Brand_Name_J&A.docx

DOCX document 27 KB Posted

Attached to
Trojan UV 3000 Plus Replacement Parts Federal contract opportunity
Solicitation number
M0026418T4329
Issued by
United States Marine Corps

About this file

Brand Name J&A

View the file

Other files for this federal contract opportunity

Other files attached to Trojan UV 3000 Plus Replacement Parts, newest first.
File Type Posted
Combined_Synopsis_Solicitation_Amendment_0001.docx DOCX document
Combined_Synopsis_Solicitation.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Justification for Other than Full and Open Competition – FAR Part 13 Acquisitions under the SAT

MEMORANDUM TO THE FILE

Subj: JUSTIFICATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION FOR A FAR PART 13 ACQUISITION UNDER THE SIMPLIFIED ACQUISITION THRESHOLD

I. BACKGROUND:

1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement (or portion of the requirement to be sole-sourced) is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

Replacement Parts for the Trojan UV 3000 Plus at the waste water treatment plant.

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED ON THE FOLLOWING (select all that apply):

A. ___ ONLY ONE RESPONSIBLE SOURCE (select all that apply):

1. ___ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.

2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.

3. ___ OTHER REASONS.

B. X BRAND NAME

Item required must be a brand name, product, or feature of a product, particular to one manufacturer.

Only Trojan UV parts are compatible with the existing equipment at the waste water treatment plant. The current equipment installed is the Trojan UV 3000 Plus. The Government would incur a substantial duplication of cost if it were to resolicit for a complete new system to allow for full and open competition. Instead, Brand Name replacement parts will be acquired.

C. ___URGENT AND COMPELLING. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:

1. Date on which the requirement was first identified:

2. Required delivery date/period of performance:

3. Explanation of why delivery/commencement of services by the date mentioned above is required: