About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a federal procurement. The amendment changes the convection oven specification from electric to gas and adjusts the required response date from 22-Sep-2025 02:00 PM to 23-Sep-2025 02:00 PM. The solicitation involves procuring multiple kitchen equipment items for CLIN 0001-0010, including a Two Section Roll in Refrigerator (5 units), Blast Chiller (1 unit), Double full size Gas Convection Oven (1 unit), Tilt Skillet (2 units), Stainless Steel Tables (2 units), Stainless Steel Worktables (2 units), Speed Racks (8 units), Push Carts (9 units), and an Electric Pallet Truck. The final CLIN 0010 covers installation and removal services, which include removing existing units, delivering them to a specified building, picking up new units, uncrating, assembling, connecting utilities, and performing necessary modifications and testing.

View the file

Other files for this federal contract opportunity

Other files attached to DINNING HALL EQUIPMENT, newest first.
File Type Posted
M0026325Q0049 Dinning Hall 6012.pdf PDF
Synopsis 25Q0049 MH 6012.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE SCHEDULE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

THE PURPOSE OF THIS AMENDMENT IS TO CORRECT THE SPECIFICATIONS SHEET. CONVECTION OVEN IS CHANGED FROM ELECTRIC TO

GAS.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Sep-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M0026325Q0049

X 9B. DATED (SEE ITEM 11)

12-Sep-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Sep-2025

CODE

REGIONAL CONTRACTING OFFICE

ATTN: JAYDIAN TOOMIN

P. O. BOX 5069

PARRIS ISLAND SC 29905

M00263 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

M0026325Q0049

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 22-Sep-2025 02:00 PM to 23-Sep-2025 02:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0003

The CLIN description has changed from Electric Convection Oven to Gas Convection Oven.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SALIENT CHARACTERISTICS

MH 6012

CLIN 0001

Two Section Roll in Refrigerator Quantity of 5 68 in. W x 39 in. D x 843⁄4 in. H

11.8 A, 1⁄2 HP

115 V/60 Hz/1 ph, 9-ft. cord with a NEMA 5-15P plug Temperature holding range: 33-38 degrees F Accepts 27-in. W x 29-in. D x 66-in. H roll-in racks with inboard castors Heavy-gauge stainless steel ramp simplifies rolling racks inside Damage-and corrosion-resistant doors, heavy-duty stainless steel Aluminum sides are finished to match the doors Interior side walls and back are made of aluminum Stainless steel interior floor and ceiling Bumpers protect interior walls

CLIN 0002

Blast Chiller Quantity of 1 Accepts (1) 26"W x 32"D x 731⁄2"H Mobile Rack 200 lb. Chill Capacity 120 lb. Freeze Capacity 51"W x 44"D x 88"H 208/60/1 Condensing Unit, air cooled 208v/60/3 ph

CLIN 0003

Double full size Gas Convection Oven Quantity of 1 Double stack Stainless Steel Interior (per oven): 281⁄2 in. W x 211⁄2 in. D x 20 in. H Overall dimensions: 38 in. W x 431⁄2 in. D x 63 in. H 50 A (1 ph)/30 A (3 ph), 11.9 kW (per oven), 1/2 HP

240 V/60 Hz, 1/3 ph(convertible) 4 Casters

CLIN 0004

Tilt Skillet Quantity of 2

208/240V 3PH (LMX100DE)-QS

40-gallon pan, integrated iVarioBoostenergy management system, 85°to 480°F temperature range, iZoneControlwith up to (4) individually controlled heating zones, iCooking Suitei ntelligent cooking system, 6-point sensor core temperature probe, Auto Lift (baskets and arm required for use), portioned water dispenser, retractable hand shower, Ethernet interface, WiFi enabled, includes stand with plastic feet, 208/240v/60Hz/3-ph,

34.0 kw, CE, ETL, NSF, IPX5 Dimensions 23.88(h) x 53.75(w) x 35.25(d)

CLIN 0005

Stainless Steel Table Quantity of 2 72 x 36,35 in table height, Commercial Kitchen and Food Processing Rust resistant, Bottom shelf included Rounded edge.

CLIN 0006

Stainless Steel Worktable Quantity of 2 96 x 36 Resist rust and corrosion 1 5/8" diameter steel tube legs with adjustable bottom shelf.

35" table height.

All stainless-steel construction.

Type 304 top.

1 1/2" thick top with rounded edge.

NSF certified

CLIN 0007

Speed Rack Quantity of 8 Aluminum Rust resistant 20 Tier With Wheels For full and half sheet pans No taller than 60 inches 26” L x 20” W x 60-67” H

CLIN 0008

Push carts Quantity of 9 Stainless Steel Food grade quality 31 x 19 x 33 500 capacity Three shelves, 12” apart 4 rubber swivel casters, 2 locking

CLIN 0009

Electric Pallet Truck

Electric pallet tuck 6 hours service per charge: four 6-volt, 224 Ah maintenance-free batteries with built in charger.

Push-button lift controls

CLIN 0010

Install/Removal Contractor shall remove existing units and deliver them to building 295; pickup new units from building 500A; uncrate, assemble, set in place and connect utilities within 4 feet, insulate steam pipe and hot water lines as needed, new copper drain lines from equipment to floor sinks as needed, modify duct work as needed, field weld and polish seams as needed, remove debris from job site, start up and testing of new equipment.

(End of Summary of Changes)