T IME

10:00 AM 24 A ug 2020

5. SOLICIT ATION NUM BER 6. SOLICITAT ION ISSUE DAT E

A UTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STA NDARD FORM 1449 (REV . 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR P RINT)

(SIGNAT URE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Us e Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTA NCE IS DIFFERENT A ND PUT

BELOW IS CHECKED

TELEPHONE NO.

M006819. ISSUED BY

18b. SUBMIT INVOICES TO A DDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORM AT ION CALL:

a. NAME

LUONG T. PHAN

2. CONTRACT NO. 3. AWARD/EFF ECTIVE DATE 4. ORDER NUM BER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNA TURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISIT ION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

M 3300020SUFE012

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. Y OUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

REGIONAL CONTRACTING OFFICE-MCIWEST

P O BOX 555027

CAMP PENDLETON CA 92055-5027

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE M 33000 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

M 33000

M ARK BONSAVAGE

BLDG 22165, MCB

CAMP PENDLETON CA 92055

T EL: 760-725-9721 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$8,000,000

NAICS:

811310

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUA NTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOM EN-OWNED SM ALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SM ALL BUSINESS P ROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF48

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAY MENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC' D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDA RD FORM 1449 (REV. 2/2012) BA CK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCA L REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUA NTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

M0068120Q0048

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 174 Each Generator Maintenance Inspection

FFP

Inspection of the backup generators in accordance with the SOW.

FOB: Destination

MILSTRIP: M3300020SUFE012

PURCHASE REQUEST NUMBER: M3300020SUFE012

PSC CD: J028

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 174 Each Generator Maintenance - Full Service

FFP

Full service maintenance, to include second inspection, in accordance with the

SOW.

FOB: Destination

MILSTRIP: M3300020SUFE012

PURCHASE REQUEST NUMBER: M3300020SUFE012

PSC CD: J028

NET AMT

STATEMENT OF WORK

BACKUP GENERATOR MAINTENANCE FOR EMERGENCY GENERATORS AT MARINE CORPS

INSTALLATION WEST - MARINE CORPS BASE, CAMP PENDLETON

SECTION 1 – GENERAL:

1.1 LOCATION

The project is located at Marine Corps Installations West-Marine Corps Base, Camp Pendleton (MCIWEST-MCB

CAMPEN).

1.2 OBJECTIVE

The purpose of this contract is to perform backup generator preventive maintenance (PM) and inspections for 174 emergency standby generators.

1.3 BACKGROUND

The San Diego Air Pollution Control District (SDAPCD) performed an annual compliance inspection 10 Jan 2017 to 23 Mar 2017. A total of 203 permits were inspected of which 174 were backup generators. On 23 Mar 2017 the SDAPCD issued forty eight (48) Notices of violation (NOV). Forty two (42) of the NOVs involved one hundred eleven (111) backup generators. The NOVs cited Reference (1), SDAPCD Rule 69.4.1, noting that maintenance logs did not indicate completion of required annual maintenance.

The requirements to perform backup generator inspection and maintenance are listed in SDAPCD Rule 69.4.1 Section f(1) and f(2) where inspections are called for at least every six month and generator maintenance is required at least annually.

SECTION 2 – WORK ELEMENTS:

2.1 Work Element 1: Kickoff Meeting

The Contractor shall conduct a project “kickoff” meeting to develop a plan of action and milestones (POA&M) within ten (10) calendar days of the contract award. The Contractor shall provide the project manager with a detailed agenda two (2) calendar days prior to the kickoff meeting and shall revise this agenda as required by the project manager. The agenda of this meeting will include discussion of access to the activity, activity points of contact, scheduling and other issues related to the contract. The Contractor shall provide and distribute meeting minutes within five (5) calendar days after the kickoff meeting.

2.2 Work Element 2: Plans

2.2.1 Within 14-days after the kickoff meeting the Contractor shall perform an initial inspection and verify the inventory of equipment listed on the Generator List. The Contactor shall develop an Equipment Assessment Report detailing the condition and operability of the equipment. The updated inventory shall be electronically submitted to government.

2.2.2 Within 28 days after the kickoff meeting the Contractor shall develop and submit a detailed work plan for performing inspections and maintenance on 174 emergency generators. The work plan shall include a schedule that details inspections and PM for each location. The PM plan must demonstrate complete permit compliance with generator maintenance requirements. The PM plan shall be developed based on an economical approach, and in accordance with manufacturer’s recommended procedures, OEM standards, and maintenance required satisfying equipment warranties, where applicable.

2.3 Work Element 3: Performance of Generator Inspections and Maintenance

2.3.1 The Contractor shall perform one year of preventive maintenance (PM) and inspections on 174 backup emergency generator systems to ensure permit compliance, proper operation, minimization of breakdowns, and to maximize useful life. At a minimum each generator must be inspected every six months and PM shall be conducted on each backup generator at least once each calendar year.

2.3.2 Preventive maintenance includes but is not limited to changing fluids, lubricating, bearing inspection and replacement, replacement of small parts, belt adjustments and replacement, filter inspection and replacement and system testing and diagnostics.

2.3.3 During Inspections and PM the Contractor shall clean each backup generator and assure the generators are maintained in a clean, dust free working condition. The Contractor is responsible for assuring the backup generators are maintained in a clean working condition and will function properly during power outages. The Contractor shall perform necessary test and troubleshooting to identify generators that are not functioning properly and make recommendations for repair or replacement.

2.3.4 Filter Replacement – The Contractor is responsible for one filter replacement for each of the generators.

Filters must be identified, ordered, installed and documented as part of the preventive maintenance. Disposal of used filters is the responsibility of the Contractor.

2.3.5 If the Contractor encounters a required repair discovered PM, the Contractor shall secure, tag out or provide a temporary fix prior to leaving the work site and immediately notify the Contracting Officer Representative. The Contractor shall provide written documentation of unsatisfactory conditions and make recommendations for repairs.

2.3.6 Excessive or repeated service call requests for equipment breakdowns or deficiencies may indicate the need for the Contractor to adjust or modify its PM program. These adjustments shall be made at no additional cost to the Government.

2.3.7 As part of preventive maintenance the Contractor shall assure that all control devices are calibrated and functioning properly. The Contractor shall, when necessary, configure, operate, and maintain engine and control devices according to the manufacturer's emission-related written instructions. Contractor may change only those emission-related settings that are permitted by the manufacturer.

2.3.8 The Contractor shall report any control devise that cannot be calibrated or is not functioning properly.

2.3.9 The Contractor shall enter inspection and PM activities into an operating log in each emergency generator room or enclosure containing. Log entry shall include the following: (a) dates and times of engine operation; whether the operation was for maintenance and testing purposes or emergency use; and the nature of the emergency, if known; (b) records of any engine maintenance, PM, and repairs to include the date and a description of the maintenance that was performed; (c) hours of operation for all uses other than those specified above and identification of the nature of that use; (d) date and amount of fuel added; (e) meter and gauge readings and (f) legible name and signature of person performing work and/or making log entry.

2.3.10 The Contractor must possess and provide necessary tools and equipment to perform inspections, testing, PM and small repairs.

2.3.11 The Contractor personnel working on Emergency Generator Systems must be properly trained, qualified and possess applicable state and local licensing/certification requirements. The Contractor shall maintain an up to date record of employees with their qualifications and training. Mechanics performing PM must demonstrate appropriate PM experience, preferably with backup generators.

2.3.12 Reports – The Contractor shall submit monthly reports on inspections and preventive maintenance performed. The report shall document status of all activities with respect to approved workplan and schedule.

Monthly reports will include recommended repairs. The Contractor shall complete, sign and date a form for each time PM or an inspection is performed. One copy of the form is to remain on location with the logbook.

Each form will be submitted electronically as part of the monthly report. Form format and required information must be approved by the government project manager.

2.3.13 The Contractor is responsible for the proper disposal of all waste materials generated as part of performing work under this contract. The Contractor is responsible for properly identifying hazardous waste and making proper disposal.

2.3.14 The Contractor is required to obtain access to USMC MAX /MAXIMO to facilitate work order processing and data collection. Attachment A describes Contractor New Combined Access Card (CAC)

Process. The Contractor shall use Preventive Maintenance (PM) work orders generated by MAXIMO to satisfy contract requirements for planning and execution of services. Contractor shall document work completion by uploading PM field sheets with data, finding, repairs made and complete LOG Tab entries into MAXIMO. Contractor shall initiate a service request/work order in the event further repairs are required.

SECTION 3 – SPECIAL CONDITIONS:

3.1 The Contractor shall obtain approval from the installation POC prior to obtaining photography records, still or motion picture and/or aerial or ground photographs, in accordance with Public Law: 18 U.S. Code 795 and applicable installation regulations. The government may provide a representative to act in an advisory capacity to prevent unauthorized disclosure of classified information.

3.2 Regarding public affairs, the Contractor shall not make available to the news media, or make public disclosure of, any data resulting from actions in this contract. The Contractor shall refer all press or public contacts to the installation POC and shall notify the project manager of their actions. The Contractor may not distribute reports or data to any other source, unless specifically authorized by the installation or Navy Public Affairs Officer. In the event that photographs are required for this contract or pictures are taken to record work progress, the government shall retain final possession of any photographic negatives via the final reports and deliverables or electronic files.

3.3 Any oral directions, instructions, explanations, commitments, and/or acceptance given by any government employee to the Contractor or his personnel, shall not be construed by the Contractor as a change in SOW. Any change in SOW must be issued to the Contractor, in writing, by the Contracting Officer to be binding on the government.

3.4 The Contractor shall communicate regularly with the project manager and the installation POC by phone or electronic mail as to the progress and status of field operations.

3.5 The Contractor shall provide copies of all correspondence to the project manager and the contracting specialist.

3.6 Deliverables shall be submitted with a responsive summary, indicating how each government/regulatory comment was addressed.

3.7 The Contractor shall not incorporate the responses to government comments into any final report unless the project manager has indicated that the Contractor’s response appropriately addresses the government’s review comments.

3.8 The Contractor shall not proceed to the next deliverable without receiving written government approval of the preceding deliverable.

3.9 Deliverables. All deliverables shall be submitted in accordance with the schedule matrix. Deliverables shall use MS-Windows compatible systems on electronic media including word processing language in Microsoft Word, spreadsheet information in Microsoft Excel, and other data (maps, charts) compatible with Adobe Acrobat Reader.

3.10 The Contractor shall provide all personnel, supplies, material, and equipment necessary to complete all work required in this contract.

3.11 Health and safety. The Contractor shall develop and adhere to a site-specific health and safety plan to protect Contractor and government personnel. The Contractor is responsible for the health, safety and well-being of all employees performing work under this contract.

3.12 Data generated. Copies of all laboratory analyses, calculations, reports, etc., generated for the execution of this contract shall become the property of the government and shall not be released or discussed with any other agency or individual without the prior approval of the government project manager.

3.13 Regulatory agencies. Any contact with regulatory agencies by the Contractor related to this contract shall be coordinated by the Installation POC.

3.14 Regulations. The Contractor shall comply with all applicable laws and regulation in connection with the performance of the work under this contract. The Contractor is responsible for understanding and complying with Base regulations. The Contractor shall be solely liable for all damages to persons or property that occurs as a result of work under this contract. The Contractor shall take proper precautions to protect the public as well as government and public property.

3.15 Security and Site Access. The Contractor shall obtain all necessary personnel identification cards and vehicle passes requirements as necessary to meet the installation’s security requirements. Base access will be coordinated through the Client Representative. Notify the project manager prior to starting field work in order to coordinate access. The Contractor shall provide a list of all personnel who will be performing no later than five (5) days prior to commencing the field work. All contract personnel performing work on site on this task must possess a U.S.

citizenship or a Permanent Residence Status.

3.16 Notification of field work. The Contractor shall be responsible for the timely notification to the project manager of the dates and times that the Contractor will be on the installation.

ATTACHMENT A

USMC MAXIMO SYSTEM ACCESS PROCEDURES

Contractor (CTR) New Combined Access Card (CAC) Process

RCO will provide names of New CTR’s requiring a CAC and the contract name to either the Training Coordinator or the Customer Service Supervisor.

The Training Coordinator is located in the Facilities Maintenance Division (FMD) Customer Service Section in Bldg. 2291, Rm 24 and can be reached via telephone at 760-725-4981.

The following steps must be followed for a new Contract Employee to obtain his or her CAC:

1) New CTR must create a Marine Net account in order to access required Cyber C Annual Information Assurance (IA) Training. This training is required to obtain a CAC. Marine Net requires a government sponsor. Provide them with the following POC:

2. Once Marine Net receives confirmation of sponsorship they will activate the CTR’s Marine Net account at which time the CTR can begin their training.

3. The new CTR will then log in to Marine Net and complete the CyberC course which consists of 2 online courses (Cyber Awareness Challenge and PII). Marine Net can be accessed at the base library (Bldg 1146) or on a private computer with internet access. Once the 2 courses are complete Marine Net will auto generate the CyberC certification (3rd certificate).

4. Complete a SAAR Form, DD Form 2875, Aug 2009. If the Contracting Company does not have a copy of this form it can be obtained through FSC or the Training Coordinator. The SAAR form MUST be completed electronically (if ink is used it will be returned to the Training Coordinator).

5. Upon completion, the CTR or CTR Representative will return all three documents (SAAR, CYBER C Cert and PII Cert) electronically to the Training Coordinator.

6. The Training Coordinator will verify the accuracy of the documents and route the SAAR electronically for the appropriate signatures. Once the Training Coordinator has obtained all signatures the SAAR form will then be forwarded to Base Security so they can start the CTR’s Background Investigation. The CTR is required to provide Base Security their Social Security Number.

7. Once the background investigation is completed, Base Security will email the SAAR form back to the Training Coordinator who will do the appropriate paperwork and send a ticket to FMD’s IT Staff. FMD IT will obtain an official email address. Once obtained, electronic documentation will be emailed to the Training Coordinator.

8. Finally at this point the Training Coordinator will make contact with the CTR either via telephone or email. The Training Coordinator will request a meeting with the CTR so the CTR’s information can be entered into the CVS computer system and then the CTR will be directed to Pass and ID. They must present 2 forms of ID to obtain their

CAC.

9. Once the CTR has the CAC in hand they need to call FMD IT Personnel to determine a good time for the CTR to digitally sign their SAAR form. The USMCmax Support team can be reached via telephone at 760-763-9890 or 760-763-9891 and is located at Bldg. 2291, Room 18A. Once the CTR has their CAC in hand they can go to Bldg.

2291 to the USMCmax Support office and request a Maximo account. USMCmax Support personnel will have the CTR complete a form and either give them a Maximo Training date and time right then or they may need to call them with the scheduling information. Maximo training is required for anyone that will be obtaining a Maximo account.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government

GENERATOR LIST

PERM

IT NO.

ENGINE

MANUF

ENGINE

MODEL

BHP

RATI

NG

YE

AR

GENERA

TOR

MAKE

GENERATOR

MODEL

kWe BLGD FUE L

TYP

E

971021 Caterpill ar

3306DT 305 1987 SR4 200 31904 Diese l

971023 Ford CSG-6491- 6005-F

82 1998 KOHLER G30RZ81 31930 Propa ne

976059 John Deere

6068TF250 166 2001 Kohler 100REOZJ 31220 Diese l

971033 Perkins T4-236 106 1983 Powerguar d

DLG-60 60 520447 Diese l

971035 John Deere

4239TF001 90 1983 Detroit Diesel

F0459300 50 220205 Diese l

970664 Cummin s

GTA855A 322 1139 Natur al gas

971044 John Deere

4239TF001 90 1983 Detroit Diesel

F0459300 50 11035 Diese l

971045 Caterpill ar

3412D1 810 1989 SR4 575 20831 Diese l

971046 John Deere

6076AF-00 230 1989 Kohler 150ROZJ71 24100 Diese l

971048 Hino EK-130 290 1991 Generac 3285R-1264B 150 62831 Diese l

971049 Cummin s

6BTA5.9 166 1990 Onan 100GDL30488A 100 31227 Diese l

971050 Detroit Diesel

80637405 475 1991 Kohler 250ROZD71 250 52831 Diese l

971052 John Deere

6076TF 290 1991 Kohler 125ROZJ71 33831 Diese l

971053 Cummin s

NTA-

855G3

535 1989 Kato Light D300FRZ4 250 32912 Diese l

971055 Hino EK-130 290 1991 Generac 32858-1264B 150 43831 Diese l

971056 Cummin s

6BTA5.9 244 1990 430601 Diese l

971057 Cummin s

6BTA5.9F1 208 1992 12074 Diese l

971058 Caterpill ar

3208 146 1991 27137 Diese l

971062 Caterpill ar

3406B 519 1992 5 61513 Diese l

920876 Cummin s

6CTA8.3-G 277 1993 Range

Diese l

971064 John Deere

4039TF001 102 1993 Kohler 60ROZJ71 22035 Diese l

971065 John Deere

4039TF001 102 1993 Kohler 60ROZJ71 60kW 14179 Diese l

971067 Ford LSG-8751- 6005A

132 Kohler 80RZ61 61 1133 Propa ne

971069 Cummin s

4B3.9G2 51 1995 35DGBB 20850 Diese l

971071 Hercules DT2300 85 1993 RDS750 330216 Diese l

971073 Cummin s

G-855 220 Kohler 135RZ 31909 Natur al gas

976058 John Deere

4045TF150 100 2000 Kohler 50REOZJ 27920 Diese l

971481 Ford CSG6491- 6005F

82 Kohler 50RZ 45 31507 Natur al gas

971482 Ford CSG-6491- 6005-F

82 Kohler 50RZ 35 430289 Propa ne

971483 Ford CSG6491- 6005-F

82 Kohler 35RZ62 35 530372 Natur al gas

971484 Ford CSG-6491- 6005-F

82 Kohler 50RZ 35 620370 Propa ne

971485 Ford CSG-6491- 6005-F

82 Kohler 35RZ 35 330379 Propa ne

971486 Ford 45RZ62 82 Kohler 50RZ 45 15020 Natur al gas

971487 Ford CSG-6491- 6005-F

82 Kohler 35RZ 35 520950 Propa ne

971488 Ford CSG-6491- 6005-F

82 Kohler 35RZ82 35 410341 Natur al gas

976060 John Deere

4045TF150 100 2000 Kohler 50REOZJ 510092 Diese l

972229 Generac 98A04195-

240 1998 31520 Diese l

972368 Cummin s

LTA10-G1 380 1998 250DFAC 51056 Diese l

980057 Caterpill ar

3512 2155 2003 1164 Diese l

974442 John Deere

4039TF004 102 1998 12109 Diese l

974511 Ford LSG875 127.8 610547 Propa ne

974876 Cummin s

GTA19GS 490 210721 Natur al gas

974877 Cummin s

GTA28 770 2107201 Natur al gas

974965 Caterpill ar

3508 959 2000 22022 Diese l

974964 Caterpill ar

3508 959 2000 22022 Diese l

974966 Caterpill ar

3508PTO 959 2000 22022 Diese l

974963 Caterpill ar

3508 959 2000 22022 Diese l

974968 Caterpill ar

3508 959 2000 22022 Diese l

974967 John Deere

4039DF004 66 2000 22022

976929 Cummin s

6CTAA8.3-

G1

317 2000 Onan 200DGFC 2456 Diese l

975703 John Deere

6081TF001 211 2000 Kohler 135ROZJ 41300 Diese l

975702 John Deere

608ITF001 211 2000 Kohler 135ROZJ 21537 Diese l

976351 John Deere

6081AF001 330 2000 Kohler 200ROZJ 520830 Diese l

976062 John Deere

4045TF150 100 2000 Kohler 50REOZJ 20816 Diese l

976063 John Deere

6068TF150 150 2000 Kohler 80REOZJ 52710 Diese l

976064 John Deere

6068TF150 150 2000 Kohler 80REOZJ 43310 Diese l

976066 John Deere

6068TF150 150 2000 Kohler 80REOZJ 62510 Diese l

976067 John Deere

4045TF150 100 2000 Kohler 50REOZJ 50 KW 63093 Diese l

980095 John Deere

4045TF150 100 2002 Kohler 50DSEJ 130116 Diese l

971043 Caterpill ar

3208 156 1988 6076AF010 1523 Diese l

977083 Cummin s

QSM11-G2 470 2001 300DQAF 23194

977314 John Deere

4045DF150 71 2000 Kohler 30REOZJ 330608 Diese l

977315 John Deere

6068TF150 150 2001 Kohler 80REOZJ 1594 Diese l

977313 John Deere

4045TF150 100 2000 Kohler 60REOZJ 60 31334 Diese l

976061 John Deere

6081AF001 330 2000 Kohler 200ROZJ 52021 Diese l

976057 John Deere

6081AF001 250 2000 Kohler 20800 Diese l

977794 Cummin s

QSX15-G9 755 2001 Onan DFEJ 60 450 210723 Diese l

977865 John Deere

4045DF150 67 2000 Kohler 50REOZJ 53 Area:

Horno Ridge

Diese l

977864 John Deere

4045DF150 67 2000 Kohler 50REOZJ Horno Ridge

Diese l

977959 John Deere

6068TF250 190 2001 Katolight D125FRJ4 125 Kw 140700 Diese l

978043 John Deere

6068TF250 166 2001 Kohler 100REOZJ 13129 Diese l

978042 John Deere

6068TF250 166 2000 Kohler 100REOZJ 210735 Diese l

978044 Detroit Diesel

6063-TK35 550 Kohler 350REOZD 24058 Diese l

978426 General Motors

Vortec 5.7L 88 2002 60RZG 31330

978789 General Motors

Vortec 8.1 L

150 Kohler 80RZG 2291 Natur al gas

979440 Detroit Diesel

R083-7K36 765 2002 Kohler 500ROZD-4 11064 Diese l

979527 Perkins 2048/1800 95.2 2003 D60P2 52410 Diese l

979529 Perkins 1004-40TW 95.2 2001 D60P2 1279 Diese l

979528 Perkins 2048/1800 95.2 2003 D60P2 21448 Diese l

980550 John Deere

4045TF150 110 2002 Kohler 50REOZJB Akron Hill (no bldg#) 13156

Diese l

980551 John Deere

4045TF150 110 2002 Kohler 50REOZJB Buffalo Bump, Echo Trng Area

Diese l

981034 Volvo TAD1031G E

400 2004 Kohler 250REOZV 200833 Diese l

981522 Volvo TAD1031G E

394 2004 KD250V 60HZ 11040 Diese l

981635 John Deere

3029TF270 64 2004 Kohler 20DSEJB 210561 Diese l

981783 John Deere

4045TF270

E

99 2004 Kohler 50REOZJB 43390 Diese

982166 Cummin s

6BTA5.9-

G4

170 2004 DGDK-5692303 240162 Diese l

983534 John Deere

4045TF150 100 0 Kohler 50DSEJ 130222 Diese l

983883 Cummin s

QSK60-G6 2922 2005 John Deere

1750DQKB 60HZ

(1750K W)

200831 Diese l

984171 John Deere

5030TF270 64 0 Generac 40 KW 250263 Diese l

983947 John Deere

4045HF275 157 2005 Kohler Power System

100REOZJC 100K/

125kV A

210702 Diese l

984485 Perkins 1795/1800 75.1 2002 Olympian D40P2 36 KW 630121 Diese l

984023 Detroit Diesel

MTV

12V2000

1120 2005 750 kW 2799 Diese l

984127 Detroit Diesel

MTV

12V2000

1120 2005 750 kW 2799 Diese l

984854 John Deere

6068HF285 197 2006 22133 Diese l

985712 John Deere

3029TF270 64 2007 22029 Diese l

985713 John Deere

3029TF270 64 2007 3100924 Diese l

985714 John Deere

3029TF270 64 2007 22070 Diese l

985715 John Deere

3029TF270 64 2007 310772 Diese l

985976 Cummin s

QSX15-G9 755 2007 500 kw 170831 Diese l

985978 Cummin s

QSL9-G2-

NR3

364 2007 100 kw 140831 Diese l

986550 John Deere

302TF270 64 2007 210097 Diese l

986551 John Deere

3029TF270 64 2007 31921 Diese l

986754 John Deere

4024TF281

B

66 2008 22071 Diese l

986755 John Deere

4045TF270 99 2007 11062 Diese l

986774 Cummin s

B3.3 77 2007 500 GPM

Fire Pump

CFP33-F35 20850 Diese l

985640 Volvo TAD1641G E

757 2007 240201 Diese l

985819 John Deere

4045TF270 99 2007 530643 Diese l

000564 Mitsubis hi

S16R-

Y2PTAW2-

2923 2008 generator 1750 4100374 Diese l

000653 John Deere

4045HF285

H

99 2009 16088 Diese l

986787 John Deere

4045HF285

I

158 2008 418002 Diese

000582 John Deere

4045HF285

158 2009 generator 100 20250 Diese l

000482 John Deere

403TF001D 110 1993 Kohler 60ROZJ81 52161 Diese l

987670 Cummin s

QSB5-G3

NR3

145 2009 220189 Diese l

987912 John Deere

4024HF285

B

79 2008 510840 Diese l

000682 Cummin s

Ford WSG-

97.7 2009 1133 Propa ne

000345 John Deere

6068HF485

T

297 2008 Generac 200 413560 Diese l

000476 Detroit Diesel

6063HV35-

S60

635 2009 generator 450 140120 Diese l

000557 John Deere

404HF2851 158 2009 generator 100 San Luis Rey Gate Area 17

Diese l

000558 John Deere

4045HF285

158 2009 generator 100 Christian itos Gate

Diese l

000561 John Deere

6068HF485 485 180 P781,

Bldg 14085

Diese l

000669 IVECO/

FTP

F2CE9685

A

389 2010 62 IIT

site

Diese l

000687 John Deere

4045HF285

158 2009 generator 100 520524 Diese l

000676 Cummin s

QSB7-G3-

NR3

250 2010 23093 Diese l

000673 John Deere

4024HF285

B

80 2010 Kohler 50REOZJC 50 530402 Diese l

000894 John Deere

6068HF285

K

237 2010 MTU

Onsite Energy Generator

177 3381U9 Diese l

000859 John Deere

4024HF285

B

65 2010 Generac 12582210100 40 130180T Intersecti on of A St and 14th St

Diese l

000858 John Deere

5030HF285

G

96 2010 DS00060D6SPA

K0574

60 210822 Diese l

000881 Detroit Diesel

S60, 6063HV35

490 2010 Kohler 300REOZDD 300 Hope & Care

Diese l

001289 Cummin s

QSK50-G4-

NR2

2220 2011 Generator DQGAB 1500 2470 Diese l

001172 John Deere

6068HF485 315 2011 Kohler 200REOZJE 200 2010 Diese l

001293 John Deere

4045HF285

I

158 2011 Kohler 100REOZJE 100 31A40 Diese l

001195 Cummin s

QSB5-G3-

NR3

145 2011 Generator 60 1526A Diese l

001290 John Deere

6068HF285 237 2012 Kohler 150REOZJF 137 4111 Diese

001601 Mitsubis hi

S16R-

Y2PTAW2-

2923 2012 Kohler 2000REOZMB 2000 H200 Diese l

001602 Mitsubis hi

S16R-

Y2PTAW2-

2923 2012 Kohler 2000REOZMB 2000 H200 Diese l

001603 Mitsubis hi

S16R-

Y2PTAW2-

2923 2012 Kohler 2000REOZMB 2000 H200 Diese l

001350 General Motors

Power Solutions Vortec 5.7L

105 2011 KOHLER

Generator

60REZG 60 4354B1 Natur al gas

001543 John Deere

6068HF485 315 2011 Kohler Power Systems Generator

200REOZJE 200 5220U1 Diese l

001563 Cummin s

QST30-G5

NR2

1490 2012 Cummins Generator

DQFAD 1000 200831 Diese l

971060 Cummin s

QSB7-G5

NR3

324 2012 Cummins DSGAE- 1208461

200 1160 Diese l

001495 Mitsubis hi

S12R-

Y2PTAW-1

1881 2011 Kohler 1250REOZMB 1250 3120 Diese l

001461 John Deere

4045HF285

I

158 2012 Kohler 100REOZJF 100 2204 Diese l

001562 Perkins 1106D-

E66TAG3

230 2011 Taylor TD150 150 15061 Diese l

001565 Perkins 1106D-

E66TAG3

230 2011 Taylor TD150 150 51080 Diese l

001566 Perkins 1106D-

E66TAG3

230 2011 Taylor TD150 150 160101 Diese l

001564 Perkins 1106D-

E66TAG3

230 2011 Taylor TD150 150 202860 Diese l

001561 Perkins 1106D-

E66TAG3

230 2011 Taylor TD150 150 310006 Diese l

001557 John Deere

5030HF285

G

96 2012 Kohler 60REOZJD 62 4103B4 Diese l

001744 John Deere

6068HFG8

5A.B

318 2013 Kohler 200REOZJF 200 4152 Diese l

001745 John Deere

6068HF285

K

237 2012 Kohler 150REOZJF 137 4100B1 Diese l

001746 John Deere

6068HFG8

318 2012 Kohler 200REOZJF 200 4152B1 Diese l

001538 John Deere

4045HF285

I

158 2012 Kohler 100REOZJF 100 2033 Diese l

001753 Perkins 1106D-

E66TAG3

230 2011 Taylor TD150 150 15100 Diese l

002183 Cummin s

QSK60-G6

NR2

2922 2013 Cummins DQKAE 2000 5278B3 Diese l

002161 Cummin s

QSK23-G7

NR2

1220 2013 Cummins 600DQCA 600 TAPS 12 Diese l

001684 John Deere

6068HFG8

318 2013 KOHLER 200REOZJF 200 2280 Diese

001754 Perkins 1106D-

E66TAG3

230 2012 Generator Joe, 150CP

150 27 Area, H-143

Diese l

002249 John Deere

6068HFG8

318 2013 KOHLER 180 3328 Diese l

002250 John Deere

4045HF285 158 2013 KOHLER 102 3346 Diese l

002248 John Deere

6068HF285 237 2013 KOHLER 154 3330 Diese l

002247 John Deere

6068HFG8

318 2013 KOHLER 200 3332 Diese l

002026 John Deere

6068HF285 237 2013 KOHLER 150 2496U2 Diese l

002025 John Deere

6135HFG7

755 2013 KOHLER 500 22831U3

, TAPS 3

Diese l

002068 John Deere

6068HFG8

315 2013 KOHLER 200 2220U2 Diese l

002029 IVECO/

FTP

F3BE9685

A-E

530 2013 GENERA

C

350 5351

HORNO

Diese l

002386 John Deere

4045HF285

H

133 2014 KOHLER

Generator

80 51811 Diese l

002321 John Deere

4045HF285

I

158 2014 Kohler 100 210560 Diese l

002585 John Deere

6068HFG8

315 2015 Kohler 200 2492 Diese l

002703 John Deere

6068HFG8

315 2015 Kohler 200 24175 Diese l

002662 John Deere

6068HFG8

315 2015 Kohler 200 2614 Diese l

002768 Cummin s

QSB5-G3

NR3

145 2015 270401 Diese l

002518 Cummin s

QSB5-G3

NR3

145 2013 17017 Diese l

002670 General Motors

Vortec 8.1L 164.4 2009 Kohler 100 SONGS

II, 51

Area

Propa ne

Pendin g

John Deere

6090HF484 422 2015 Las Pulgas Pump Stn

Diese

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 24-SEP-2020 TO

23-SEP-2021

N/A M33000

MARK BONSAVAGE

BLDG 22165, MCB

CAMP PENDLETON CA 92055

760-725-9721 FOB: Destination

M33000

0002 POP 24-SEP-2020 TO

23-SEP-2021

N/A (SAME AS PREVIOUS LOCATION)

FOB: Destination M33000

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.212-1 Instructions to Offerors--Commercial Items JUN 2020 52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

252.203-7000 Requirements Relating to Compensation of Former DoD Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

DEC 2019

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation

DEC 2019

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services

DEC 2019

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017 252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

252.243-7001 Pricing Of Contract Modifications DEC 1991

252.244-7000 Subcontracts for Commercial Items JUN 2013 252.246-7003 Notification of Potential Safety Issues JUN 2013 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for

Military Operations

OCT 2010

252.246-7008 Sources of Electronic Parts MAY 2018 252.247-7023 Transportation of Supplies by Sea FEB 2019

52.212-1 ADDENDUM

1. SUBMISSION OF QUOTATIONS: Quotations must be received no later than the date and time specified in block #8, page #1 – Pacific Daylight Time (PDT). Quotes shall be submitted via email. Please respond to luong.phan@usmc.mil directly with quotation.

2. QUESTIONS: Questions shall be submitted by email no later than 2 days after issuance of the solicitation to the email address listed below. No phone questions will be accepted. The deadline is necessary to ensure timely award and the Government may, in its sole discretion, choose not to respond to questions received after the deadline. All questions will be reviewed and responded to by an amendment to the solicitation. Email questions to luong.phan@usmc.mil.

3. PERIOD OF ACCEPTANCE OF OFFERORS: The pricing terms and conditions of the proposal shall be valid for 90 days unless a longer time is stated otherwise in the quote.

4. SAM. Offerors must be registered in the System for Award Management (SAM) database. Information in SAM should be current, if not – completion of the attached FAR Provision 52.212-3, Certifications and Representations is required with quotation. Information on registering in SAM may be obtained from www.sam.gov or calling 866- 606-8220. Registration in SAM is free.

5. WIDE-AREA WORKFLOW – RECEIPT AND ACCEPTANCE. As a condition of receipt of any resulting order, the Contractor agrees to implement the Department of Defense (DOD) web-based application. Information on registering in WAWF/iRAPT may be obtained from https://wawf.eb.mil/xhtml/unauth/registration/notice.xhtml or calling 866-618-5988. Registration in WAWF/iRAPT is free.

CLAUSES INCORPORATED BY FULL TEXT

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

(i) Technical capability that meets the needs of the Government; and

(ii) Price

(b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

52.212-2 ADDENDUM

Regional Contracting Office, Camp Pendleton, CA, is issuing Request For Quotation (RFQ) to procure Standby Generator Maintenance services. This procurement is conducted in accordance with FAR Part 12 (Acquisition of Commercial Items) utilizing FAR Part 13 (Simplified Acquistion Procedures).

Incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2020-06, effective May 6, 2020 and DFARS Change Notice (DCN) 20200605, effective June 5, 2020.

BASIS FOR AWARD. Award will be made on the lowest price technically acceptable (LPTA). The resulting award will be a Firm-Fixed Priced purchase order, all or none, to provide Standby Generator Maintenance services.

EVALUATION. The Government intends to make a single Firm Fixed Price award to satisfy this requirement.

Award will be made on the initial evaluation of quotes received in response to this RFQ. Therefore, quoters are cautioned to ensure that initial quotes contain your best terms from a technical and price standpoint. The following factors will be used to evaluate quotes:

1. TECHNICAL: Minimum specifications:

Provide a Capability Statement that outlines how generator maintenance will be accomplished under the terms of the Statement of Work.

Provide sufficient information to support the implementation of the tasks outlined within the Statement of Work, paragraph 2.3 (2.3.1 – 2.3.13).

Rating will be in accordance with: RATING

DESCRIPTION

ACCEPTABLE Quotation meets the requirements of the solicitation.

UNACCEPTABLE Quotation does not meet the requirements of the solicitation.

(Sufficient information shall be provided to support capability to meet the required brand name products and services requested, to include but not limited to, product literature, product number, authorized service provider letter, etc…)

2. PERIOD OF PERFORMANCE: 24 September 2020 to 23 September 2021.

3. PRICE: All quotes must be the Contractor’s Best Pricing. Price analysis shall be used to verify that the overall price offered is fair and reasonable. The Offeror shall input the unit price and total in all the line items present in the SF1449. The total evaluated price is calculated using the prices proposed for all line items.

4. EVALUATION PROCESS: The evaluation will proceed as follows:

a) Quotes will be ranked in order from lowest to highest based on the price. The lowest priced quotation will then be evaluated and receive a rating of Acceptable or Unacceptable based on the technical criteria above.

In order to be rated as Acceptable, the technical quote must meet the Government’s minimum requirements as described in the solicitation. Quotes deemed Unacceptable are those that fail to meet the Government’s minimum requirements.

b) If the lowest quoter’s technical quote is rated Acceptable, the Government will then evaluate that quoter’s pricing to determine fair and reasonableness IAW FAR 15.404-1(b)(2). If the lowest priced quotation is evaluated to have an Acceptable technical quote and fair and reasonable prices the Government will complete a responsibility determination IAW the criteria specified in FAR 9.104-1. If found responsible, the Government may stop the evaluation process at this point as that quote represents the best value to the Government. Award shall be made to that quoter without further consideration of any other quotes.

c) If the lowest priced quotation is assigned an Unacceptable rating, or if the price is determined not fair and reasonable, or if the quoter is found to be non-responsible, the next lowest priced quote will be evaluated.

This process will continue (in ascending order) until a quoter is evaluated to have an Acceptable technical rating, fair and reasonable prices, and the quoter is deemed responsible. The government reserves the right to evaluate all quotes. The award will be made to the quoter whose quotation represents the best value to the Government on a LPTA basis.

The Government reserves the right to award no contract, depending on the quality of the quotes submitted and availability of funds for the requirement. The Government intends to evaluate quotes and award a single contract without requesting or accepting revised quotes. Therefore, the Offerors will be advised that their initial quote should contain the most favorable terms and reflect it’s best possible performance potential. The Government does reserve the right to clarify aspects of the quotes and hold discussions.

CLAUSES INCORPORATED BY FULL TEXT

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (JUN 2020)

The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically in the System for Award Management (SAM) accessed through https://www.sam.gov. If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (v) of this provision.

(a) Definitions. As used in this provision --

“Covered telecommunications equipment or services” has the meaning provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

“Economically disadvantaged women-owned small business (EDWOSB) Concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.

"Forced or indentured child labor" means all work or service-

(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or

(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.

“Highest-level owner” means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

“Immediate owner” means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

“Inverted domestic corporation” means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).

“Manufactured end product” means any end product in product and service codes (PSCs) 1000-9999, except--

(1) PSC 5510, Lumber and Related Basic Wood Materials;

(2) Product or Service Group (PSG) 87, Agricultural Supplies;

(3) PSG 88, Live Animals;

(4) PSG 89, Subsistence;

(5) PSC 9410, Crude Grades of Plant Materials;

(6) PSC 9430, Miscellaneous Crude Animal Products, Inedible;

(7) PSC 9440, Miscellaneous Crude Agricultural and Forestry Products;

(8) PSC 9610, Ores;

(9) PSC 9620, Minerals, Natural and Synthetic; and

(10) PSC 9630, Additive Metal Materials.

“Place of manufacture” means the place where an end product is assembled out of components, or otherwise made or processed from raw materials into the finished product that is to be provided to the Government. If a product is disassembled and reassembled, the place of reassembly is not the place of manufacture.

“Predecessor” means an entity that is replaced by a successor and includes any predecessors of the predecessor.

“Restricted business operations” means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate--

(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;

(2) Are conducted pursuant to specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;

(3) Consist of providing goods or services to marginalized populations of Sudan;

(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;

(5) Consist of providing goods or services that are used only to promote health or education; or

(6) Have been voluntarily suspended.

“Sensitive technology”--

(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically--

(i) To restrict the free flow of unbiased information in Iran; or

(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and

(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).

“Service-disabled veteran-owned small business concern”--

(1) Means a small business concern--

(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and

(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.

(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).

“Small business concern” means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR Part 121 and size standards in this solicitation.

“Small disadvantaged business concern”, consistent with 13 CFR 124.1002, means a small business concern under the size standard applicable to the acquisition, that--

(1) Is at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124.105) by--

(i) One or more socially disadvantaged (as defined at 13 CFR 124.103) and economically disadvantaged (as defined at 13 CFR 124.104) individuals who are citizens of the United States; and

(ii) Each individual claiming economic disadvantage has a net worth not exceeding $750,000 after taking into account the applicable exclusions set forth at 13 CFR 124.104(c)(2); and

(2) The management and daily business operations of which are controlled (as defined at 13.CFR 124.106) by individuals, who meet the criteria in paragraphs (1)(i) and (ii) of this definition.

“Subsidiary” means an entity in which more than 50 percent of the entity is owned--

(1) Directly by a parent corporation; or

(2) Through another subsidiary of a parent corporation.

“Successor” means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name.

The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.

“Veteran-owned small business concern” means a small business concern--

(1) Not less than 51 percent of which is owned by one or more veterans (as defined at 38 U.S.C. 101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and

(2) The management and daily business operations of which are controlled by one or more veterans.

"Women-owned business concern" means a concern which is at least 51 percent owned by one or more women; or in the case of any publicly owned business, at least 51 percent of the stock of which is owned by one or more women; and whose management and daily business operations are controlled by one or more women.

“Women-owned small business concern” means a small business concern--

(1) That is at least 51 percent owned by one or more women or, in the case of any publicly owned business, at…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .