M00681-14-T-0056_Washer-Dryer_Preventive_Maintenance_and_Repair.pdf
PDF 2 MB Posted
- Solicitation number
- M00681-14-T-0056
- Issued by
-
United States Marine Corps
About this file
Washer and Dryer Preventive Maintenance and Repair Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Copy_of_EQUIPMENT_INVENTORY_LAUNDRY_ROOM_Miramar.xlsx | XLSX spreadsheet | |
| M00681-14-T-0056-0001_Solicitation_Modification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REGIONAL CONTRACTING OFFICE-MCIWEST
P O BOX 555027
CAMP PENDLETON CA 92055-5027
760 725 -8137
760-725-4346
UNDER DPAS (15 CFR 700)
11. DELIVERY FOR FOB
RFQ
SEE SCHEDULE
14. METHOD OF SOLICITATION
IFB RFP
CODE
SEE ADDENDUM
BLOCK IS MARKED
DESTINATION UNLESS
12. DISCOUNT TERMS
(No Collect Calls)
7M
13b. RATING
13a. THIS CONTRACT IS A RATED ORDER
X
CODE
M00681-14-T-0056 02-Jul-2014
b. TELEPHONE NUMBER
760-725-3133
8. OFFER DUE DATE/LOCAL TIME
04:00 PM 10 Jul 2014
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV 3/2005)
Prescribed by GSA
FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY
CODE 10. THIS ACQUISITION IS
UNRESTRICTED
FAX: NAICS:
TEL:
CODE 18a. PAYMENT WILL BE MADE BYOFFEROR
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TEL.
M00681
SIZE STD:
9. ISSUED BY
FACILITY
CODE
17a.CONTRACTOR/
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
15. DELIVER TO CODE M33000 16. ADMINISTERED BY
M33000 CMSC BLDG 22105
RICHARD TALBOT
CMSC
BLDG 22105
CAMP PENDLETON CA 92055
TEL: 7607254792 FAX:
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
VICTORIA BOSTON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES
SEE SCHEDULE
811412
TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS
SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
SB
HUBZONE SB
SET ASIDE: 100 % FOR
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
M3300014SULC100
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
TEL: EMAIL:
2 COPIES
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
.OFFER DATED YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
X
8(A)
SVC-DISABLED VET-OWNED SB
EMERGING SB
X
X
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
SEE SCHEDULE
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT
PAGE 2 OF
23. UNIT PRICE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV 3/2005) BACK
Prescribed by GSA
FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
M00681-14-T-0056
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Lot WASHER/DRYER Maintenance and Repair
FFP
Contract for onsite repairs of Government owned washers & dryers located on board MCB Camp Pendleton, CA. to be performed in accordance with the
Performance Work Statement in the Schedule.
FOB: Destination
PURCHASE REQUEST NUMBER: M3300014SULC100
NET AMT
Washers Repair On Site
FFP
See attachment 1 for inventory list and locations
0002AA 200 Each Washers Repair On Site
FFP
Location: Camp Pendleton
MILSTRIP: M3300014SULC100
0002AB 100 Each Washers Repair On Site
FFP
Location: Miramar
Dryers Repair On Site
FFP
See Attachment 1 for inventory list and locations
0003AA 200 Each Dryer Repairs on Site
FFP
Location: Camp Pendleton
0003AB 100 Each Dryers Repair On Site
FFP
Installation/Disconnection of Washers
FFP
As required
0004AA 300 Each Installation/Disconnection of Washers
FFP
Location: Camp Pendleton
0004AB 30
Installation/Disconnection of Washers
FFP
Installation/Disconnection of Dryers
FFP
As required
0005AA 300
Installation/Disconnection of Dryers
FFP
Location: Camp Pendleton
0005AB 30 Each Installation/Disconnection of Dryers
FFP
Attempted Service Calls
FFP
Attempted Service Call in which service could not be performed due to
Government interference.
0006AA 12
Attempted Service Calls
FFP
Location: Camp Pendleton
0006AB 12 Each Attempted Service Calls
FFP
Multiple Discount Washer Repair
FFP
Two or more washers located at the same building and on the same call apply multiple appliance discount.
0007AA 1,000
Multiple Discount Washer Repair
FFP
Location: Camp Pendleton
0007AB 10
Multiple Discount Washer Repair
FFP
Multiple Discount Dryer Repair
FFP
Two or more dryers located at the same building and on the same call. Apply multiple appliance discount.
0008AA 1,500 Each Multiple Discount Dryer Repair
FFP
Location: Camp Pendleton
0008AB 10 Each Multiple Discount Dryer Repair
FFP
0009 Each Semi-Annual Maintenance
FFP
To be performed in accordance with the Performance Work Statement in the
Schedule.
0009AA 2 Each Semi-Annual Maintenance
FFP
Location: Camp Pendleton
0009AB 2 Each Semi-Annual Maintenance
FFP
0010 Months Monthly Maintenance Heavy Duty Washers
FFP
As required per PWS.
0010AA 12 Months Monthly Maintenance Heavy Duty Washers
FFP
Location: Camp Pendleton
0010AB 12 Months Monthly Maintenance Heavy Duty Washers
FFP
0011 Each Repairs Heavy Duty Washers
FFP
As required per PWS
0011AA 50 Each Repairs Heavy Duty Washers
FFP
Location: Camp Pendleton
0011AB 50 Each Repairs Heavy Duty Washers
FFP
0012 Months Monthly Maintenance Heavy Duty Dryers
FFP
0012AA 12 Months Monthly Maintenance Heavy Duty Dryers
FFP
Location: Camp Pendleton
0012AB 12 Months Monthly Maintenance Heavy Duty Dryers
FFP
0013 Each Repairs Heavy Duty Dryers
FFP
0013AA 50 Each Repairs Heavy Duty Dryers
FFP
Location: Camp Pendleton
0013AB 50 Each Repairs Heavy Duty Dryers
FFP
0014 Each Contractor Supplied Parts
FFP
As required per PWS.
0014AA 65,000 Dollars, U.S.
Contractor Supplied Parts
FFP
Location: Camp Pendleton
0014AB 20,000 Dollars, Contractor Supplied Parts
1001 Lot OPTION WASHER/DRYER Maintenance and Repair
FFP
Contract for onsite repairs of Government owned washers & dryers located on board MCB Camp Pendleton, CA. to be performed in accordance with the
Performance Work Statement in the Schedule. Period of Performance is 01 August
2015 through 31 July 2016
OPTION Washers Repair On Site
FFP
See attachment 1 for inventory list and locations
1002AA 200 Each OPTION Washers Repair On Site
FFP
Location: Camp Pendleton
1002AB 100 Each OPTION Washers Repair On Site
FFP
OPTION Dryers Repair On Site
FFP
See Attachment 1 for inventory list and locations
1003AA 200 Each OPTION Dryer Repairs on Site
FFP
1003AB 100 Each OPTION Dryers Repair On Site
FFP
OPTION Installation/Disconnection of Washers
FFP
As required
1004AA 300 Each OPTION Installation/Disconnection of Washers
FFP
1004AB 30
OPTION Installation/Disconnection of Washers
FFP
OPTION Installation/Disconnection of Dryers
FFP
As required
1005AA 300
OPTION Installation/Disconnection of Dryers
FFP
1005AB 30 Each OPTION Installation/Disconnection of Dryers
FFP
OPTION Attempted Service Calls
FFP
Attempted Service Call in which service could not be performed due to
Government interference.
1006AA 12
OPTION Attempted Service Calls
FFP
1006AB 12 Each OPTION Attempted Service Calls
FFP
OPTION Multiple Discount Washer Repair
FFP
Two or more washers located at the same building and on the same call apply multiple appliance discount.
1007AA 1,000
OPTION Multiple Discount Washer Repair
FFP
1007AB 10
OPTION Multiple Discount Washer Repair
FFP
OPTION Multiple Discount Dryer Repair
FFP
Two or more dryers located at the same building and on the same call. Apply multiple appliance discount.
1008AA 1,500 Each OPTION Multiple Discount Dryer Repair
FFP
1008AB 10 Each OPTION Multiple Discount Dryer Repair
FFP
1009 Each OPTION Semi-Annual Maintenance
FFP
To be performed in accordance with the Performance Work Statement in the
Schedule.
1009AA 2 Each OPTION Semi-Annual Maintenance
FFP
1009AB 2 Each OPTION Semi-Annual Maintenance
FFP
1010 Months OPTION Monthly Maintenance Heavy Duty Washers
FFP
As required per PWS.
1010AA 12 Months OPTION Monthly Maintenance Heavy Duty Washers
FFP
1010AB 12 Months OPTION Monthly Maintenance Heavy Duty Washers
FFP
1011 Each OPTION Repairs Heavy Duty Washers
FFP
As required per PWS
1011AA 50 Each OPTION Repairs Heavy Duty Washers
FFP
1011AB 50 Each OPTION Repairs Heavy Duty Washers
FFP
1012 Months OPTION Monthly Maintenance Heavy Duty Dryers
FFP
As required per PWS
1012AA 12 Months OPTION Monthly Maintenance Heavy Duty Dryers
FFP
1012AB 12 Months OPTION Monthly Maintenance Heavy Duty Dryers
FFP
1013 Each OPTION Repairs Heavy Duty Dryers
FFP
As required per PWS
1013AA 50 Each OPTION Repairs Heavy Duty Dryers
FFP
1013AB 50 Each OPTION Repairs Heavy Duty Dryers
FFP
1014 Each OPTION Contractor Supplied Parts
FFP
As required per PWS.
1014AA 65,000 Dollars, OPTION Contractor Supplied Parts
1014AB 20,000 Dollars, 2001 Lot OPTION WASHER/DRYER Maintenance and Repair
FFP
Contract for onsite repairs of Government owned washers & dryers located on board MCB Camp Pendleton, CA. to be performed in accordance with the
Performance Work Statement in the Schedule. Period of Performance is 01 August
2016 through 31 July 2017.
OPTION Washers Repair On Site
FFP
See attachment 1 for inventory list and locations
2002AA 200 Each OPTION Washers Repair On Site
FFP
2002AB 100 Each OPTION Washers Repair On Site
FFP
OPTION Dryers Repair On Site
FFP
See Attachment 1 for inventory list and locations
2003AA 200 Each OPTION Dryer Repairs on Site
FFP
2003AB 100 Each OPTION Dryers Repair On Site
FFP
OPTION Installation/Disconnection of Washers
FFP
As required
2004AA 300 Each OPTION Installation/Disconnection of Washers
FFP
2004AB 30
OPTION Installation/Disconnection of Washers
FFP
OPTION Installation/Disconnection of Dryers
FFP
As required
2005AA 300
OPTION Installation/Disconnection of Dryers
FFP
2005AB 30 Each OPTION Installation/Disconnection of Dryers
FFP
OPTION Attempted Service Calls
FFP
Attempted Service Call in which service could not be performed due to
Government interference.
2006AA 12
OPTION Attempted Service Calls
FFP
2006AB 12 Each OPTION Attempted Service Calls
FFP
OPTION Multiple Discount Washer Repair
FFP
Two or more washers located at the same building and on the same call apply multiple appliance discount.
2007AA 1,000
OPTION Multiple Discount Washer Repair
FFP
2007AB 10
OPTION Multiple Discount Washer Repair
FFP
OPTION Multiple Discount Dryer Repair
FFP
Two or more dryers located at the same building and on the same call. Apply multiple appliance discount.
2008AA 1,500 Each OPTION Multiple Discount Dryer Repair
FFP
2008AB 10 Each OPTION Multiple Discount Dryer Repair
FFP
2009 Each OPTION Semi-Annual Maintenance
FFP
To be performed in accordance with the Performance Work Statement in the
Schedule.
2009AA 2 Each OPTION Semi-Annual Maintenance
FFP
2009AB 2 Each OPTION Semi-Annual Maintenance
FFP
2010 Months OPTION Monthly Maintenance Heavy Duty Washers
FFP
As required per PWS.
2010AA 12 Months OPTION Monthly Maintenance Heavy Duty Washers
FFP
2010AB 12 Months OPTION Monthly Maintenance Heavy Duty Washers
FFP
2011 Each OPTION Repairs Heavy Duty Washers
FFP
As required per PWS
2011AA 50 Each OPTION Repairs Heavy Duty Washers
FFP
2011AB 50 Each OPTION Repairs Heavy Duty Washers
FFP
2012 Months OPTION Monthly Maintenance Heavy Duty Dryers
FFP
As required per PWS
2012AA 12 Months OPTION Monthly Maintenance Heavy Duty Dryers
FFP
2012AB 12 Months OPTION Monthly Maintenance Heavy Duty Dryers
FFP
2013 Each OPTION Repairs Heavy Duty Dryers
FFP
As required per PWS
2013AA 50 Each OPTION Repairs Heavy Duty Dryers
FFP
2013AB 50 Each OPTION Repairs Heavy Duty Dryers
FFP
2014 Each OPTION Contractor Supplied Parts
FFP
As required per PWS.
2014AA 65,000 Dollars, 2014AB 20,000 Dollars, 3001 Lot OPTION WASHER/DRYER Maintenance and Repair
FFP
Contract for onsite repairs of Government owned washers & dryers located on board MCB Camp Pendleton, CA. to be performed in accordance with the
Performance Work Statement in the Schedule. Period of Performance is 01 August
2017 through 31 July 2018.
OPTION Washers Repair On Site
FFP
See attachment 1 for inventory list and locations
3002AA 200 Each OPTION Washers Repair On Site
FFP
3002AB 100 Each OPTION Washers Repair On Site
FFP
OPTION Dryers Repair On Site
FFP
See Attachment 1 for inventory list and locations
3003AA 200 Each OPTION Dryer Repairs on Site
FFP
3003AB 100 Each OPTION Dryers Repair On Site
FFP
OPTION Installation/Disconnection of Washers
FFP
As required
3004AA 300 Each OPTION Installation/Disconnection of Washers
FFP
3004AB 30
OPTION Installation/Disconnection of Washers
FFP
OPTION Installation/Disconnection of Dryers
FFP
As required
3005AA 300
OPTION Installation/Disconnection of Dryers
FFP
3005AB 30 Each OPTION Installation/Disconnection of Dryers
FFP
OPTION Attempted Service Calls
FFP
Attempted Service Call in which service could not be performed due to
Government interference.
3006AA 12
OPTION Attempted Service Calls
FFP
3006AB 12 Each OPTION Attempted Service Calls
FFP
OPTION Multiple Discount Washer Repair
FFP
Two or more washers located at the same building and on the same call apply multiple appliance discount.
3007AA 1,000
OPTION Multiple Discount Washer Repair
FFP
3007AB 10
OPTION Multiple Discount Washer Repair
FFP
OPTION Multiple Discount Dryer Repair
FFP
Two or more dryers located at the same building and on the same call. Apply multiple appliance discount.
3008AA 1,500 Each OPTION Multiple Discount Dryer Repair
FFP
3008AB 10 Each OPTION Multiple Discount Dryer Repair
FFP
3009 Each OPTION Semi-Annual Maintenance
FFP
To be performed in accordance with the Performance Work Statement in the
Schedule.
3009AA 2 Each OPTION Semi-Annual Maintenance
FFP
3009AB 2 Each OPTION Semi-Annual Maintenance
FFP
3010 Months OPTION Monthly Maintenance Heavy Duty Washers
FFP
As required per PWS.
3010AA 12 Months OPTION Monthly Maintenance Heavy Duty Washers
FFP
3010AB 12 Months OPTION Monthly Maintenance Heavy Duty Washers
FFP
3011 Each OPTION Repairs Heavy Duty Washers
FFP
As required per PWS
3011AA 50 Each OPTION Repairs Heavy Duty Washers
FFP
3011AB 50 Each OPTION Repairs Heavy Duty Washers
FFP
3012 Months OPTION Monthly Maintenance Heavy Duty Dryers
FFP
As required per PWS
3012AA 12 Months OPTION Monthly Maintenance Heavy Duty Dryers
FFP
3012AB 12 Months OPTION Monthly Maintenance Heavy Duty Dryers
FFP
3013 Each OPTION Repairs Heavy Duty Dryers
FFP
As required per PWS
3013AA 50 Each OPTION Repairs Heavy Duty Dryers
FFP
3013AB 50 Each OPTION Repairs Heavy Duty Dryers
FFP
3014 Each OPTION Contractor Supplied Parts
FFP
As required per PWS.
3014AA 65,000 Dollars, 3014AB 20,000 Dollars, 4001 Lot OPTION WASHER/DRYER Maintenance and Repair
FFP
Contract for onsite repairs of Government owned washers & dryers located on board MCB Camp Pendleton, CA. to be performed in accordance with the
Performance Work Statement in the Schedule. Period of Performance is 01 August
2018 throught 31 July 2019.
OPTION Washers Repair On Site
FFP
See attachment 1 for inventory list and locations
4002AA 200 Each OPTION Washers Repair On Site
FFP
4002AB 100 Each OPTION Washers Repair On Site
FFP
OPTION Dryers Repair On Site
FFP
See Attachment 1 for inventory list and locations
4003AA 200 Each OPTION Dryer Repairs on Site
FFP
4003AB 100 Each OPTION Dryers Repair On Site
FFP
OPTION Installation/Disconnection of Washers
FFP
As required
4004AA 300 Each OPTION Installation/Disconnection of Washers
FFP
4004AB 30
OPTION Installation/Disconnection of Washers
FFP
OPTION Installation/Disconnection of Dryers
FFP
As required
4005AA 300
OPTION Installation/Disconnection of Dryers
FFP
4005AB 30 Each OPTION Installation/Disconnection of Dryers
FFP
OPTION Attempted Service Calls
FFP
Attempted Service Call in which service could not be performed due to
Government interference.
4006AA 12
OPTION Attempted Service Calls
FFP
4006AB 12 Each OPTION Attempted Service Calls
FFP
OPTION Multiple Discount Washer Repair
FFP
Two or more washers located at the same building and on the same call apply multiple appliance discount.
4007AA 1,000
OPTION Multiple Discount Washer Repair
FFP
4007AB 10
OPTION Multiple Discount Washer Repair
FFP
OPTION Multiple Discount Dryer Repair
FFP
Two or more dryers located at the same building and on the same call. Apply multiple appliance discount.
4008AA 1,500 Each OPTION Multiple Discount Dryer Repair
FFP
4008AB 10 Each OPTION Multiple Discount Dryer Repair
FFP
4009 Each OPTION Semi-Annual Maintenance
FFP
To be performed in accordance with the Performance Work Statement in the
Schedule.
4009AA 2 Each OPTION Semi-Annual Maintenance
FFP
4009AB 2 Each OPTION Semi-Annual Maintenance
FFP
4010 Months OPTION Monthly Maintenance Heavy Duty Washers
FFP
As required per PWS.
4010AA 12 Months OPTION Monthly Maintenance Heavy Duty Washers
FFP
4010AB 12 Months OPTION Monthly Maintenance Heavy Duty Washers
FFP
4011 Each OPTION Repairs Heavy Duty Washers
FFP
As required per PWS
4011AA 50 Each OPTION Repairs Heavy Duty Washers
FFP
4011AB 50 Each OPTION Repairs Heavy Duty Washers
FFP
4012 Months OPTION Monthly Maintenance Heavy Duty Dryers
FFP
As required per PWS
4012AA 12 Months OPTION Monthly Maintenance Heavy Duty Dryers
FFP
4012AB 12 Months OPTION Monthly Maintenance Heavy Duty Dryers
FFP
4013 Each OPTION Repairs Heavy Duty Dryers
FFP
As required per PWS
4013AA 50 Each OPTION Repairs Heavy Duty Dryers
FFP
4013AB 50 Each OPTION Repairs Heavy Duty Dryers
FFP
4014 Each OPTION Contractor Supplied Parts
FFP
As required per PWS.
4014AA 65,000 Dollars, 4014AB 20,000 Dollars, PERFORMANCE WORK STATEMENT
Performance Work Statement
For Washers and Dryers Preventive Maintenance and Repair
1.0 Introduction
The Regional Contracting Office-MCI-WEST is procuring support and services for washers and dryers located at
Marine Corps Base (MCB), Camp Pendleton and Marine Corps Air Station Miramar in California.
MCB Camp Pendleton is the largest United States Marine Corps base on the West Coast. It is located on the
Southern California coast, in Northern San Diego County. MCB Camp Pendleton supports over 100,000 Marines both active duty and reservist for training and Unit readiness.
Consolidated Material and Service Center (CMSC) provides services, furniture, and appliances to 18 Camps and over 140 Barracks onboard MCB Camp Pendleton, spread out over 125,000 acres to include:
11 Area: 1st Marine Division headquarters
13 Area (Main side): Headquarters Area: 1st Marine Logistics Group; 9th Communications Battalion; 1st
Radio Battalion; 1st Intelligence Battalion; 1st Dental Battalion; Marine Corps Installations West
Headquarters
14 Area: Combat Logistics Regiment 1; Combat Logistics Regiment 17; 7th Engineer Support Battalion;
Combat Logistics Battalion 1
15 Area: Security Battalion
21 Area (Camp Del Mar): I Marine Expeditionary Force Headquarters; 3rd Assault Amphibian Battalion;
Combat Logistics Battalion 5; Field Medical Training Battalion, 11th Marine Expeditionary Unit, 13th
Marine Expeditionary Unit and 15th Marine Expeditionary Unit.
22 Area (Camp Chappo): 1st Medical Battalion
23 Area (MCAS Camp Pendleton): Marine Aircraft Group 39
24 Area (Camp Vado Del Rio): MAG-39 Barracks; Base Brig
25 Area (Vado Del Rio): Marine Wing Support Squadron 372
31 Area (Edson Range): Weapons & Field Training Battalion
32 Area: MASS-3, 3d LAAD Bn, MACS-1 Det A
33 Area (Camp Margarita): 1st Reconnaissance Battalion
41 Area (Camp Las Flores): 1st Light Armored Reconnaissance Battalion; 4th Light Armored
Reconnaissance Battalion, 1st Air Naval Gunfire Liaison Company
43 Area (Camp Las Pulgas): 11th Marine Regiment; 1st Maintenance Battalion
52 Area (Camp San Onofre): United States Marine Corps School of Infantry
53 Area (Camp Horno): 1st Marine Regiment; 1st battalion, 4th Marine Regiment
62 Area (Camp San Mateo): 5th Marine Regiment; 1st Combat Engineer Battalion
64 Area (Camp Talega): Reserve Support Unit (West); VMU-4
Marine Corps Air Station Miramar services the Bachelor Enlisted Quarters
2.0 Background
MCB Camp Pendleton and MCAS Miramar have Government Owned Equipment (GOE) washers and dryers (also referred to as appliances) located at multiple locations throughout MCB Camp Pendleton and Miramar. The services required are for on-site repair of various types of washers and dryers (including installation and disconnection of appliances) in the Bachelor Enlisted Quarters (BEQs) located throughout the base. In addition services are required for monthly preventive maintenance of Heavy Duty Washers and Dryers located at Buildings 24085, 520445 and
5220, and semi-annual dryer cleaning service at Building 520420, 520422, 520440, and 520442, MCB Camp
Pendleton. MCAS Miramar Dexter heavy duty washer and dryers are in buildings 5110, 5210, 5310, 5410, 5420 and
5710.
http://en.wikipedia.org/wiki/1st_Marine_Division_(United_States) http://en.wikipedia.org/wiki/1st_Marine_Logistics_Group http://en.wikipedia.org/wiki/9th_Communications_Battalion http://en.wikipedia.org/wiki/1st_Radio_Battalion http://en.wikipedia.org/wiki/1st_Radio_Battalion http://en.wikipedia.org/wiki/1st_Intelligence_Battalion http://en.wikipedia.org/wiki/1st_Dental_Battalion http://en.wikipedia.org/wiki/Marine_Corps_Installations_West http://en.wikipedia.org/wiki/Combat_Logistics_Regiment_1 http://en.wikipedia.org/wiki/Combat_Logistics_Regiment_17 http://en.wikipedia.org/wiki/7th_Engineer_Support_Battalion http://en.wikipedia.org/wiki/Combat_Logistics_Battalion_1 http://en.wikipedia.org/w/index.php?title=Security_Battalion&action=edit&redlink=1 http://en.wikipedia.org/wiki/I_Marine_Expeditionary_Force http://en.wikipedia.org/wiki/3rd_Assault_Amphibian_Battalion http://en.wikipedia.org/wiki/Combat_Logistics_Battalion_5 http://en.wikipedia.org/wiki/11th_Marine_Expeditionary_Unit http://en.wikipedia.org/wiki/13th_Marine_Expeditionary_Unit http://en.wikipedia.org/wiki/13th_Marine_Expeditionary_Unit http://en.wikipedia.org/wiki/15th_Marine_Expeditionary_Unit http://en.wikipedia.org/wiki/1st_Medical_Battalion http://en.wikipedia.org/wiki/MCAS_Camp_Pendleton http://en.wikipedia.org/wiki/Marine_Aircraft_Group_39 http://en.wikipedia.org/wiki/Marine_Wing_Support_Squadron_372 http://en.wikipedia.org/wiki/Edson_Range http://en.wikipedia.org/wiki/MASS-3 http://en.wikipedia.org/wiki/3rd_Low_Altitude_Air_Defense_Battalion http://en.wikipedia.org/wiki/MACS-1 http://en.wikipedia.org/wiki/1st_Reconnaissance_Battalion http://en.wikipedia.org/wiki/1st_Light_Armored_Reconnaissance_Battalion http://en.wikipedia.org/wiki/4th_Light_Armored_Reconnaissance_Battalion http://en.wikipedia.org/wiki/4th_Light_Armored_Reconnaissance_Battalion http://en.wikipedia.org/wiki/Air_Naval_Gunfire_Liaison_Company http://en.wikipedia.org/wiki/11th_Marine_Regiment_(United_States) http://en.wikipedia.org/wiki/1st_Maintenance_Battalion http://en.wikipedia.org/wiki/United_States_Marine_Corps_School_of_Infantry http://en.wikipedia.org/wiki/1st_Marine_Regiment_(United_States) http://en.wikipedia.org/wiki/5th_Marine_Regiment_(United_States) http://en.wikipedia.org/wiki/1st_Combat_Engineer_Battalion http://en.wikipedia.org/wiki/VMU-4
BEQ facilities in MCAS Miramar with washer and dryers are in buildings 4312, 4325, 5640, 5639, 5696, 5698, 5120. The contactor will be required to perform service calls, random visual inspection and Preventive Maintenance to all washers and dryers within the BEQ complex. All Government personnel on MCB Camp Pendleton and
Miramar, who need these services, will use the services provided under this contract except Marine Corps
Community Services.
3.0 Scope
This is a Firm-Fixed Price, Indefinite Delivery Requirements Type contract for a base year and four options years.
All work shall be performed by qualified mechanics and shall be performed in accordance with best commercial practices. The contractor must have the necessary equipment available for the satisfactory execution of any repair job, including but not limited to: transportation, hand tools, gauges, gas detection equipment, vehicles, fuels and lubricants. The appliances are from various manufacturers including but not limited to, Speed Queen, Huebsch, LG, Frigidaire, Whirlpool, Maytag, General Electric, Dexter and Wascomat. The current estimated inventory of GOE is over 4,782 units (top load and front load washers, single and double stack dryers). An extension of services is anticipated once the manufacturers’ warranty has expired on the new appliances.
4.0 Acronyms
Acronyms or brevity codes are used to designate/denote common terms, organizations, actions, and phrases. These codes are gathered in this section to provide a central point of reference for the contractor.
CMSC - Consolidated Material Services Center
CCR - Customer Complaint Report
COR - Contracting Officer Representative
FAR - Federal Acquisition Regulations
KO - Contracting Officer
MCB - Marine Corps Base
PRS - Performance Requirements Summary
PWS - Performance Work Statement
QAE - Quality Assurance Evaluator
QC - Quality Control
PWD- Public Works Department (Miramar)
FACMgmt. Facilities Management (MCAS Miramar)
MAXIMO – Facilities Management Asset System
WO – Work order assigned through Maximo
5.0 Performance Requirements
5.1 Personnel
At a minimum, the contractor will provide a Contract Manager, Quality Control Manager, Technician Supervisor, and Technicians. The contractor shall provide the Contracting Officer (KO) a Designation Letter of Personnel within five (5) business days prior to start of the contract. No member will be allowed to wear dual hats. All contractor personnel shall present a neat appearance and wear distinctive clothing bearing the name of the company to be easily recognized.
5.1.1 Contract Manager: The Contract Manager shall be responsible for the management and performance of work. The Contract Manager or Alternate shall be available during normal working hours. The Contract Manager or
Alternate must be capable of reading, writing, speaking, and understanding English.
5.1.2 Quality Control Manager: The Quality Control Manager shall be responsible for the overall quality of services performed by the contractor. He or she shall possess at minimum two (2) years as a Quality Control
Manager and shall submit their resume to the KO prior to the start of the contract. The Quality Control Manager must be capable of reading, writing, speaking, and understanding English.
5.1.3 Technician: The Technician shall be responsible for all repairs identified on service tickets provided and proper completion of PM’s assigned.
5.2 Hours of Operation
The normal hours of operation for the purposes of this contract are 7:30 AM to 4:30 PM (PST), Monday through
Friday, except recognized federal holidays. No work will be performed on the holidays.
5.3 Vehicles
Contractor vehicles, while onboard MCB Camp Pendleton and Miramar, must display company name and phone number.
5.4 Service Tickets/Work Order
The Government will utilize and issue Service Tickets/Work Order for all services/repairs against Contract Delivery
Orders. The Service Tickets will serve the purpose of services/repairs initiated and services/repairs received. The appropriate Service Ticket(s) will accompany all invoices submitted. Work issued to the contractor shall be performed within one (1) working day following receipt of a service ticket. Service tickets may be issued verbally or in writing, but if verbally they will be confirmed in writing on the same work day and issued to the contractor, Miramar will only assign work orders. The contractor is only to perform work provided on the service ticket/work order unless authorized by CMSC or PWD Production Control personnel.
Attempt to Make Service Calls. An attempt to make a service call occurs when a service call has been received by the contractor and, due to Government interference, service is not provided. This can occur when there is no malfunction of the equipment and the problem is due to operator error or no Government personnel are present at the service site to provide contractor access to the appliance. The call ticket will be returned to CMSC and PWD
Facilities Management on the same day and CMSC or PWD Facilities will reissue the order when proper arrangements have been made. The contractor is entitled to a fee.
The contractor is not entitled to a fee if, its employees are denied entrance to the installation at the Gate or through his negligence, he responds to a service call that was previously canceled by the Government and the contractor was notified.
Service Ticket Issue Procedures: A service ticket will be issued to the contractor via email for MCB Camp Pendleton and Maximo for MCAS Miramar to the Contract Manager or his/her designation. The contractor has 24 hours to complete the ticket. If the ticket cannot be completed within the required time, the contractor must notify the Quality
Assurance Specialist (QAS) in writing of the reason for the delay. If parts delivery exceeds three days, the contractor must notify the Contracting Officer Representative (COR) in writing with the estimated date of delivery. Once the service ticket is complete the technician must obtain a signature from the POC listed on the service ticket. Once the service ticket is complete the contractor will forward the completed ticket to the QAS.
Daily Service Ticket Status Report: The contractor is required to keep the government current with the status of repairs and will provide the QAS with a Daily Service Ticket Status Report.
5.5 BEQ Repair
The contractor shall furnish all labor, tools, materials, supplies, equipment and new parts necessary to install and repair various makes, models and sizes of GOE. All services provided under this contract shall be in conformance with standard commercial practices. Rebuilt assemblies or sub-assemblies may be used in the repair of appliances with prior approval of the Government when such use is standard commercial practice. Rebuilt assemblies or sub-assemblies shall carry the same warranty as a new assembly or sub-assembly. The contractor will advise CMSC or
PWD Miramar if in its professional opinion an appliance is beyond economical repair, stating the estimated cost of repairs. Final determination will be made by CMSC or PWD Miramar in accordance with standard guidelines. As a general rule, if the estimated one time repair cost for the machine exceeds 50% of the replacement cost, the machine will be considered beyond economic repair. The contractor will be compensated for the service attempts if CMSC or
PWD Miramar determines the repair is not cost effective. There is a threshold, of $100 for a single replacement part without prior approval. If a single repair part exceeds the threshold the contractor is required to provide the COR with a written cost proposal within 24 hours and receive authorization to proceed with purchase and replacement of the part(s). All repairs are to be conducted on-site.
The contractor shall provide all required replacement parts necessary to perform the requirements. In the event a part is required and is not in the Contractor's inventory, the contractor shall obtain that part within three (3) working days. If delivery of replacement parts exceed three working days, the contractor is to notify the COR in writing.
Upon arrival at a repair site, the contractor is to check in with the barracks duty office and check out when complete.
When the job is complete the contractor will contact the POC listed on the service ticket or work order and obtain a signature on the service ticket.
If the Government chooses to exercise the option years, the contractor will provide an updated price list at the start of each option year to reasonably coincide with the Producers Price Index. Appliances under the manufacturer's warranty are not covered by this contract until the warranty expires.
5.6 BEQ Installation/Disconnect of Appliances
As ordered by the Government on written delivery orders, the contractor shall furnish all labor, material, parts, equipment installation and services. The contractor will disconnect existing appliance, install replacement appliance, and set them in operating position, making the utility connections and the leveling of the appliances. The contractor will perform all operational tests and make all necessary adjustments as may be required to ensure full and proper working order. The contractor's responsibility shall be limited to connection of appliances to pre-existing utility service.
If during a repair or service of a washer or dryer, the contractor determines the unit to be beyond its life expectancy or not economically repairable the contractor will mark “DRMO” on the unit, disconnect the unit, transport the unit to Base Property building 2280 for Camp Pendleton, Recycling building 6310 for Miramar and exchange the unit for a new one, transport the unit back to repair location, and install the new unit for Camp Pendleton.
5.7 Preventive Maintenance Commercial Stacked Dryer Cleaning
The dryer units are vented upward through centralized vent pipes to the roof of three-story buildings. The venting configuration has resulted in a need for semi-annual preventive maintenance on these commercial dryers. Not a requirement for Miramar.
Current Inventory of dryers:
Building 520420, 22 stacks (44 dryers) ***Under Renovation 4/14 – 3/15
Building 520422, 22 stacks (44 dryers)
Building 520440, 15 stacks (30 dryers) ***Under Renovation 4/14 – 3/15
Building 520442, 16 stacks (32 dryers)
It is beyond the scope of this contract to clean these interior pipes. The interior pipes shall be cleaned by FMD.
The contactor shall:
1. Disconnect the venting from the interior vent pipes
2. Remove debris in the transmission section of venting from the vent pipe to the machine
3. Replace any air flow baffles that are corroded and non-functional
4. Remove lint and debris from inside the machine
5. Replace vent tubing as necessary
6. Reassemble and reconnect all parts
7. Test dryer for proper air flow through the venting system
If a machine is inoperable after cleaning, submit a written list of inoperable machines to the QAS for issuance of a service ticket.
This cleaning shall be coordinated by the COR with FMD and the Facility Maintenance Manager. The contractor will be given a three working day notice prior to FMD cleaning of interior pipes.
5.8 Heavy Duty Preventive Maintenance
5.8.1 Preventive Maintenance (PM)
Preventive maintenance will be performed monthly and shall include, but is not limited to:
Washer PM Checklist: (Bldg’s 24085, 520445, 5220/See MCAS Miramar inventory for locations)
1) Check door and safety lock as recommended
2) Check that drain valve does not leak during operation
3) Clean automatic soap supply dispenser and lid,
4) Check cycle controls through all cycles,
5) Check all water hoses and connections for security and corrosion.
6) Check V belt for wear and proper tension, replace as required
7) Check motor mounting bolts, tighten as required
8) Inspect inside of machine while washing to detect leaks
9) Check all water and hose connections
10) Clean water inlet valve screen filters, replace as required
11) Clean external water filter, replace as required
12) Make necessary adjustments
13) Remove marks and residue
14) Remove internal lint build up
15) Remove any foreign matter on all interior and exterior surfaces
16) Replace any damage/leaking/corroded parts as necessary
Dryer PM Checklist: (Bldg’s 520445, 5220)
1) Check and clean dryer exhaust ducts and check to make sure they are secure
2) Remove marks and residue
3) Remove internal lint build up
4) Remove any foreign matter on all interior and exterior surfaces
5) Check and clean lint screen and blower, replace lint screens as required
6) Check all belts and adjust as necessary, replace as required
7) Check door seals and door locks, replace as required
8) Check burners for proper operation
9) Check knobs and controls for proper function, replace as required
10) Replace any damage/leaking/corroded parts as necessary
5.9 Heavy Duty Repair
The contractor shall furnish all labor, tools, materials, supplies, equipment and new parts necessary to install and repair various makes, models and sizes of GOE. All services provided under this contract shall be in conformance with standard commercial practices. Rebuilt assemblies or sub-assemblies may be used in the repair of appliances with prior approval of the Government when such use is standard commercial practice. Rebuilt assemblies or sub-assemblies shall carry the same warranty as a new assembly or sub-assembly. The contractor will advise CMSC for
Camp Pendleton and PWD for Miramar if in its professional opinion an appliance is beyond economical repair, stating the estimated cost of repairs. Final determination will be made by CMSC or Facilities Management in accordance with standard guidelines. As a general rule, if the estimated one time repair cost for the machine exceeds
50% of the replacement cost, the machine will be considered beyond economic repair. The contractor will be compensated for the service attempts if CMSC or Facilities Management determines the repair is not cost effective.
There is a threshold of $150 for a single replacement part without prior approval. If a single repair part exceeds the threshold, the contractor is required to provide the COR with a written cost proposal within 24 hours, and receive replacement authorization. All repairs are to be conducted on-site.
The contractor shall provide all required replacement parts necessary to perform the requirements. In the event a part is required and is not in the Contractor's inventory, the contractor shall obtain that part within three (3) working days. If delivery of replacement parts exceed three working days, the contractor is to notify the COR in writing.
If the Government chooses to exercise the option years, the contractor will provide an updated price list at the start of each option year to reasonably coincide with the Producers Price Index. Appliances under the manufacturer's warranty are not covered by this contract until the warranty expires.
6.0 Quality Control
The Contractor shall develop and maintain a Quality Control Plan (QCP). The contractor’s QCP shall have, as a minimum, a description of the inspection process used to ensure all services under this contract will be met, frequency of inspections, and follow up measures intended to improve service.
6.1 Quality Control Program
The contractor shall establish and follow an approved Quality Control Plan (QCP). The QCP shall be submitted with the contractor’s offer. The Contracting Officer (KO) will review and/or approve the QCP. Upon the KO’s approval, the contractor shall implement the approved Quality Control Plan on contract start date. Each time the QCP is updated it shall be submitted to the KO for review/approval.
At a minimum, the QCP shall include the following:
1) An inspection system covering all services required by this contract. It must specify the areas to be inspected on either a scheduled or unscheduled basis, how often inspections will be accomplished, and the titles of the individuals who will perform the inspections. The individuals inspecting for quality control shall not repair the appliances, but shall be an independent individual.
2) A method of identifying deficiencies in the quality of services performed before the level of performance becomes unacceptable.
3) A method of documenting and enforcing quality control operations.
7.0 Quality Assurance
The Government will evaluate the contractor’s performance based on periodic inspections of end results, customer feedback/complaints, and by on-site visits to the contractor facility by the COR to observe the contractor’s quality control in action. Government personnel will not interfere with contractor’s operation during site visits.
8.0 Government Furnished Property: The Government shall provide the contractor with sufficient quantities of water, natural gas and electricity to be used in the performance of this contract. The Government shall provide the contractor with a workstation located at Building 2280, Consolidated Material Services Center (CMSC), for the diagnosis/repair of washers and electric dryers. A Government provided storage area is located in Building 2236.
MCAS Miramar cannot provide a facility or access to intranet for asset management; process to be addressed by service provider and MCAS Miramar PWD.
9.0 Tasks
The Government will evaluate the contractor’s performance under this contract by a combination of visually spot checking completed work for compliance, monitoring and recording all valid customer complaints, and monitoring all work tickets to ensure the required time frames are being met. When an observation indicates defective performance by the contractor; the Quality Assurance Evaluator (QAE) will record the defective performance in writing and forward the record to the contract manager for resolution. All corrections are to be made within 24 hours of notification. The contractor shall take all reasonable precautions to safeguard Government property provided by the Government for the contractor's use or repair during the term of the contract. This responsibility shall include but not be limited to securing Government facilities, equipment, and materials at the end of each work period. The contractor shall be solely responsible for the security of his own property and in no event will the Government be held liable for any such loss.
ADDITIONAL INFORMATION
MAKES OF WASHERS AND DRYERS
Washers: Speed Queen, Top load and front load, commercial grade
Whirlpool, top load, commercial grade
Frigidaire, Front load, commercial grade
LG, Front load, commercial grade
Maytag, Top load, commercial
ESTATE, Top load, commercial
Roper, Top load, commercial
General Electric
Dexter, Industrial grade
Maytag, Industrial grade
Dryers: Whirlpool, gas/electric single/double stacked, commercial grade
Speed Queen, gas/electric single/double stacked, commercial grade
ESTATE, gas single, commercial grade
Maytag, electric single, commercial grade
General Electric gas, commercial grade
General electric (electric) commercial grade
Dexter, gas single and double stacked, industrial
MINIMUM LIST OF SUPPLIES AND PARTS
Vacuum Break Lid Switch Drum Support Rollers
Power Cords Flexible Dryer Vent Hoses FM0425 (5 Ply) Thermal Fuse
Fuse Thermal Motor Drive Pump
Fill Hoses Drain Hoses Hose Washers
Drain Hoses Knobs Hose Clamps
Thermostat Lint Screen Timer Knobs
Timers Coil Kits Motor
INSTRUCTION TO QUOTERS
1. Request for Quotation: This is a request for quotation. A response to this solicitation is considered quotations and not offers. In those instances where the words offer, offeror, and proposal are used, the reader should understand that the use of such words do not change the nature of this request for quotation.
2. Cost of Quotations: This RFQ does not commit the Government to pay any costs incurred in the submission of any proposal/quotations or commit the Government to procure or contract for the supplies/services listed herein.
3. Submission of Quotes: Quotations must be received no later than 09 July 2014 @ 4:00 P.M. (PST). Quotations may be hand-carried, submitted by mail through the U.S. Postal Service, via courier service (UPS, FEDEX, etc.) or emailed to victoria.boston@usmc.mil. Quoter’s bare the burden of ensuring that quotes (and any authorized amendments) reach the designated office on time. Submit 1 (one) original and 1 (one) copy of the quote. NOTE:
FAXED QUOTES WILL NOT BE ACCEPTED.
US Postal Service Hand Carried/Courier Service
Regional Contracting Office MCI-West Regional Contracting Office MCI-West
Attn: Victoria Boston Attn: Victoria Boston
Box 555027 Bldg. 22180
Camp Pendleton, CA 92055-5027 Camp Pendleton, CA 92055
4. Questions: Questions must be submitted in writing by 01 July 2014 @ 10:00 A.M (PST) to the mailing or email address listed above. The deadline is necessary to ensure timely award and the Government may, in its sole discretion, choose not to respond to questions received after the deadline. All questions will be reviewed and responded to by an amendment to the solicitation.
5. Type of Contract: The Government intends to award a Fixed Price Performance Based Indefinite Delivery
Indefinite Quantity (IDIQ) Requirements Service Contract as a result of the quotes received from this solicitation and will place an order with the responsible contractor whose quote, conforming to the solicitation, will be most advantageous to the Government, price and other factors considered, in accordance with FAR 13.106-2. Quotes will be evaluated in an efficient and minimally burdensome fashion per FAR 13.106-2.
6. Format of Quotes: The section specifies the contents, format, and limitations that the offerors shall use when submitting quotes. Offeror’s proposals shall be in the form prescribed below and shall contain a response to each of the areas identified.
Section Number/Name Number of Copies Page Limitations mailto:victoria.boston@usmc.mil
I. SF-1449 Price, Reps & Certs. Signed Original N/A
II. Technical 3 10
III. Quality Assurance Plan 1 5
IV. Past Performance 1 2
Section I. Offeror's Price Quote:
a. The signed original SF 1449 and representations and certifications shall be returned by the closing date. The price quote should be annotated in the schedule of supplies/services contained in the solicitation.
b. Price: The price quote may be provided in the schedule or by separate correspondence. Offeror’s price proposals will be evaluated to determine price realism and reasonableness. Prices, which are excessively high or low, may be considered unrealistic and unreasonable, and may receive no further consideration.
Section II. Technical Capability:
a. Technical Proposal: Describe your knowledge and understanding of the requirements outlined in the Performance Work Statement (PWS). Describe your knowledge, experience with, and understanding of the requirements. Describe qualifications and corporate capabilities (and that of your candidates) specifically related to performing the work required in this PWS. Provide the resume of projected contract manager assigned to this contract. Describe your plan for the preventive maintenance, repair and inventory management to accomplish the work within the timeframe described in the PWS.
Section III. Quality Assurance Plan:
a. Contractor’s Quality Control Plan. The Offeror shall identify their executive level management concepts for ensuring compliance with the essential contract requirements and shall include:
Methods for identifying and preventing deficiencies in the quality of deliverables before the level of performance become unacceptable in accordance with the PWS;
Proactive internal inspection system covering all the deliverables required in the PWS /Contract
Line Items Numbers (CLINS);
Section IV. Past performance:
Offerors shall provide two to three references for similar work completed within the past two years with the points of contact, email address, telephone number, contract number (including dollar value) and a brief description of the work completed. The Government will send out copies of the Past Performance
Questionnaire, under separate cover, to the quoter’s customers (Government agencies or private businesses) for recent and relevant contracts for the same or similar services.
Note: The Government may supplement the information you provide with any other information it may obtain from any other source including its own experience with your firm, or information concerning your performance from any other reliable source.
7. Options. The government will evaluate offers for award purposes by adding the total price for all options to the total price for the base period. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
8. Evaluation Factor For Awards:
The Government will award a contract resulting from this solicitation to the responsible contractor whose quote, conforming to the solicitation; will be the lowest price technically acceptable quote, price and other factors considered, in accordance with FAR 13.106-2. The following factors shall be used to evaluate quotations:
1. Technical
Sub-factor 1: Technical Solution: Technical Solution will be evaluated based whether the proposed solution will result in meeting the performance requirements.
Sub-factor 2: Quality Control Plan: Quality Control Plan will be evaluated based on whether the offeror submits a quality control plan capable of maintaining the performance standard for each task identified in the Quality Assurance Surveillance Plan (QASP).
2. Past Performance: Whether the company and/or the candidate have recent, relevant past performance in a similar scope and magnitude. Contractor shall provide two to three references for similar work completed within the past two years.
3 Price
9. Rejection of Quotations: An offeror’s quote may be deemed Technically Unacceptable if it:
Does not manifest an unconditioned assent to the requirements of the RFQ, including the PWS, contract clauses, and all other material terms and conditions in the RFQ.
Is unrealistic in terms of technical or schedule commitments, or indicative of a failure to comprehend the complexity and risks of the proposed work.
The government reserves the right to award a contract without seeking clarification. Therefore, the quoters initial quote should contain the contractors best terms from a price and technical standpoint.
10. SERVICE CONTRACT ACT (FAR 52.222-41 SERVICE CONTRACT OF 1965, AS AMENDED).
The following paragraphs apply to this contract:
In accordance with Title 29, of the Code of Federal Regulations, Labor…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .