This document is an amendment to a solicitation for replacement steam dryers. The amendment provides responses to questions from offerors. It confirms that new dryer ductwork from the dryer to the roof termination is required. It clarifies that a new roof curb, utility piping replacements, isolation valves, or electrical replacements are not required. The steam pressure at existing dryers is 125 pounds. A lead time of 24-26 weeks for new steam dryers is acceptable. The laundry processes 300 pounds per week of various goods and operates from 6:30am to 3:00pm. Installation is to occur during off hours when employees are not present to avoid impacting operations. The response deadline was extended from July 21, 2023 to July 24, 2023. The solicitation is for the United States Marine Corps to replace steam dryers in a laundry facility.

View the file

Other files for this federal contract opportunity

Other files attached to STEAM DRYERS, newest first.
File Type Posted
Amendment 0001.docx DOCX document
23Q0041 Solicitation.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M0026323Q0041

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS

M0026323Q0041 Amendment 0002

QUESTIONS
RESPONSES

1. Verify if the dryer ductwork is to be replaced, in its entirety, from the dryer connection to the termination of the ductwork on the roof?

Yes

1. Please validate if a new roof curb is needed to be installed around the ductwork roof penetration?

No

1. Verify if the water, steam, condensate, and compressed air piping is to be replaced from the connection point on the dryer to the corresponding utility supply header?

No

1. Please validate if new isolation valves are to be installed in each of the new utility connections (water, steam, condensate and compressed air)?

No

1. Verify if new electrical wiring and conduit needs to be replaced from the connection point on the dryer the closest disconnect or if the electrical is to be replaced to the supplying electrical panel?

No

1. Please confirm the steam pressure at currently installed ADC 310 dryers.

The steam pressure is 125

1. Verify that a lead time of 24-26 weeks is an acceptable lead time for delivery of new steam dryers.

Yes

1. Please provide the pounds and type of goods are being processed on a weekly basis through the existing ADC 310 dryers.

300 pounds; Gortex, Pillows Cases, Camouflauge Utilities Uniform, Mesh Bags, Towels, Green Blankets

1. Verify what shifts the laundry operates?

6:30am - 3:00pm

1. Please validate if the installation work associated with this solicitation is to be performed during normal operating hours or if it is to be performed off hours to not impact laundry operations?

The best time is off hours. The employees leave at 3:00pm.

The following have been deleted:

QUESTIONS AND ANSWERS

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 21-Jul-2023 02:00 PM to 24-Jul-2023 02:00 PM.