E1. Amendment 0001 - Q&A.docx

DOCX document 50 KB Posted

Attached to
Photography of Posters and Archival Artifacts
Solicitation number
M0026424Q0180
Issued by

About this file

This document is an amendment to a Request for Quote (RFQ) for an Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide professional fine art photography, scanning, and reproduction services for the National Museum of the Marine Corps (NMMC). The contract has a 5-year ordering period and a maximum value of $200,000. Key details include:

The services required include photographing, scanning, and reproducing posters, signs, and other 2D/3D archival artifacts related to Marine Corps history and culture. The contractor must provide equipment and recommendations on imaging, scheduling, and printing. Deliverables include proof prints, digital images, scans, and reproductions. Pricing is required for different levels of retouching, printing sizes, and framing options. The RFQ was previously solicited under Contract M0026420P0085, with the incumbent contractor being Rudinec & Associates. Responses are due by September 9, 2024, and award will be based on price, conformance to the solicitation, and past performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M0026424Q0180

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

Q&A Q&A RFQ number M00264-24-Q-0180 Photography of Posters and Archival Artifacts - IDIQ

Questions
Answers
1. Is there any incumbent/recompete or this is a brand-new project? If yes, could you please provide us with their award number or even if the customer bought similar services in the past.
The customer previously obtained similar services under contract number M0026420P0085 from contractor Rudinec & Associates (CAGE 55EX1).
1. Draft Task Order 1: FIC 2022.0181 is marked for retouch but the level of retouch required is not indicated. Can we assume a severe retouch (level 4)?
Poster was examined, final poster image would require light retouching, a level 1.
1. Task Pricing Table: Line items 17 through 21. Framing is requested as price per each. Can this be quoted as price per linear ft of the frame molding with the cover sheet, backer sheet, hangers and labor included in the price?
Please see the revised Attachment 1 – Pricing Table, Billable Tasks 17-21. Quoters are to provide a min/max pricing range for Tasks 17-21 based on the min/max sizes provided. The minimum price should be for the minimum size provided. The maximum price should be for the maximum size provided and is considered NTE (Not to exceed). The min/max sizes provided are based on the smallest and largest sized items the NMMC expects to potentially require services under this IDIQ contract.

Min/max prices can include hangers, dust cover, backer sheet, and labor.

1. We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number?
See #1.

1. We are in the process of preparing this RFQ, and wanted to ensure i treated the pricing table appropriately:

For the Framing, lines 17-21, they appear to be disregarding the size of the print. Framing cost varies greatly between sizes, the cost of the largest size listed would be several times what the smaller sizes would cost.

From a company perspective, if we have to list 1 number to cover all sizes, we would list the highest necessary cost, and it does look like most of the listed items are of the larger sizes. But as a consideration, I just wanted to see if you might have further insight for us to consider in that pricing.

See #3.

1. How do we fill out the bid sheet or do we just attach the completed price table?
See p. 4 of the RFQ, 52.212-2 Addendum, “Price.” Quoters must complete and submit Attachment 1: Pricing Table with their quote submission. Quoters must submit a price estimate for the Task Order Example in the RFQ in accordance with their completed Pricing Table, Year 1 pricing. The Task Order Example starts on p. 10 of the RFQ.
1. The bid sheet has a max quantity of $200,000...is the unit price, the total of everything included on the price table? or is it everything included on the sample task order?
See p. 11 of the RFQ. The maximum total contract amount is NTE (Not to exceed) $200,000.00 for the entire 5-year ordering period.

See answer to #6 for how to submit quote pricing.

1. Is there a total cost estimate for the performance requirements and deliverables?
See p. 11 of the RFQ. The maximum total contract amount is NTE (Not to exceed) $200,000.00 for the entire 5-year ordering period.
1. pg 5, 3.1.1, For in the intake meeting, can it be done as a virtual meeting? Or in the event that documents need to be reviewed prior to capture in person, can this be done in the same visit with capturing?
Intake meeting will have to be held onsite at the Museum Support Facility (MSF). The contractor will have an opportunity at this time to review workspace for photographing the collection. It is possible the contractor could review documents in person prior to photography.
1. pg 6, 3.1.3/ pg 10, 2. Tasks c. i., iii., iv., Can the TPOC provide a requirement of minimum pixels on the long side of an image in addition to the number of inches?
The pixel range needs to be of fine art publishable quality as well as printing with no pixelation whatsoever at the largest size.
1. pg 10, 2. Tasks: b. i., Can artifacts and documents be moved, taken off wall, out of cases, out of frames; and moved to a flat surface?
In some cases, the poster or artifact may not be able to be removed from its frame. Most of the artifacts and posters are not framed. Some are laminated.
1. Can a flash be used on the items, additional indirect lighting, or infrared light?
In most cases yes, but on occasion indirect lighting will be needed to avoid glare.
1. What is the number of anticipated visits to site to capture over the 5 years?
See PWS Section 4.2: “The Government intends to award an Indefinite Delivery Indefinite Quantity contract (IDIQ) for this requirement with a 5-year ordering period during which individual task orders may be issued/awarded under the master IDIQ contract. The ordering period for the base year shall begin upon the date of contract award.” Due to the IDIQ nature of the contract, there is not a set amount of site visits known over the course of the ordering period.
1. What is the number of pieces needing captured 45 days following the award? [p. 10 of RFQ]
The number of pieces that will need to be photographed as outlined on the TO is 250 pieces. All the photography does not need to be completed during a single photography session. The number of pieces needing to be captured 45 days after the start of the contract is to be determined after contract award and Intake Meeting with contractor and TPOC.
1. How many files will need delivered in the 2 month timeframe? (pg 10, 3. Period of Performance)
This will depend on how many posters or artifacts have been photographed by that date.
1. Will it be possible to obtain the entirety of the captures within a series of capture days at the beginning of the contract and produce files, proofs, and print products over the course of the full timeframe?
No, it will not be. We are unable to do 250 posters, for instance, in one single day; this would be done over a series of dates or visits. After each photography session, contractor has 10 days to produce files, proofs, etc. per section 4.4 List of Deliverables in the PWS, however it is understood that framed prints would require more time and when required, will be established at the Task Order level.

1. pg 6, 3.1.4

1. What level of restoration will the artifacts and documents needed?

1. If an artifact is marked as severe would restoration to light/ medium be acceptable?

Light Retouch – May only involve minor creases, discoloration, loss in the poster or artifact.

Medium Retouch – May involve color correction and or repair to a major area where there is loss in a poster or artifact.

Heavy Retouch – May involve, color correction or restoration, significant creases, discoloration or loss in poster or artifact, heave image repair.

Severe Retouch – May involve major color correction and restoration of poster or artifact loss of image or text, creases or losses would be throughout the poster or artifact.

It is possible that the contractor may find that a photograph of a specific poster or artifact may require a lesser degree of retouching than indicated in the Task Order. This can be discussed with the TPOC who will make a final determination for that specific poster or artifact image.

1. Would TPOC consider restoration of artifacts to be in varying levels, an artifact marked severe would have "restoration file 1: color correction and removing of creases and marks", "restoration file 1: reconstruction of damage, reconstruction of loss, repair content"
See response to question #17.

Retouching would be at various levels. TPOC would consult with the contractor regarding the level that the poster or artifact image that would need to be retouched.

1. Pricing table asks for 1-5, 6-20, 21+ works however the solicitation states a total of 250 artifacts as a single group of items. Will the collection be captured over a series of small visits or can there be a work plan with less visits and longer capture times?
TPOC will work with contractor to schedule photography in manageable groupings of posters and artifacts. It is understood that the 250 items that will be photographed and retouched will not take place in a single photography session.
1. Fine art canvas is mentioned in 3. Performance Requirements 3.1 Tasks 3.1.2. There is no line for the billable task to give pricing on this production of fine art canvas.
At this time, no fine art canvases are anticipated on this contract. Please see the edits to PWS Sections 2, 3.1.2, and 3.1.6, removing the requirements for canvas.
1. Will the TPOC or team member be responsible for all handling of the posters and prints?
The TPOC and NMMC staff will be responsible for all handling of posters, prints, and artifacts.
1. Under Task Pricing Table #17 through #21, what size or dimensions of framing should be quoted? Price vary by size, is there a size that should be estimated?
See #3.
1. Under Task Pricing Table #22-#23, what size or dimensions of matting on 4-ply should be quoted? Pricing vary by size, is there a size that should be estimated?
Please see the revised Attachment 1 – Pricing Table, Billable Tasks 22-23. Quoters are to provide a min/max pricing range for Tasks 22-23 based on the min/max sizes provided. The minimum price should be for the minimum size provided. The maximum price should be for the maximum size provided and is considered NTE (Not to exceed). The min/max sizes provided are based on the smallest and largest sized items the NMMC expects to potentially require services under this IDIQ contract.

(End of Q&A)

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 06-Sep-2024 11:00 AM to 09-Sep-2024 10:00 AM.

The following have been modified:

52.212-2 ADDENDUM

EVALUATION – Commercial Products and Commercial Services.

EVALUATION.

The provision at 52.212-2, Evaluation - Commercial Products and Commercial Services, applies to this acquisition as follows:

(a) The Government will award a contract resulting from this solicitation to the responsible quoter whose quote conforms to the solicitation.

(a)(1) The basis for award is PRICE per FAR 13.106-1(a)(2).

(a)(2) Evaluation procedures per FAR 13.106-2(b)

The following factors shall be used to evaluate Quotes:

1. Conforming to all matters with respect to the solicitation:

Quotes must clearly demonstrate the quoted items meet or exceed the extended description of services; must address each performance requirement with respect to the Performance Work Statement (PWS); must specify period of performance; and must meet all the terms and conditions of the solicitation.

1. Past Performance:

The apparent successful, prospective contractor shall have neutral to satisfactory past performance. Past Performance shall be evaluated in accordance with FAR 13.106-2(b)(3)(ii) and DFARS Subpart 204.76.

1. Price:

In accordance with FAR 13.106-3(a), before making the award, the Contracting Officer will determine that the apparent successful, prospective contractor’s proposed price is fair and reasonable.

· The quoter must complete and submit Attachment 1: Pricing Table with their quote submission. The quoter’s completed pricing table will be evaluated, including the average total price for each billable task across the total 5-year ordering period.

· The quoter must submit a price estimate for the TASK ORDER EXAMPLE herein in accordance with their completed Pricing Table, Year 1 pricing. This estimate should include a breakdown of pricing for the Task Order 1 Example, as well as a total price estimate for the Task Order 1 Example.

· For Billable Tasks that require a min/max price range, the Government will evaluate the maximum price of each task for price evaluation purposes.

Completeness and Accuracy: The Government will review the quotes for completeness and accuracy. A determination will be made as to whether the Quoter properly completed the pricing tables. The Quoter’s quote will be checked for mathematical correctness to include the following:

1) Checking arithmetic in all computations; and

2) Ensuring all prices are summarized correctly; and

3) All prices quoted are no more than two decimal spaces.

The Government intends to evaluate quotes and award a contract without discussions with vendors. Vendors should not expect requests for clarification or additional information from the Government. Award will be based on the initial evaluation of quotes received in response to the solicitation. Therefore, quoters are cautioned that their initial quotes should contain their best terms from a technical and price standpoint. However, the Government reserves the right to conduct discussions with vendors if later determined by the Contracting Officer to be necessary. The Government may reject any or all quotes if such action is in the public interest; and may waive informalities and minor irregularities in quotes received.

PERFORMANCE WORK STATEMENT

Performance Work Statement (PWS) Photography of Posters and Archival Artifacts National Museum of the Marine Corps (NMMC)

1. Background The National Museum of the Marine Corps (NMMC) acquires, stores, preserves and exhibits the material history of the Marine Corps from 1775 to the present. In addition, the NMMC educates Marines on their traditions, supports the efforts of the Marine Corps command museums, as well as serves as a source of information for Marines, veterans, the academic community, and the public. As part of its mission, the NMMC is tasked with collections stewardship responsibilities to provide professional expertise for all museum artifacts and works of art within the collection located throughout all Marine Corps facilities.

The NMMC collection includes artifacts made of paper like movie posters, lobby cards, recruiting posters, recruiting advertisements and materials, posters documenting the American home front during war, propaganda, and archival wartime service-related souvenirs, Marine Corps themed signs, wall décor and other archival materials that document Marine Corps culture.

1. Scope This requirement is for professional fine art photography, scanning, and the creation of reproductions of original posters, signs, and or other two-dimensional and three-dimensional archival printed and framed artifacts that document Marine Corps history and culture. The collections range from the late 19th century to the present day and were produced and/or created by the U.S. Marine Corps Recruiting Command, the U.S. Government, movie production companies (MGM, Warner Bros., Republic, Mascot, Columbia, Pathe, 20th Century Fox, Paramount, etc.), personal donors, among others. Most of the artifacts are archival materials and are made of paper. Others are painted or printed on cardboard, metal, wood, and other substrates. Some posters are laminated, and a few are mounted and affixed to other types of backings. The condition of the artifacts ranges from pristine to very fragile. The scope of this requirement is to professionally photograph and/or or scan posters and other archival materials and artifacts for use as a master digital archival record and to have images to support research requirements and requests for reproductions, and to create professional fine art reproductions on fine art paper(s).

The Government intends to award an Indefinite Delivery Indefinite Quantity (IDIQ) contract for this requirement with a 5-year ordering period during which individual Task Orders may be issued/awarded under the master IDIQ contract. The Contractor shall perform services as identified in each Task Order.

1. Performance Requirements

2. Tasks

0. Intake Meeting and Site Visit to NMMC Museum Support Facility (MSF) The contractor shall be available for an intake meeting with twenty-five (25) days of contract award to review a sampling of posters and artifacts requiring photography and review workspace for photographing the collection. The intake meeting and review of collection and workspace may be completed in a single visit. Meeting and site visit will be coordinated directly with the TPOC and take place at the NMMC Museum Support Facility (MSF).

0. Photography, Scanning and Reproduction of Posters and Artifacts Photographic and scanning task orders under this contract may range from a single item to three hundred (300) items, and task orders may be spread out across several days of physical photographing/scanning sessions to be coordinated between the Contractor and TPOC. Printed reproduction projects are usually limited to 1-20 prints on fine art paper(s). To minimize handling and reduce the risk of damaging fragile artifacts, most photographic tasks will be performed at the MSF, and the Contractor must provide any equipment required to perform requirements.

No photographic or scanning efforts shall modify or harm Museum posters or archival artifacts. The Contractor shall be able to identify the amount of space and time needed to complete task orders under this contract and provide the TPOC with potential options, as applicable, for completion of large photography projects for review by the TPOC.

0. Digital Images

1. Unless otherwise specified by the Technical Point of Contact (TPOC), all digital images will be captured at 300dpi for output at 60” along the long dimension at a minimum size of 75 mb TIF file. Unless otherwise specified by the TPOC, the contractor will be required to provide a 4 x 5” Proof Print and digital files for each artifact photographed to include the following:

0. High Resolution TIF file – 20” at 300 DPI

0. JPG – 20” @ 300 DPI

0. Med Resolution JPG – 10” @ 300 DPI

0. Low Resolution JPG – 5” A 72 DPI

0. At the end of each task order jpegs and TIF file of each poster or archival artifact will be provided to the TPOC via Dropbox within ten (10) days after session. An external hard drive containing a high resolution .TIF and .jpeg file for each item scanned and/or photographed will provided at the end of the performance year.

1. Contractor must provide digital images of posters and archival artifacts photographed in their original form as well as any identified posters or archival artifacts requiring retouching, as identified in task orders.

0. Retouching photography Images Contractor must also be able to digitally retouch images produced of items photographed at the following levels:

•Digital Retouch - Light
•Digital Retouch - Medium
•Digital Retouch - Heavy
•Digital Retouch - Severe

0. Reproductions, Printing and Digital Materials All print and digital materials shall be archival quality and museum grade, unless otherwise specified on any task order under this contract. The contractor shall provide a color Proof Print for each reproduction print, which shall be approved by the TPOC before the final reproductions/prints are produced unless the TPOC specifically advises the Contractor that proofs are not required. The type of print materials that shall be used are generally determined by the original poster or archival artifact. Original works on paper shall be reproduced on fine art paper.

0. Printing and Framing Tasks Printing tasks may range in quantity from a single piece to more than a dozen. Printing tasks may require matting and framing of individual pieces. Any printing task under this contract shall have an identified period of performance for the task to be completed.

Contractor must be able to produce prints on fine art paper(s) in the following sizes (unframed):

•11 x 14” print
•14 x 22” print
•20 x 30” print
•22 x 28” print
•14 x 36” print
•24 x 36” print
•28 x 41” print

The Contractor must have the ability to provide framing and matting for reproduction prints.

0. Scheduling Photography Scheduling Photography tasks (“tasks” refers to a scheduled photography session as specified by an applicable task order under this contract to photograph posters and archival artifacts) will involve a five (5) to ten (10) calendar day lead time before work begins. Specific lead times will generally be defined at the task order level.

0. Recommendations The Contractor shall be required to make recommendations to the TPOC on imaging methodologies, project scheduling, and printing options. All work involves creative problem solving to professionally document rare, unique, and valuable collections of the NMMC.

3.1.9. Contractor Coordination with TPOC: The Contractor shall maintain contact by phone, mail, email or in person (whichever is most efficient) with the TPOC in order to resolve difficulties or make decisions regarding any task order under this contract.

1. Applicable Information and/or Documents

3. Government Technical Point of Contact (TPOC): TPOC contact information to be provided to the Contractor at time of award.

0. The TPOC shall provide background material and information on posters and archival artifacts to the Contractor, as applicable, for the materials requiring photography. In some cases, there is limited historical data available and shall be provided upon request of the Contractor.

0. The TPOC may be assisted by multiple subject matter experts. The subject matter experts shall provide technical guidance and clarification in the absence of the TPOC.

0. The TPOC and/or subject matter experts shall review and approve all work. All work that does not meet the TPOC’s approval shall be rejected and reworked according to the TPOC and/or subject matter expert direction.

0. The TPOC shall have ten (10) working days to respond to the Contractor requests for information, proposals, or queries by either phone or email.

0. The TPOC shall host initial progress meetings, generally in person or via telephone/teleconference call. Schedule, frequency, and duration are to be determined.

0. The final inspection and acceptance of prints, reproductions, images, photo proof prints and any other materials shall take place upon completion of photography projects and will be accepted by the TPOC.

3. Period of Performance: The Government intends to award an Indefinite Delivery Indefinite Quantity contract (IDIQ) for this requirement with a 5-year ordering period during which individual task orders may be issued/awarded under the master IDIQ contract. The ordering period for the base year shall begin upon the date of contract award.

3. Place of Performance: The Contractor shall examine the workspace at the NMMC Museum Support Facility (MSF). The majority of photography will be accomplished at the MSF in either the artifact processing room or high-density artifact storage area.

2. The Contractor shall be responsible for their transportation to and from any NMMC facility unless otherwise agreed upon with the TPOC.

2. The Contractor may be required to visit other Marine Corps facilities, as directed by the TPOC, to photograph posters or archival artifacts.

2. Many of the posters and archival materials intended for photography and scanning are extremely fragile. Due to the fragility, the physical photography and scanning shall be completed on site at NMMC and USMC facilities in the Northern Virginia and Washington DC areas. Place of performance shall be specified at the task order level.

3. List of Deliverables: The contractor shall provide the NMMC/TPOC with all finished 4” x 5” proof prints, digital images, scans, thumb drives, reproductions and any other digital media.

Deliverable Name
Description
Frequency or Required Date
Method of Delivery
4”x 5” proof prints
See 3.1.3
Proof is required for each item photographed/scanned, to be established at the task order level
Provide via mail delivery or in-person delivery, whichever is most efficient
Digital images
See 3.1.3
Digital images are required for each item photographed/scanned, to be established at the task order level
Provide via thumb drive, CD, or digital drive drop box
Scans
See 3.1.3
Varies depending on type of archival material, as specified at the task order level
Provide via thumb drive, CD, or digital drive drop box
Dropbox Images
See 3.1.3
After each Task Order jpeg and TIF files are to be provided within 10 days
Provide jpeg and TIF files via Dropbox
External Drives
See 3.1.3
External drives are required for each performance year.
Provide via mail delivery or in-person delivery, whichever is most efficient
Reproductions
See 3.1.5
To be established at the task order level
Provide via mail delivery or In-person delivery, whichever is most efficient
Framing
See 3.1.6
To be established at the task order level
In-person delivery

3. Government Property: The Government shall provide the posters and archival artifacts to be photographed or scanned. Some artifacts or their images may be under public domain, and others may not. The Contractor may produce reproductions of images under public domain but will not be permitted to reproduce any images that are not under public domain. Further details to be established at the task order level.

3. Delivery Address: Any/all deliverables shall be delivered to one of the following locations in coordination with the TPOC:

5. National Museum of the Marine Corps (NMMC) 1775 Semper Fidelis Way Triangle, VA 22172

5. NMMC Museum Support Facility (MSF) 17001 Interstate Dr. Ste. 130 Dumfries, VA 22026

3. Hours of Operation: The Contractor must be available to work during normal work hours in coordination with the TPOC, from 8:00 a.m. - 4:30 p.m., Monday through Friday, except on U.S. Federal Holidays. Visit Federal Holidays (opm.gov) to view the applicable listing of U.S. Federal Holidays.

3. Contractor Personnel / Qualifications:

7. The Contractor shall provide all materials, equipment, and supplies as needed, to fully carry out the requirements herein.

7. The Contractor shall provide the names and contact information for any professional staff under their employ who may work on any photography project required under this PWS.

3. Travel:

8. The Government intends to award a Firm-Fixed Price (FFP) contract type. The Contractor is responsible for all travel/per diem related expenses required to perform this contract. Any anticipated travel costs in the performance of this contract shall be included as part of the quoted rate(s). Any travel matters associated with the performance of this contract are the sole responsibility of the Contractor. The Government shall not have any financial responsibility other than paying for the FFP on each line item.

3. Government Facility Access: The Contractor must possess a current valid sate driver’s license and/or form of government approved official identification containing a personal photograph. The identification is required for security purposes to access Government facilities.

3. List of Attachments:

· Attachment 1 – Pricing Table: Each quoter must complete and submit Attachment 1 with their quote package.

(End of PWS)

(End of Summary of Changes) image1.wmf