24Q00110001 Dishwashers Amendment.pdf
PDF 624 KB Posted
- Attached to
- Food Service Dishwashers Amendment Federal contract opportunity
- Solicitation number
- M0026324Q0011
- Issued by
- United States Marine Corps
About this file
This is a solicitation for food service dishwashers. The United States Marine Corps intends to solicit and award a firm fixed price contract for disposable pillows under solicitation number M0026324Q0011. This is a 100% service-disabled veteran-owned small business set-aside issued using commercial procedures in accordance with FAR Part 12. The North American Industry Classification System code is 332215 with a size standard of 1,000 employees. Offerors must submit proposals by February 28, 2024 at 2:00PM Eastern Time. The primary point of contact is Emani Gray at emani.gray@usmc.mil or 843-228-3258. The solicitation and any questions will be addressed according to the FAR and DFARS provisions specified in the document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 24Q0011 Dishwashers RFQ.pdf | ||
| M0026324Q0011 Combo Synopsis - Dishwashers.pdf | ||
| 24Q0011 Dishwashers RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M320004464557
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation Amendment issued to:
1. Extend the solicitation due date to 3/6/2024.
2. Add contractor questions and answ ers to Section J.
3. Add images and dimensions to Section J.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Feb-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M0026324Q0011
X 9B. DATED (SEE ITEM 11)
31-Jan-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Feb-2024
CODE
REGIONAL CONTRACTING OFFICE
ATTN: EMANI GRAY
P. O. BOX 5069
PARRIS ISLAND SC 29905
M00263 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
M0026324Q0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 28-Feb-2024 02:00 PM to 06-Mar-2024 02:00 PM.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been added by full text:
PICTURES AND DIMENSIONS
Room Entrance: 85 inches in height 71 inches width Pot Shack Machine: 14’ feet 11” inches length 41.5 inches wide 69 7/8 inches in height Belt 30 inches wide
Pan pass through: 31 inches wide and 22 inches in height Exhaust Pipe: 48 inches in height Power wash sink 11 feet 3 inches in length 32 inches wide and 44 inches from floor to top
QUESTIONS AND ANSWERS
1. New machine overall length? 14ft 7.3 inches length, 3ft 10.3 width
2. New machine to be direct steam powered or electric powered? Electric (breaker wasn’t identified).
3. Blower dryer option required? Yes.
4. Remove and dispose of existing dish machine? What is the existing equipment? (Provide measurements if possible) Dispose is not required. Remove existing equipment to the back dock of building.
5. Receive, move, and set in place new equipment? Yes.
6. Final connections to existing utilities within 5 ft? Yes.
7. Details for duct work between dish machine finished ceiling? (i.e. modify existing or fabricate and provide new). Only is necessary modify the existing vent duct.
8. Ceiling height? 10ft ceiling
9. Standard working hours or overtime/weekends/overnight? Standard working hours will be from
8 am until 6 pm weekly no overtime or weekends. Contractors’ choice on when day will start and end within the hours.
10. Clearance: free and clear access to the dish room (doorways, hallways , loading dock, elevators)?
There are two entrances that are close to the pot washroom. Both have clear lanes and wide spaced to remove and move the equipment to and from the area.
11. For delivery: Can facility store the machine till installation? Receiving dock or loading ramp or other? we can no store equipment due to the limitation on warehouse space. The loading dock to the building is standard dock height with no lift capabilities. There is a loading ramp but only with 5ft of moveable space.
12. Floor sink or wall drain? Floor sink
13. Is a site visit required for assessment? No but prefer vendors look before they bid for the contract.