About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a cubicle wall replacement project. The solicitation (M0026325Q0046) has been amended to extend the response date from 16-Sep-2025 to 18-Sep-2025, with clarifications added to address vendor questions. The project involves procuring and installing new cubicle walls that must accommodate existing AIS Divi furniture, with panel heights between 65-82 inches (optimally 82 inches). Key details include that base personnel will handle electrical/data disconnects and reconnects, no whiteboards or tackboards are required, and there are no SIPR or NIPR requirements associated with the project.

The amendment provides specific guidance about the cubicle wall replacement, confirming that the current furniture will be moved and replaced after the new walls are erected. Vendors are instructed that the new cubicle walls must be compatible with the existing AIS Divi furniture, and while the same manufacturer is not mandatory, the new panels must fit the current workstations. The solicitation is issued by the Regional Contracting Office located in Parris Island, SC, with the modification dated 11-Sep-2025.

View the file

Other files for this federal contract opportunity

Other files attached to Cubicle Install, newest first.
File Type Posted
M0026325Q0046.pdf PDF
Attachment 2.pdf PDF
Attachment 1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this modification is to post the questions and answ ers gathered from interested vendors. The Due date w ill be extended to 9/18/2025.

Clarif ications to the questions and answ ers have also been attached w ithin Section C.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Sep-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X M0026325Q0046

X 9B. DATED (SEE ITEM 11)

04-Sep-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Sep-2025

CODE

REGIONAL CONTRACTING OFFICE

ATTN: CAMERON THACH

P. O. BOX 5069

PARRIS ISLAND SC 29905

M00263 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

M0026325Q0046

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 16-Sep-2025 02:00 PM to 18-Sep-2025 02:00 PM.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by full text:

CLARIFICATIONS

1. Where do they plan on storing the existing furniture from the cubes while the new walls are being built?

A: Instruction will be given to the awardee.

2. I'm assuming since they are keeping the existing furniture that are in the cubicles they are using the same manufacturer for the new cube walls?

A: This solicitation is for both procurement of cubicle walls and installation. Please review attachment one to detail each cubicle. The same brand may be used, but is not required if the current furniture fit into the new panels/cubicles.

3. If so, what manufacturer / company are they getting the new cube walls from?

A: See above

4. In Attachment 1, under “Notes,” it states: “All new cubicles must be able to fit/house current furniture.”

Could you please confirm whether this project is for full replacement of all cubicle walls and workstations, or whether this project is only for cubicle walls with the existing workstations remaining?

A: This project will be a replacement of all cubicle’s walls, the current furniture will be moved and placed back after the walls have been erected.

5. Could you confirm the overall heights of the panels?

A: Attachment 1 notes mention that all cubicles’ heights must be between 65-82”. The optimum height is 82 inches.

6. Could you confirm the requested height of the glass panels?

A: See above.

7. Are whiteboards or tackboards required with the cubicle systems?

A: No

8. Who will be responsible for electrical/data disconnects and reconnects during installation?

A: There will be base personnel that will be assigned within the task to disconnect and reconnect.

9. Are there SIPR or NIPR requirements associated with this project?

M0026325Q0046

A: No.

10. In the Notes in Attachment 1, “Divi” is mentioned. Divi, a product line of AIS, is a wholly owned subsidiary of Haworth (a large manufacturer). Could you confirm if the AIS Divi line is being precluded from this solicitation?

B: No – the current furniture comes from AIS Divi, the new cubicle walls must be able to fit the current furniture.

(End of Summary of Changes)