SF 1449 Mess Hall Equipment Amendment 1.docx
DOCX document 30 KB Posted
- Attached to
- MESS HALL EQUIPMENT Federal contract opportunity
- Solicitation number
- M0026322Q0041
- Issued by
- United States Marine Corps
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 1449 Mess Hall Equipment.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M0026322Q0041
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SALIENT CHARACTERISTICS
CLIN 0001 CONVECTION OVEN, GAS
Garland/US Range Model No. MCO-GS-20M Master Series Convection Oven, gas, double-deck, standard depth 41- 1/2", (2) speed fan, 4.3" easyTouch digital control with simple Press&Go, Cook 'n' Hold, timers, & recipe functions, dependent 60/40 doors with windows, stainless steel front, sides & top, porcelain cavity, 24" cooking cavity height, with (6) chrome plated oven racks on 13-position rack guides, 6-1/2" legs, EnerLogic Technology, 120,000 BTU (Garland), UL, cUL, NSF Dimensions 57.5(h) x 38(w) x 41.25(d) 2 ea (2) year limited parts & (1) year labor warranty, Door warranty (5) year limited parts except window, covers products purchased and installed in the USA & Canada only, standard 2 ea Gas type to be specified 2 ea NOTE: Contact factory for other connection options 2 ea (2) 120v/60/1-ph, 9.8 amps, NEMA 5-15P (3/4 HP motor), standard 1 ea FREIGHT DEST: 1 Estimated Freight Charge for item above.
CLIN 0002 COUNTER, HOT FOOD
4 Well Hot Food Counter designed for a patron to be served, needs to have a sneeze guard that covers entire counter with measuments of no less than 6 to no more 8 inch tempered glass cover on non operator/patron side of the counter, counter must fit within 59-7/16" L. X 28-7/8" W area of space. Counter top 14 Guage stainless steel top and 18 Guage or better stainless steel body, all wheels must have safety locks that are easy to engage and disengage, voltage must be 208/3ph 30 amps. Operator side need to be open with a botton shelf and all other sides needs to be enclosed, counter controls for on and off switch or dial along with temperture selectors or dials must also be on operator side.
CLIN 0003 ICE MAKER WITH BAGGING DISPENSER
Cube style, air-cooled, self-contained condenser, production capacity up to 1077 lb/24 hours at 70°/50° (816lb. AHRI certified at 90°/70°), small cube size, indicating lights, adjustable purge control, one-touch cleaning, harvest assist, front facing removable air filter, unit specific QR code, stainless steel finish antimicrobial protection, 208- 230v/60/1-ph, 16.0 amps, cULus, NSF, CE, engineered and assembled in USA 1 ea. NOTE: Sale of this product must comply with MSRP Policy; contact your Representative for details 1 ea. 3 year parts & labor warranties 1 ea. 5 year parts & labor warranties on Evaporator 1 ea. 5 year parts on compressor & condenser 1 ea. SSM2-P SSM Plus Water Filter Assembly, twin system, 3.34 gallons per minute max flow, designed for cubers over 650 lb. and up to 1,200 lb., and for and flakers and nuggets over 1,200 lb., for antimicrobial protection, NSF, cULus. 1 ea. SC20-A Coarse Pre-filter, 20"", 10 gallons per minute max flow, single system for cubers up to 650 lb., and for flakers, nuggets & nugget dispensers up to 1,200lb."
Bagging Dispensing System Semi-Automatic Ice Bagging & Dispensing System, 1000 lbs. capacity ice storage with auto ignition, dispense most cube ice up to 1” & Chewable ice, control panel, foot pedal, lockable clear window, adjustable bag stand, insulated poly-molded interior, blower, timed dispense mode, stainless steel full base, with 1 wicket of at least (125) 8 lb capacity bags, with a (2) year parts and labor warranty
CLIN 0004 INSTALLATION
Includes labor and materials, remove existing units and deliver them to building 500A; pickup new units from building 500A; uncrate, assemble, set in place and connect to utilities; startup and test. Government to provide all required equipment specification to within 5 feet of final connection.
(End of Summary of Changes) image1.wmf
File details come from the government source that posted it. Updated .