Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Database Rack Relocation Service, newest first.
File Type Posted
RFQ_07_017_2019.pdf PDF
Urgent_&_Compelling_J_&_A.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) for Relocation Service of the Data Racks

1. Scope - Marine Corps Base G-6 has twenty seven (27) empty 19 inch data racks (89.25”H, 24”W, 48”D) in Diamond Hall bldg 3098 that needs to be re-located to Newlin Hall bldg 3255 and properly secured to the floor for the purpose of consolidating data centers Marine Corps wide.

2. Task -

a. The contractor shall install two (2) 240VAC 30amp L630R twist lock receptacles per server rack for a total of 54 240VAC 30Amp L630R twist lock receptacles. Each rack will have rack mounted PDU’s that will be energized from the newly installed L630R receptacles. Having two receptacles per server rack shall serve as redundancy should one phase lose power due to a power outage.

b. The contractor shall dispose of all debris once work is completed and restore the area to its original condition.

c. Damages that occur during fulfilling this requirement shall be repaired at the expense of the contractor and the technical point of contact shall re-inspect to ensure damages are 100% corrected.

d. The contractor shall Inform the data center manager if the work could potentially cause any fire alarms to go off so that a hot permit is submitted to the fire inspector.

3. Government Responsiblity -

a. The Government shall ensure that the contractor be escorted at all times and have full access to fulfill each task.

b. No deviation from this performance work statement is authorized.

4. Place of Performance –

a. Diamond Hall (Building 3098) and Newlin Hall (Bldg 3255).

b. Physical Address for Relocation Services:

The racks will be unistalled from Diamond Hall (Bldg 3098) 3098 Range Road. Quantico, VA.

22134 to new destination Newlin Hall (Bldg 3255) 3255 Caitlin Ave. Quantico, VA. 22134 and re-installed to complete the relocation service.

5. Period of Performance – period of performance is from of 26 July 2019 to 25 August 2019

6. Points of Contact --

Technical POC – TBD

Alt POC: TBD