QUESTIONS Recycling Baler.docx
DOCX document 13 KB Posted
- Attached to
- Recycling Baler - Cardboard Federal contract opportunity
- Solicitation number
- M0026324Q0035
- Issued by
- United States Marine Corps
About this file
This document is a set of questions and answers related to a Request for Quote (RFQ) for a Recycling Baler. The RFQ, numbered M0026324Q0035, is being issued by the United States Marine Corps for the purchase and installation of a new recycling baler, the relocation of an existing baler on-site, and the removal of an older baler.
The key details include that the new baler will be installed at a ground-level recycling center, while the existing baler being relocated is currently in storage and will also be installed at ground level. The entrance doors for bringing in the balers are 14' wide by 12' high. The bid cannot be extended and no photos of the existing equipment can be provided, with a site visit or virtual visit required instead. The document also specifies that the older baler being removed will be taken off-site entirely.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 30 BALER AMENDMENT.pdf | ||
| Picture.pdf | ||
| Synopsis Baler.docx | DOCX document | |
| RFQ M0026324Q0035 - Cardboard Baler.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ: M0026324Q0035 Recycling Baler questions and answers
1. Is current building ground level or dock or both access? Both entrance levels are ground level.
2. Is building we are moving old 1295 to dock or ground level or both? Ground level.
3. You mention pulling 1272 from storage, but doing what with it? Is this baler in same storage area as 2? This baler is being entirely removed offsite.
4. Pics from all sites and of existing equipment: pictures cannot be provided, site visit or virtual site visit is preferred due to time strain.
5. Extend bid: Cannot be extended
6. Is this bid to remove one baler and put it in a storage area? This bid includes the purchase of one new baler with installation, relocation of an existing baler on site (with setup/installation), and the removal of an older baler.
7. The one going in storage is it being installed or to be just kept in storage? Being installed
8. Install one new baler in recycling center? Yes the brand new baler will be installed in recycling center.
9. Is the entrance we would bring the baler in and out ground level or dock? Yes all entrance sites are ground level.
10. I will also need to know the entrance door height and width? 14’ wide by 12’ high